• Title/Summary/Keyword: Public ordering service

Search Result 17, Processing Time 0.024 seconds

A Research on the Development of Management Process System of Public Ordering Service Results and Estimation (건설기술용역 실적 관리 프로세스 시스템 개발에 대한 연구)

  • Lee, Kyu-Sung;Lee, Han-kyu;Kim, Nam-Gon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.168-169
    • /
    • 2014
  • Construction Technology Service is currently hardly managed due to failure to offer standard management system of service performance, company performance, and business evaluation in every Ordering Agencies. After Construction Technology Promotion Act is enforced in May 2014, Ordering Agency obligates them to report to Minister of Land and Transportation within 10 days upon contract/ amendment/ completion. In 2013, in advance to enforcement of this law, performance management system for construction technology service was developed for a test run. However this system only applies to main contractors while management and operation of subcontractors are unavailable that causes problems on connection and integration with Experience Management Trustee. Therefore, this research will establish systematic foundation that enables real-time information of service performance and evaluation of subcontractors to result standardization of performance and evaluation for public ordered services.

  • PDF

A Research on Improvement Scheme for Management Technique of Public Ordering Service Results and Estimation (공공발주용역 실적 및 평가 관리 프로세스 개선에 대한 연구)

  • Lee, Kyu-Sung;Lee, Han-kyu;Kim, Nam-Gon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.238-239
    • /
    • 2013
  • A system to efficiently utilize construction information has been in demand as a result of the changing society where information and knowledge leads to added value. Consequently, the government established a comprehensive information network system for construction industries to manage and utilize construction information which is the currently in use. However, this system is oriented toward management and business performance estimation for engineering and does not integrate a management system for design, construction technology, and construction engineering services. Therefore, this study proposes to develop object technology and management system of construction services and its evaluation to provide such information in real time.

  • PDF

Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector (공공부문 시공책임형 CM 사업의 시공이전단계 성과분석)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.97-105
    • /
    • 2021
  • The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.

Proposal for Improvement on the Task of Construction Project Management Service(CM) for the Customized Service Project of the Public Procurement Service (조달청 맞춤형서비스 사업에 대한 '감독 권한대행 등 건설사업관리용역(CM)' 과업내용 개선방향)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.3-11
    • /
    • 2021
  • The construction project manager must clearly carry out the activities of each construction stage specified in the 'Task Description'. In this study, 'design change' and 'completion process' were classified as core tasks in consideration of the frequency and importance of tasks. And, by analyzing the actual construction project, the task contents for the core work were standardized. This laid the foundation for the ordering office, construction project management technicians, and builders to clearly understand the business areas of construction project management and fulfill their responsibilities for their respective tasks.

Analysis of the ordering factors influencing the awarding price ratio of service contract in KONEPS

  • Jung-Sung Ha;Tae-Hong Choi;Wan-Sup Cho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.12
    • /
    • pp.239-248
    • /
    • 2023
  • The purpose of this study is to analyze the factors for service contracts that affect the successful bid price rate, focusing on the case of the country market. In the study, ordering organizations and bidders differentiated themselves from existing studies by analyzing service contracts that affect the successful bid price rate in a wide range of country markets. Comparative analysis of the awarding price ratio for services, this work provides a comparable result to the existing results in the previous literature. The analytical model used five independent variables such as budget, contract method, the days of the public notice, the awarding method, and the lowest awarding ratio. In the survey and analysis, big data was collected using text mining for service bids for Nara Market over the past 18 years and data was analyzed in a multi-dimensional way. The results of the analysis are as follows, (1) if budget does not determine the awarding price ratio. This is not the case in small amounts. (2) The contract method affects the awarding price ratio. (3) The days of the public notice increase, the awarding price ratio decrease. (4) the awarding method affects the awarding price ratio. (5) The lowest awarding ratio determines the awarding price ratio. Based on the results of empirical analysis, policy implications were sought.

An Effect on the Project and Organization Performance by PMO Service (PMO 서비스가 프로젝트 및 조직 성과에 미치는 영향 연구)

  • Lee, Seong-Mong;Kim, Hyunsoo;Kim, Eun-Hong
    • Journal of Service Research and Studies
    • /
    • v.2 no.2
    • /
    • pp.53-79
    • /
    • 2012
  • According to Electronic Times(2012. 1. 3), "PMO was introduced from 1950s in the USA and as of 2010, PMO participated in 84% of project ordered by public and private sector." And Ministry of public administration and security announced that the Ministry will organize Task Force for arranging "standard for introduction and operation of PMO" for support of project implementation and strengthening specialty of ordering organization, and then, actively launch the Task Force from February, 2012. Thus, necessity of PMO is regarded as natural in some aspect but thesis for doctoral degree written by Kim Gi-yeong(2007) suggested, "performance of several projects begun at the same time cannot be interpreted as high according to whether PMO team exists or not." Martin et al.(2005) asserted, "according to whether PMO team exists or not, but there is no significant difference in other factor." In the contradictory situation, it is necessary to perform more various approaches for performance and necessity of PMO in the academic aspect.

