• 제목/요약/키워드: Pull up

검색결과 258건 처리시간 0.032초

Design of 1-Kb eFuse OTP Memory IP with Reliability Considered

  • Kim, Jeong-Ho;Kim, Du-Hwi;Jin, Liyan;Ha, Pan-Bong;Kim, Young-Hee
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • 제11권2호
    • /
    • pp.88-94
    • /
    • 2011
  • In this paper, we design a 1-kb OTP (Onetime programmable) memory IP in consideration of BCD process based EM (Electro-migration) and resistance variations of eFuse. We propose a method of precharging BL to VSS before activation of RWL (Read word-line) and an optimized design of read NMOS transistor to reduce read current through a non-programmed cell. Also, we propose a sensing margin test circuit with a variable pull-up load out of consideration for resistance variations of programmed eFuse. Peak current through the non-programmed eFuse is reduced from 728 ${\mu}A$ to 61 ${\mu}A$ when a simulation is done in the read mode. Furthermore, BL (Bit-line) sensing is possible even if sensed resistance of eFuse has fallen by about 9 $k{\Omega}$ in a wafer read test through a variable pull-up load resistance of BL S/A (Sense amplifier).

FRP 복합체의 콘크리트에 대한 접착강도 시험방법 변수 연구 (Parametric Study on Test Method for Pull-off Strength of FRP Composite Material used in Strengthening RC Members)

  • 최기선;유영찬;이한승;김긍환
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계학술발표회 논문집(I)
    • /
    • pp.222-225
    • /
    • 2006
  • Pull-off test is widely used to evaluate bond performance between concrete and FRP composite. However, reliability of experiment result declines due to many difference between test methods of each national standards. This study analyzed problems of various existing test methods for pull-off test and suggested standardized test method. In addition, since tensile strength of concrete is smaller than bond strength of epoxy resin, maximum bond strength of epoxy resin shall be limited within tensile strength of concrete. Alternative testing method, therefore, which decrease FRP adhesion areas than concrete adhesion areas is suggested to widen test range of bond strength in pull-off test. In the experimental results, bond performance can be estimated up to two times of tensile strength of concrete by reducing FRP adhesion areas by 1/3.

  • PDF

푸쉬 풀 포워드 컨버터의 효율 특성 고찰 (Considerations of Single Magnetic Integrated built-in Filter Push-Pull Forward Converter characteristics)

  • 전준석;김창선;김태식;임범선;우승훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 B
    • /
    • pp.1232-1234
    • /
    • 2003
  • The push pull forward converter is a very suitable circuit for low output voltage, high output current applications with a wide input voltage range. This converter can be miniaturized by integrate magnetic components such as the output inductor, the transformer and the input inductor. We considered of the efficiency for the push pull forward converter. Developed the push pull forward converter rating are of $36{\sim}72V$ input and 3.3V/30A output. In this converter. the efficiency was measured by 76.4% at full load and 82.95% at half load. The maximum efficiency is up to 83.% at 200kHz, 11A output.

  • PDF

히르슈슈프룽병의 일차성 복강경 보조 Endorectal Pull-Through 술식의 임상적 고찰 (Primary Laparoscopic-Assisted Endorectal Pull-Through for Hirschsprung's Disease)

  • 박병순;설지영
    • Advances in pediatric surgery
    • /
    • 제19권2호
    • /
    • pp.130-139
    • /
    • 2013
  • The application of laparoscopic techniques for the surgical management of Hirschsprung's disease is the recent trend. We described the surgical technique and postoperative long-term outcomes of the one-stage, laparoscopic-assiseted endorectal pull-through operation for Hirschsprung's disease. The technique uses three to four small abdominal ports. Laparoscopic mobilization of the sigmoid colon and rectum is performed and marginal artery-preserving colon pedicle is prepared. The rectal mobilization is performed using a transanal endorectal sleeve technique. The anastomosis is performed 0.5~1 cm above the dentate line. The age at surgery ranged from 6 days to 4 years. The average operative time was 144 minutes. Almost all of the patients passed stool and flatus within 36 hours of surgery. The average hospital stay after surgery was 6.5 days. Among 42 patients, 32 patients older than 3 years old were evaluated for function on defecation. All 32 patients have been continent, of those who needed laxatives were 11 (34.3%) due to constipation and overflow incontinence. Four children (12.5%) have remained dependent on laxatives. Laparoscopic-assisted endorectal pull-through operation for Hirschsprung's disease appears to be safe, provides the less pain, shorter time to full feeding, shorter hospital stay, and excellent cosmetic outcomes. Helping patients and parents ensure the quality of life, they should be provided with counseling, education, and longer-term follow-up care.

Studies on the Pull-up MEMS Switch for the Lower Actuation Voltage and High Speed using Double Electrode

  • Lee, Seong-Dae;Jun, Byoung-Chol;Baek, Tae-Jong;Kim, Soom-Koo;Kim, Sam-Dong;Rhee, Jin-Koo
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2005년도 추계종합학술대회
    • /
    • pp.929-932
    • /
    • 2005
  • We report a pull-up type RF MEMS switch using double electrode without elastic deformation of the cantilever involved in the actuation. At a voltage of 4.5 V, reliable actuations are achieved such that the movable lower contact pad is pulled up by the electrostatic force to make contact with the upper pad. At a frequency of 50 GHz, an insertion loss of 0.7 dB and an isolation of 50.7 dB are obtained from the switch. The measured transient times for switch-on and switch-off are 120 and 80 us, respectively.

