• Title/Summary/Keyword: Public Project

Search Result 2,122, Processing Time 0.031 seconds

A Study on establishment of urban regeneration project models and evaluation indexes - Focused on Public project - (도시재생 평가지표와 재생모델 설정에 관한 연구 - 공공부문 시행을 중심으로 -)

  • Choi, Jung-Min;Choi, Chan-Hwan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.13 no.3
    • /
    • pp.53-60
    • /
    • 2011
  • The purpose of this study was to propose the urban regeneration project model that reinforce public functions and contribute effectively to urban development. The results of this study were as follows. First, this study developed objective 22 different types of evaluation indexes. The indexes allows to figure out the necessities, business value and conditions of certain urban regeneration project. Second, the urban is divided to 6 types by characteristics of functionality and location. So, each regeneration project model can be applied to meet the condition of the urban.. Third, this study proposed 5 types of urban regeneration project model to fulfil roles of public and encourage the urban development. The urban regeneration project model is supposed to perform the evaluation of urban condition using the index, typological analysis under the law and scheme and analysis of function and urban location.

Economic Analysis on the Small & Medium Business Public e-Procurement Information System Project (중소기업 공공구매 판로지원 종합정보시스템 구축사업의 경제성 분석)

  • Jeong, Hoon;Ahn, Jaekyoung
    • Journal of Information Technology Services
    • /
    • v.17 no.2
    • /
    • pp.69-81
    • /
    • 2018
  • This study performed an economic analysis and tested the viability of a public computerization project to create a comprehensive information system for public e-procurement for small and medium-sized businesses (SMBs). The study found that the estimated costs of the project included 4.3 billion won to build the system and 710 million won per year to maintain the system once it is built. The project's estimated total benefits amounted to 6.66 billion won per year, including 5.871 billion won per year in increased convenience for SMBs that use the system, 406 million won per year in benefits for public institutions, and 383 million won per year in benefits for the institution "A" to adopt the system. We used the contingent valuation method (CVM) to estimate the benefits to SMBs, which would be the main participants of the project. The survey found that the SMBs were willing to pay an average fee of 170,136 won. we conducted an economic analysis by applying a 5.5% social discount rate over an analysis period of 10 years and found a benefit-cost ratio of 5.02 and a net present value of 40.201 billion won, which indicated a very high economic viability of the project. The results of this study can be an important reference when deciding whether to pursue computerization projects in the public sector.

A Study on the Analysis of Project Implementations at Public Design - Improving Project for Public Design in Daegu, Dongseong Street - (공공디자인 개선사업의 추진실태 분석에 관한 연구 - 대구시 동성로 공공디자인 개선사업을 중심으로 -)

  • Lee, Jong-Kuk
    • Journal of the Korean housing association
    • /
    • v.25 no.6
    • /
    • pp.67-74
    • /
    • 2014
  • Dongseong-ro public design was reformed for a short time to be short of connection and riffle effect of another project and to have limitation on long term and integrated development, so that systematic plan from beginning of the project was needed to produce synergy effects. The purpose of the study was to investigate reformation of Dongseong-ro public design and to check on existing development project again and to take actions against future projects in advance and to reexamine and make long term plan from point of view of development of downtown. This study investigated reformation of Dongseong-ro public design of Junggucheong office of Daegu that was done from May 2007 to December 2010. The study consisted of purpose of the project, scope, time, the committee of promotion, questionnaire survey, residents' participation and follow up to suggest reformation based on questionnaire survey. This study had limitation of investigation into internal materials of 'Dongseong-ro public design reformation's master planning service' of Junggucheong office of Daegu. Further studies were needed to investigate empirically.

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

Examination of Public Art Project from Viewpoint of Place Marketing -Focused on Cases of Busan Public Art Project- (장소마케팅 관점에서 공공미술 프로젝트에 대한 고찰 -부산 공공미술 프로젝트 사례를 중심으로-)

  • Kim, Hyun-Jeong
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.2
    • /
    • pp.276-286
    • /
    • 2011
  • Recently, many regional governments and national organizations have propelled public art projects as a part of city regeneration project for improvement of living environment and cultural welfare of neglected regions. It is necessary to think of meaning of the public art project in a context of city regeneration, not only in public art discourse. This paper starts from the question if recent public art projects performed in city of Busan during last 5 year was successful in terms of place marketing. This paper tried to revoke to consider public art project in terms of place marketing because it should be utilized ultimately to activate regional economy for the habitants. First, we reviewed theoretical background regarding definition of public art and place marketing, intended effects of public art project, and place marketing strategy. we elicited an analytical framework and analyzed representative 6 cases of recent public art projects performed in city of Busan in terms of requirements of public art project and viability of place marketing. Discussion of the analysis result suggested implications for the future public art project to direct.