  • PDF

A Study on the Suitability of Unified Project Management Framework Applying for IT Services in Public Organizations (공공기관 IT 서비스 종합관리 프레임워크 도입의 적정성 연구)

  • Park, Min-Kuk;Park, Dae-Ha
    • Journal of Service Research and Studies
    • /
    • v.7 no.3
    • /
    • pp.21-36
    • /
    • 2017
  • Recently in information business, managing and auditing are getting more difficult because of enlargement, intellectualization and convergence. In addition, ordering organizations have been having a difficult time choosing a service because not only there is a huge overlap between information audit system and PMO but also the work boundaries of those two are not clear enough. As the demand that a business managing and auditing frame work need to be more developed in terms of independence, quality, economic feasibility and responsibility has been increased, the Korea Association Of Information Systems Audit has been attempting to improve business management and audit system by proposing Unified Project Management Framework whose process is approximately constructed. This study introduces Unified Project Management Framework which is all-encompassing from the ordering at the very beginning of business to the operating in the post-processing step and then verifies its work scope through a comparative analysis with existing management systems. Also, this thesis examines the necessity of unification of audit system and PMO by analysing existing similar systems. At the end, this study, analyses the suitability of Unified Project Management Framework by evaluating it with IT goal frame of COBIT5 which is constructed based on BSC performance management index. The result of the analysis is expected to help people in charge understanding the features of Unified Project Management Framework before they apply it to practical business.

A Study on the Analysis of Industrial Accident Deaths in Public Institutions and the Awareness Survey of Safety Enhancement Measures for Public Institutions (공공기관 산재 사고사망 분석 및 공공기관 작업장 안전강화 대책의 인식도 조사에 관한 연구)

  • Kim, Sang Hyun;Hwang, In Sung;Kang, Chan Kyu
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.64-71
    • /
    • 2020
  • Safety is not a service provided selectively by the country, and it is a basic right that human beings should enjoy. However, as the recent expansion of outsourcing due to the efficient corporate management, fatal accidents such as the Taean Power Plant where subcontractors are pinched on conveyors continued to occur. In addition, public safety concerns have been widespread as there are constant safety-related accidents in public institutions such as KTX trains derailing. As public institutions require safety as a top priority for management rather than profit, the government needs a leading role to enhance the level of private safety activities. The government announced the "Measures to strengthen the workplace safety of public institutions" and is promoting measures to protect the lives and safety of the people. The purpose of this study was to in-depth analysis of the accident and death situation in public institutions in the last 5 years from 2014 to 2018. A recognition survey was also conducted and the results were analyzed. As a result of the analysis of industrial accident death, it showed that the number of industrial accident deaths in public institutions was about 50 people per year, and it occupied about 6.1% of all industrial accidents. Following the government's public policy measures, positive changes as a result of the survey on awareness were detected in the order of rising safety awareness and participation of management (56.9%), safety and health organization and personnel composition (37.9%), and increasing safety awareness and participation of members (18.9%). However, the obstacles to the implementation of government measures were followings; 1) consciousness and lack of participation (42.1%), 2) indifference from other departments (35.1%), 3) absence, or lack of competency of safety manager (33.3%). In addition, safety investments and safety management of contractors and ordering works were analyzed to have remained largely unchanged even after the implementation of safety measures. Through this study, it is intended to provide basic data for strengthening the level and activities of safety in public institutions.

Medical CRM Frame Design for Medical Institution (의료기관 전문 의료용 CRM 프레임 설계)

  • Kim, Gui-Jung
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.12
    • /
    • pp.20-27
    • /
    • 2008
  • Hospitals today use independent systems for each department and job such as Hospital Information Sytem(HIS), Picture Archiving Communications System(PACS), Ordering Communication System(OCS), Electronic Medical Record(EMR), Enterprise Resource Planning(ERP), etc and each system employs its own DB. So, it is impossible to integrate information within the institution and difficult to keep transparency and consistency of data. I in this study offered a data integration environment through flexible management linked with other systems, and by doing that, designed a medical CRM frame which offers the optimum service the customer wants at the optimum time. I designed 4 of medical CRM frame: customer relationship management, public relations/marketing, service management, and statistics/analysis by the customer relationship management process standardization and aimed to offer tailored mobile contents according to customer's characters and health situation on the basis of customer's data by securing mobile medical contents for personalized medical information service.