  • PDF

디스플레이 구동을 위한 고속 레벨-쉬프터 회로 (A High-speed Level-shifter Circuit for Display Panel driver)

  • 박원기;차철웅;이성철
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2006년도 하계종합학술대회
    • /
    • pp.657-658
    • /
    • 2006
  • A Novel level-shifter circuit for Display Panel Driver is presented. A Proposed level-shifter is for the high speed and high-voltage driving capability. In order to achieve this purpose, the proposed level-shifter restricts and separates the Vgs of the output driver's pull-up PMOS and pull-down NMOS with Zener diode. And a speed-up PMOS transistor is introduced to reduce delay. The control signal of speed-up PMOS was designed by bootstrapping method to minimize the gate to source (Vgs) voltage to avoid Vgs breakdown.

  • PDF

A High-Efficiency High-Power Step-Up Converter with Low Ripple Content

  • Kang Jeong-il;Roh Chung-Wook;Moon Gun-Woo;Youn Myung-Joong
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2001년도 Proceedings ICPE 01 2001 International Conference on Power Electronics
    • /
    • pp.708-712
    • /
    • 2001
  • A new phase-shifted parallel-input/series-output (PI SO) dual inductor-fed push-pull converter for high-power step­up applications is proposed. This converter is operated at a constant duty cycle and employs an auxiliary circuit to control the output voltage with a phase-shift between the two modules. It features a voltage conversion characteristic which is linear to changes in the control input, and high step-up ratio with a greatly reduced switch turn-off stress resulting in a significant increase in the converter efficiency. It also shows a low ripple content and low root-mean-square (RMS) current in the output capacitor. The operational principle is analyzed and a comparative analysis with the conventional pulse-width-modulated (PWM) PISO dual inductor-fed push-pull converter is presented. A 50kHz, 800W, 350Vdc prototype with an input of 20-32Vdc has also been constructed to validate the proposed converter. The proposed converter compares favorably with the conventional counterpart and is considered well suited to high-power step-up applications.

  • PDF

작업형태 및 최대 수의적 수축에 따른 등척성 근지구력에 관한 연구 (The Study of Isometric Endurance Time by Task Type and Maximum Voluntary Contraction)

  • 심정훈;이상도
    • 대한인간공학회지
    • /
    • 제22권2호
    • /
    • pp.57-69
    • /
    • 2003
  • This study was performed to investigate the isometric endurance time as percentages of maximum voluntary contraction. Electromyogram(EMG) and Borg's CR-I0 value were measured by push-pull-up-down tasks for 10 healthy males. The normalized EMG value and the MPF(mean power frequency) were used to estimate the muscle recruitment pattern and the development of muscle fatigue. The subjects exerted and maintained 5 levels of %MVC(maximum voluntary contraction) in $90^{\circ}$ shoulder flexion/ 180oelbow extension at sitting posture. The up-task showed the lower endurance time and higher Borg's CR-I0 value than the other task types. Comparing Rohmert's curve with the endurance time of task types. Rohmert's curve overestimated the endurance time of up-task and underestimated the endurance time of push-pull-down tasks. The normalized EMG value showed that muscles recruitment patterns were different from task types. The 4 muscles(biceps brachii muscle, tricep brachii muscle. middle deltoid muscle. trapezius muscle) recruitment patterns of up-task were higher than those of other tasks. The MPF value decreased with the endurance time, and the shift of MPF at up-task was larger than that of the other task types.

Esophageal Reconstruction with Gastric Pull-up in a Premature Infant with Type B Esophageal Atresia

  • Han, Young Mi;Lee, Narae;Byun, Shin Yun;Kim, Soo-Hong;Cho, Yong-Hoon;Kim, Hae-Young
    • Neonatal Medicine
    • /
    • 제25권4호
    • /
    • pp.186-190
    • /
    • 2018
  • Esophageal atresia (EA) with proximal tracheoesophageal fistula (TEF; gross type B) is a rare defect. Although most patients have long-gap EA, there are still no established surgical guidelines. A premature male infant with symmetric intrauterine growth retardation (birth weight, 1,616 g) was born at 35 weeks and 5 days of gestation. The initial diagnosis was pure EA (gross type A) based on failure to pass an orogastric tube and the absence of stomach gas. A "feed and grow" approach was implemented, with gastrostomy performed on postnatal day 2. A fistula was detected during bronchoscopy for recurrent pneumonia; thus, we confirmed type B EA and performed TEF excision and cervical end esophagostomy. As the infant's stomach volume was insufficient for bolus feeding after reaching a body weight of 2.5 kg, continuous tube feeding was provided through a gastrojejunal tube. On the basis of these findings, esophageal reconstruction with gastric pull-up was performed on postnatal day 141 (infant weight, 4.7 kg), and he was discharged 21 days postoperatively. At 12 months after birth, there was no catch-up growth; however, he is currently receiving a baby food diet without any complications. In patients with EA, bronchoscopy is useful for confirming TEF, whereas for those with long-gap EA with a small stomach volume, esophageal reconstruction with gastric pull-up after continuous feeding through a gastrojejunal tube is worth considering.

푸시 풀 포워드 컨버터의 주파수 변화, 변압기의 권선비와 1차측 권선 변화에 대한 효율 특성 (Push Pull Forward Converter Efficiency Quility)

  • 전준석;김창선;김태식;임범선;우승훈
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2003년도 춘계전력전자학술대회 논문집(1)
    • /
    • pp.36-39
    • /
    • 2003
  • The push pull forward converter is a very suitable circuit for low output voltage, high output current applications with a wide input voltage range. All the magnetic components (output inductor, transformer, input filter) can be integrated into a single core. The integrated magnetics can reduce the number of the magnetic components. Developed the push pull forward converter rating are of 36 $\~$72V input and 3.3V/30A output. In this converter, the efficiency was measured by $76.4\%$ at full load and 82.95$\%$ at full load. The maximum efficiency is up to 83.$\%$ at 200kHz switching frequency, l1A output.

  • PDF