1 |
J. C. Shin, J. W. Hwang, S. G. Lee, S. W. Lee, "BIM based Reliability Analysis and Automated Quantity Calculation", Korean Society of Hazard Mitigation, vol. 12, no.3, pp. 49-55, June, 2012. DOI: http://dx.doi.org/10.9798/KOSHAM.2012.12.3.049
DOI
ScienceOn
|
2 |
O. C. Kwon, C. W. Jo, J. W. Cho, "Introduction of BIM Quality Standard for Quantity Take-off", Journal of the Kore Institute of Building Construction, vol. 11, no.2, pp. 171-180, April, 2011. DOI: http://dx.doi.org/10.5345/JKIC.2011.04.2.171
과학기술학회마을
DOI
ScienceOn
|
3 |
S. A. Kim, S. W. Yoon, S. Y. Chin, T. Y. Kim, "A Development of Autoㅈmated Modeling System for Apartment Interior to Improve Productivity of BIM-based Quantity Take-Off", Architectural Institute of Korea, vol.25, no.9, pp. 133-143, September, 2009.
|
4 |
C. H. Lee, S. A. Kim, S. Y. Chin, "An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off", Korea Institute of Construction Engineering & Management, vol. 12, no.6, pp. 79-92, December, 2011. DOI: http://dx.doi.org/10.6106/KJCEM.2011.12.6.79
DOI
ScienceOn
|
5 |
J. K. Jun, S. H. Yun, "The Case study of BIM-based quantity take-off for concrete and framework", Korean Institute of BIM, vol. 1, no.1, pp. 13-17, 2011.
|
6 |
Zigang Shen and Raja R.A. Issa, "Quantitative Evaluation of the BIM-assisted construction detailed cost estimate", Journal od information technology in construction", Vol.15, pp.234-257. 2010
|
7 |
Sarah Berwald, "From CAD to BIM : The Experience of architectural education with building information modeling" AEI 2008: Building Integration solution pp. 1-5 DOI: http://dx.doi.org/10.1061/41002(328)8
DOI
|