A Comparison of Quantity Take-Offs of RC Structures based on BIM |
Yoon, Jong Deok
(Division of Research, Tomoon Architects)
Cho, Hyun Sik (Division of Research, Tomoon Architects) Lee, Jae Hong (Division of BIM Business, Glotech.) Shin, Jae Yong (Division of BIM Business, Linetech.) Kim, Eun Suk (Division of Technical Business, Changsoft.) |
1 | An, J.W., Yun, S.H. (2017) Improvement of BoQ Documents for the BIM based Quantity Takeoff, J. KIBIM, 7(2), pp.16-24. DOI |
2 | Choi, H.C. Lee, Y.J., Lee, S.E., Kim, C.K. (2014) Development of 3-Dimensional Rebar Detail Design and Placing Drawing System, J. Comput. Struct. Eng, Inst, Korea, 27(4), pp.289-296. DOI |
3 | Chung, S.W., Kwon, S.W. (2014) Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project, J. Constr. Eng. & Manag., 15(2), pp.53-61. |
4 | Joo, S.U., Kim, C.K. Kim, S.U., Noh, J.O. (2017) BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Rainforced Concrete Structures, J. Comut. Struct. Eng, Inst, Korea, 30(6), pp.567-576. DOI |
5 | Jun, K.H., Yun, S.H. (2011) The Case Study of BIM-based Quantity Take-off for Concrete and Formwork, J. KIBIM, 1(1), pp.13-17. DOI |
6 | Kim, J.H., Yoon, S.W. (2013) A Verification of the Accuracy in BIM-based Quantity Taking-Off Focusing on Finishing Work, J. KIBIM, 3(2), pp.1-9. DOI |
7 | Kim, T.H., Hong, C.G., Kim, S.K. (2003) Algorithm for the Reinforced Concrete Framework Materials Take-off, J. Constr. Eng. & Proj. Manag., 4(1), pp.114-121. |
8 | Kim, Y.J., Kim, S.A., Chin, S.Y. (2012) A Study of BIM based Estimation Modeling Data Reliability Improvement, J. Constr. Eng. & Manag., 3(3), pp.43-55. |
9 | Kwon, O.C., Jo, C.W., Cho, J.W. (2011) Introduction of BIM Quality Standard for Quantity Take-off, J. Korea Inst. Build. Constr., 11(2), pp.171-180. DOI |
10 | Min, K.H., Kim, S.J. (2016) Comparison Analysis of Concrete Material Take-off of Structural Frame Work Based on BIM, J. Constr. Eng. & Manag., 2016-11, pp.112-115. |
11 | Park, Y.J., Won, S.K., Han, C.H., Lee, J.B. (2011) A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects, J. Archi. Inst. Korea, 27(6), pp.123-130. |
12 | Shin, J.C., Ahn, S.R. (2013) Analysis of Errors and Reliability in Earth-Volume and Retaining wall Quantity Estimations with 3D-BIM Compared with Routine Method Based 2D, J. KIBIM, 3(1), pp.25-26. |
13 | Song, C.H., Kim, C.K., Lee, S.E., Choi, H.C. (2016) Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase, J. Comput. Struct. Eng, Inst, Korea, 29(5), pp.447-454. DOI |
14 | Yoo, J.E., Lee, C.S. (2015) Comparison of Quantity Take-off based on BIM and 2D, J. Constr. Eng. & Manag., 2015-11, pp.127-130. |
15 | Yoon, M.C. (2013) A BIM-Based Architectural Model Takes Advantage of the Estimate Model Process, J. Archi. Inst. Korea, 29(9), pp.95-102. |