Browse > Article
http://dx.doi.org/10.5762/KAIS.2013.14.10.5184

Analysis for the Applicability of Automated Quantity Take-off Technique Using BIM Authoring Tools on Road Construction  

Moon, Jin-Seok (ICT Convergence and Integration Research Division, Korea Institute of Construction Technology)
Sun, Ji-Won (ICT Convergence and Integration Research Division, Korea Institute of Construction Technology)
Choi, Won-Sik (ICT Convergence and Integration Research Division, Korea Institute of Construction Technology)
Publication Information
Journal of the Korea Academia-Industrial cooperation Society / v.14, no.10, 2013 , pp. 5184-5191 More about this Journal
Abstract
The automated quantity take off technique using BIM authoring tools has been recently issued, and the studies of this method for the accuracy, efficiency, and the unit computing for the simple volume, area and number have been developed. Meanwhile the main concerns such as the details for the level of modelling, and the costs and time for the calculating BOQ item are still required to study. In this paper, the earth works, drainage works, pavement works, and facility works using BIM authoring tools are designed in 3D, and the applicability of automated quantity take off technique using BIM authoring tools is discussed, respectively. As a result, automated quantity take off are limited in the earth works, drainage works, pavement works, and facility works. But Most items of BOQ can be supported in Re-bar model.
Keywords
Automated quantity take off; BIM; BIM authoring tools;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 J. C. Shin, J. W. Hwang, S. G. Lee, S. W. Lee, "BIM based Reliability Analysis and Automated Quantity Calculation", Korean Society of Hazard Mitigation, vol. 12, no.3, pp. 49-55, June, 2012. DOI: http://dx.doi.org/10.9798/KOSHAM.2012.12.3.049   DOI   ScienceOn
2 O. C. Kwon, C. W. Jo, J. W. Cho, "Introduction of BIM Quality Standard for Quantity Take-off", Journal of the Kore Institute of Building Construction, vol. 11, no.2, pp. 171-180, April, 2011. DOI: http://dx.doi.org/10.5345/JKIC.2011.04.2.171   과학기술학회마을   DOI   ScienceOn
3 S. A. Kim, S. W. Yoon, S. Y. Chin, T. Y. Kim, "A Development of Autoㅈmated Modeling System for Apartment Interior to Improve Productivity of BIM-based Quantity Take-Off", Architectural Institute of Korea, vol.25, no.9, pp. 133-143, September, 2009.
4 C. H. Lee, S. A. Kim, S. Y. Chin, "An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off", Korea Institute of Construction Engineering & Management, vol. 12, no.6, pp. 79-92, December, 2011. DOI: http://dx.doi.org/10.6106/KJCEM.2011.12.6.79   DOI   ScienceOn
5 J. K. Jun, S. H. Yun, "The Case study of BIM-based quantity take-off for concrete and framework", Korean Institute of BIM, vol. 1, no.1, pp. 13-17, 2011.
6 Zigang Shen and Raja R.A. Issa, "Quantitative Evaluation of the BIM-assisted construction detailed cost estimate", Journal od information technology in construction", Vol.15, pp.234-257. 2010
7 Sarah Berwald, "From CAD to BIM : The Experience of architectural education with building information modeling" AEI 2008: Building Integration solution pp. 1-5 DOI: http://dx.doi.org/10.1061/41002(328)8   DOI