Application of BIM in Public Construction Project : Focused on Delivery System (공공 건설프로젝트 BIM 적용 효율적인 발주방안에 관한 연구)

  • Cho, Sung;Cho, Yong;Lee, Kyung-Ha;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.203-207
    • /
    • 2009
  • These days Construction Industry is one of the major industry in public project and it has many problems. And Construction Industry highly respond to a chage of IT, politics, economy, domestic and international situation. And it causes an uncertainty in Korea economy. The goal of this paper is showing the efficiency application of BIM in Public Project. And this paper follow three steps. First, these day's trend of BIM and delivery method are researched. Second, major factors are thrived to appreciating BIM Third, delivery method based on BIM is proposed. Major factors of delivery method are researched to make guide line of delivery method in public project in the future.

  • PDF

A Descriptive Analysis of Project Participants' Perception about Complaint in Public Construction Projects

  • Lee, Changjun;Lee, Ju-Hui;Yun, Sungmin;Han, Seung Heon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.111-118
    • /
    • 2022
  • Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.

  • PDF

Delay Factor Analysis of Public Project Based on System Dynamics (SD를 이용한 공공 프로젝트의 지체요인 분석)

  • 이만형;이정민
    • Korean System Dynamics Review
    • /
    • v.4 no.2
    • /
    • pp.95-130
    • /
    • 2003
  • The purpose of this study is to find what causes make public projects hold off, going beyond the planned deadline and budget. Using System Dynamics(SD) and their derivative Urban Dynamics(UD) models, it intends to analyze major feedback loops based on VENSIM and to simulate them with STELLA software, all of which are interrelated with various causes of project delay. To prevent or ameliorate project delay, first of all it advises to focus on endogenous delaying factors not exogenous ones. These factors either reinforce or balance certain loops in complex causal structure, In the case example on the Cremation Building Project in Cheongju, Residents’ participation demand make negotiation put off and delayed negotiation reinforces administrative-expediency planning in order to observe a time limit, on the other hand, once building consensus, it increase both the level of planning performance and public trust. In the meantime, the real planning process used to neglect residents opinions and manage public grievance only through compensation, he a result of simulation, visible fruit of negotiation in the initial phase seems to be not satisfactory owing to funds and time consumed, but after reaching an mutual agreement among stakeholders, planning performance is effective and strategic than administrative-expediency planning viewed in both financial and time angle. It proposes to devise specific tools schematizing project implementation. In order to upgrade the quality of project management, it recommends for planners to adopt key concepts based on SD/UD diagrams and causal loops, which would contribute to enriching Planning abbots.

  • PDF

The Improvement Plan of Project Delivery Systems in the Public Construction Projects (공공건설사업의 발주방식 개선방안)

  • Choi, Eun-A;Kim, Hyun;Park, Sung-Yong;Cho, Hyeong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.509-512
    • /
    • 2008
  • Clients demands have been changed by construction circumstances such as high-technology, mega-projects, and the complexity of construction. Advanced foreign countries have already introduced and applied new project delivery systems(i.e, CM, DB, etc.) to deal with the change of such that. Recently, Korea also launched two new project delivery systems, "Best Value Contracts to which the State is a Party" to provoke the project delivery system, which helps a public owner select a project delivery system appropriate to the project characteristics. Even though government has made his efforts as stated above, some clients have still used those to public construction projects uniformly. That is because there are not a selection criteria of project delivery system for clients. Therefore, this paper proposes the selection criteria of project delivery system based on project types in the public large construction projects.

  • PDF

Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System- (공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로-)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.12-21
    • /
    • 2013
  • Total Project Cost Management System(TPCMS) was introduced with the purpose of increasing the efficiency of cost control for public construction project in 1994. In this paper, general perception of participants of the public construction project on the TPCMS was examined, and the problems in implementing the TPCMS was figured out through expert interviews and survey. Then better ways to implement the system were drawn based on the problems. To effectively manage the cost of public construction project, basically project cost should be estimated accurately in planning stage and managed based on it to have a project complete within the budget. In addition, the cost need to be managed in more systematic ways in terms of data collection and analysis, and the autonomy in managing the project cost given to the project owner needs to be expanded. Most of all, proper budget should be provided to prevent a project from delay through setting the priority of projects and proper budget allocation based on the priority.