• Title/Summary/Keyword: Quantity take off

Search Result 90, Processing Time 0.025 seconds

A Study on Automated Quantity Take-off Methods of Earth Works in Road Design using 3D Design Concept (3차원 설계를 통한 도로설계단계의 토공 자동물량 산정 방안에 관한 연구)

  • Cho, Myunhwan;Kim, Nakseok;Chae, Jae-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.277-283
    • /
    • 2016
  • Recently, the interests in three-dimensional design and BIM(Building Information Modeling) are increasing in civil engineering sector and the researches about three-dimensional design and quantity take-off methods for civil engineering structures have been conducted. However, these studies are just carried out the 3D design and quantity calculation of civil structures on the road or railway such as bridges and tunnels. The study on the quantity take-off methods and the evaluation of calculated results on the earth works should be performed in more detail. Based on these backgrounds in mind, the study was conducted the three-dimensional road design and evaluated the quantity take-off results on the earth works using 3D calculation method(average end area method, prismoidal method and composit method). The calculated quantity from composit method showed about 5% error of measuring efficiency than the average end area method, and when reporting the quantity calculation of earth works, it is necessary to specify the calculation method using quantity take-off of earth works.

An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off (BIM기반 물량산출 완성도 측정을 위한 지수 개발)

  • Lee, Chang-Hee;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.79-92
    • /
    • 2011
  • Quantity take-off is one of the critical tasks that determine the cost of a construction project, and its result should be accurate and reliable. BIM-based quantity take-off is a very attractive process for practitioners since the quantity take-off can be done automatically in a fast and accurate way. However, the result of BIM-based quantity take-off can be varied depending on how BIM was modeled. As a project progresses, more detailed design information is getting available, and it can be expected that the degree of completeness and accuracy for the BIMbased quantity take-off is going to be improved as well. However, when estimation is performed at each stage of a project life-cycle, there is no way to measure or forecast how accurate of the quantity take-off result from the BIM data given at the current stage. Therefore, this research derived factors that affect the BIM-based quantity takeoff and developed a methodology and framework to measure and forecast the completeness of BIM-based quantity take-off. The measurement framework and index that are proposed by this research was verified and validated for their consistency and feasibility through six pilot projects.

A Study on the Accuracy of BIM-based Quantity Take-Off of Apartment Interior (BIM기반 공동주택 마감 물량 산출 정확도 연구)

  • Lee, Moon-Kyu;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.12-22
    • /
    • 2013
  • Construction industry throughout the construction projects life cycle using BIM is able to manage information. Among them, BIM-based quantity take-off is directly connected to the data of the construction business as an important management element that is essential for one of the management factors of feasibility study and economic analysis. In addition, the result of BIM-based quantity take-off can be varied depending on modeler, so the exact guideline for BIM modeling is necessary. The BIM-based quantity take-off in terms of reliability and accuracy of the information is very important. Therefore, this study verified the BIM modeling of the apartment interior materials using both separate object and composite object was validated the quantitative comparison of the difference in BIM-based quantity take-off for accuracy & reliability judgment of BIM-based quantity take-off and realistic & desirable suggestion of BIM modeling way. As the result of this study, it is preferable to model various interior materials to use separate object for the purpose of correct BIM-based quantity take-off, but the realistic way of the BIM modeling using both separate object and composite object jointly was verified in order to judge BIM-based quantity take-off in terms of work productivity.

Propose to Modeling standard for automation quantity take-off of BIM-based (BIM 기반 물량산출 자동화를 위한 모델링의 기준제시)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.143-144
    • /
    • 2011
  • Recently the construction project is intricately linked to the between participants. it is because construction informations are not integrate. This study suggests 3D modeling standard for integrated construction information. These suggestions can be useful to automation quantity take-off.

  • PDF

The Extraction Method of Spacial Element Cost based on the Quantity Take-Off and Bill of Quantity (건설공사의 수량산출서 및 산출내역서 기반 공간별/부위별 공사비 추출방법에 관한 연구)

  • Nam, Dong-hee;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.232-233
    • /
    • 2021
  • As construction projects become larger and more complex in the construction environment, and as the Building Information Model(BIM) is technically introduced, the demand for construction costs in units of space is increasing. Cost estimating of spacial element can reduce the error in cost prediction method based on cost of work type and to utilize the construction cost data for each space in the design phase. The purpose of this study is to extract spatial statements by utilizing spacial information of quantitative statements based on items that are common elements of the Quantity Take-Off and Bill of Quantity.

  • PDF

A Comparison of Quantity Take-Offs of RC Structures based on BIM (BIM기반 철근콘크리트구조의 물량산출 비교)

  • Yoon, Jong Deok;Cho, Hyun Sik;Lee, Jae Hong;Shin, Jae Yong;Kim, Eun Suk
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.1
    • /
    • pp.35-44
    • /
    • 2020
  • In the construction industry, there is a growing demand for the accurate calculation of the quantity take-off and construction budget at the design stage, and it is likewise important to grasp changes in the construction budget and quantity take-off if design alterations are made. In addition, lawsuits related to the quantity take-off and cost of construction are frequent; therefore, the calculation of these factors using building information modeling (BIM) has emerged as an alternative. However, existing 2D-based methods are still used more frequently than BIM-based methods for quantity take-offs and construction budgets. This is because of the lack of BIM experience of estimation workers and the absence of a national standard. However, from a designer's point of view, it is necessary to understand the quantity take-off and construction cost based on BIM and accurately create the design according to the budget. In this study, the quantity take-offs of concrete, rebar, and reinforced concrete structures (apartments) in Seoul and Yeongjong were compared with the quantity take-offs based on 2D and BIM methods. From the viewpoint of the designer, we aim to increase the accuracy of BIM-based quantity take-offs.

The Development of BIM Library for Building Life Cycle CO2 Assessment (건축물 전과정 $CO_2$ 평가를 위한 BIM 라이브러리 개발)

  • Lee, Byeong-Ho;Hong, Soung-Wook;Shin, Sung-Woo
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.2
    • /
    • pp.67-76
    • /
    • 2012
  • BIM and its quantity take-off widely apply to the construction projects and LCCO2 Assessment using the BIM's quantity take-off function can be tried recently. Because BIM modeling programs such as Revit and ArchiCAD do not provide adequate library for LCCO2 Assessment, quantity take-off data should be conversed and applied to Carbon Emission Coefficient using Excel program or manual work. Therefore, the purpose of this research is 1) to propose the Unit Conversion Systems for Carbon Emission Coefficient, 2) to provide basic library sets for BIM based LCCO2 Assessment method, and 3) to apply 11 material library sets on a apartment unit plan modeling to pursue the CO2 emission evaluation of the material production in the process of LCCO2 Assessment. Research results showed CO2 emission amount of 458.64kgCO2/m2 from the apartment unit plan modeling.

Analysis for the Applicability of Automated Quantity Take-off Technique Using BIM Authoring Tools on Road Construction (BIM 저작도구를 활용한 도로공사 수량산출 자동화 활용성 분석)

  • Moon, Jin-Seok;Sun, Ji-Won;Choi, Won-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5184-5191
    • /
    • 2013
  • The automated quantity take off technique using BIM authoring tools has been recently issued, and the studies of this method for the accuracy, efficiency, and the unit computing for the simple volume, area and number have been developed. Meanwhile the main concerns such as the details for the level of modelling, and the costs and time for the calculating BOQ item are still required to study. In this paper, the earth works, drainage works, pavement works, and facility works using BIM authoring tools are designed in 3D, and the applicability of automated quantity take off technique using BIM authoring tools is discussed, respectively. As a result, automated quantity take off are limited in the earth works, drainage works, pavement works, and facility works. But Most items of BOQ can be supported in Re-bar model.

Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information (BIM정보를 활용한 강구조물의 공정 물량 통합관리)

  • Kim, Jin-Uk;Shin, Tae-Song
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF