Improvement of Selection System of Waterproofing Methods for Concrete Structure (지하 콘크리트 구조물의 적정 방수공법 선정을 위한 평가시스템 제안에 관한 연구)

  • Oh, Sang-Keun;Kwak, Kyu-Sung;Choi, Sung-Min;Kwon, Shi-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.1 s.23
    • /
    • pp.99-106
    • /
    • 2007
  • Water leakage could be caused deterioration of environmental conditions, user condition, reduction of life span and long term safety in underground concrete structure. Many materials and construction method to repair on these problems have been developed, however, it is not proper to successful repair or raise problem of increasing repair cost However, there are many limitations as practical appraisal methods due to different view of reliability for test methods. Because, it was not enough that the technical objectivity could be lack and also application of environmental condition is inadequate. In this paper, we suggest varied test methods divided to appraisal for property of matter, construction, manufacturing, specification and maintenance, friendly environmental condition. It could be more practical as a objective standard considering various angles. In summery, it should be subdivided and differentiated to accomplish proper application and to select proper materials and construction method for repair even if the synthetical condition is very complicated.

A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing (LCC 평가를 통한 지붕방수공법선정에 관한 연구)

  • Choi, Oh-Young;Kim, Tae-Hui;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.127-134
    • /
    • 2008
  • The purpose of this study is to propose the decision making technique in roof waterproofing method at the early construction stage. Selecting the suitable construction method is difficult because of the complex interrelationships between many factors of influencing the construction method selection. This study presents an example of selecting suitable method by analyzing LCC (Life Cycle Cost) in roof waterproofing work. In this study, roof waterproofing method is analyzed by LCC(Life Cycle Cost) which is consists of the initial costs, running costs, and removal costs. Sheet waterproofing, membrane waterproofing and asphalt waterproofing costs are compared to select the most economic method. The result of this study revealed that considering LCC is useful in selecting the proper method in the construction work.

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

A Case Study of maintenance cost estimation for military official residence building in BTL project (BTL사업 군관사 건축물의 유지관리비용 산정에 관한 연구)

  • Kwon, Bum-Joon;Kim, Hyun-Kyu;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.851-854
    • /
    • 2008
  • The purpose of this study is to predict the maintenance cost for military official residence building projects which were ordered for five military official residence building. In conducting this study, the adapted research method was to classify initial investment for each construction of the military official residence building and to estimate maintenance cost. This study was analyzed by studying the estimation of maintenance cost in the apartments and present value analysis method. The results of this research are as follows. 1) The initial investments was analyzed that the total construction cost would be 1,683,286 thousand won ; construction(79%), civil(3%), landscaping(2%), MEP(5%), heating and hot water supply system(5%), and water supply and sanitary system(6%) per square meter. 2) Based on the result analyzed above, the maintenance cost of the apartments was analyzed and then estimated the proper maintenance cost by using maintenance cost estimation method and present a value analysis method.

  • PDF

Economic Evaluation of Underground Parking Lot PC Structural System that is Suitable for Long-Life Housing (장수명주택에 적합한 지하주차장 PC구조시스템의 경제성분석에 관한 연구)

  • Jo, Min-Joo;Kim, Jong-Sung
    • Journal of the Korean housing association
    • /
    • v.26 no.2
    • /
    • pp.103-110
    • /
    • 2015
  • Precast Concrete (PC) construction method can be the one that is suitable for long-life housing due to its merit in respect of maintenance and durability based on crack-free from mass production with indirect construction cost-saving-effect due to shortening construction period comparing to the conventional construction method, but it has the problem that causes the raise of direction construction costs. So, this study analyzed its economic feasibility of PC method whose maintenance and durability are excellent for underground parking lot of apartment house for accomplishing cost-saving long-life housing by applying the various structural system. In evaluation of unit module structural system, two-way PC system requires 10 to 28% more costs for frame work than RC rigid frames, and, one-way PC system 98~112%. Although it varies depending on the method, the costs are similar to RC rigid frame structure, provided a proper method is adopted. Also, Model 11, which was most economical in the evaluation, was applied to an real parking lot and about 2 to 6% of construction costs was reduced than RC rigid frames. This seems to be because, although PC system has a higher production cost, introduction of P.S (prestress) reduces member depth and, therefore, height, as well as the number of members per unit module.

The Execution and Estimation of Construction Cost of High Fluidity Concrete Applying Flowing Concrete Method (유동화공법에 의해 제조한 고유동 콘크리트의 시공 및 원가분석)

  • Han, Min-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.2
    • /
    • pp.129-136
    • /
    • 2004
  • High fluidity concrete(HFC) requires high dosage of superplasticizer to acquire sufficient fluidity, and high contents of fine powder and viscosity enhancing admixtures to resist segregation. The use of high amount of admixtures to make HFC at batcher plant in ready mixed concrete company is one of the reasons to raise the manufacturing cost of HFC. For this reason, new type of manufacturing method of HFC are described using both flowing concrete method and segregation reducing superplasticizer(SRS) in order to gain economical profit and offer the convenience for quality control.. As dosage of melamine based superplasticizer increases, it shows that fluidity and bleeding increase, while air contents and ratio of segregation resistance decrease. It also shows that addition of viscosity agent into superplasticizer reduce bleeding and improve segregation resistance of concrete. Dosage of AE agent into superplasticizer containing viscosity agent recovers loss of air contents during flowing procedure. Combination of proper contents of superplasticizer, viscosity agent and AE agent make possible to develope segregation reducing type superplasticizer. Compressive strength of high fluidity concrete applying flowing method with it is higher than that of base concrete. No differences of compressive strength between compacting methods are found. For the estimation of construction cost of high fluidity concreting using segregation reducing type superplasicizer, under same strength levels, although material cost of high fluidity concrete is somewhat higher than that of plain concrete due to segregation reducing type superplasticizer cost, labor cost and equipment cost of high fluidity concrete is cheaper than that of plain concrete. However, based on the strength differences, high fluidity concrete shows lower material cost, labor cost and equipment cost than that of plain concrete due to decreasing in size of member and re-bar caused by high strength development of concrete.

An example of repair works and leakage analysis for school facility (학교건축물의 누수진단 및 보수방안에 관한 사례 연구)

  • 이재범;권시원;곽규성;오상근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.105-108
    • /
    • 2004
  • The most of former schools facility have been planed and constructed with cement liquid waterproofing which is moth to be desired fir behavior of structure. However. It cause to decline safety for structure and also increase repairing cost that by leakage to behavior for thermal effects, Moreover, It is necessary for establishment fundamental counterplan of maintenance for schools facility to improve educational environment in budget support and proper diagnostic tech. and evaluation, repair reinforcement. In present paper, Firstly, we analyze out leakage and defect of schools facility of ㅇㅇ district office of education. Secondly, suggest the proper diagnostic tech. as leakage factor to develope efficiency of using space for durability and safety from leakage with suggestion the proper diagnostic.

  • PDF

Study on Improvement of Cost Calculation Method in Construction less than One Day Workload (1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구)

  • Shin, Dae-Woong;Lee, Young-Do;Shin, Yoonseok;Kim, Gwang-Hee;Yoo, Sangrok;Park, Wonjun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.477-485
    • /
    • 2014
  • Standard production unit system and historical cost data are the most typical data base for calculating budget price in construction. However, these construction cost estimation methods are difficult to calculate proper construction cost because definition, additional allowance or modification criteria is not clear in construction within one day. Therefore, this study identifies problems for standard production unit system and historical cost data and suggests the improvements for them. For the objectives, this study analyzes frequency after implementing survey for 44 specialty contractors in placing at kyeonggi-province. As the results of the study, labor costs in standard production unit system and equipment costs in historical cost data and in construction of pavement and maintenance by project type was exceeded at most high rate against construction cost estimation methods. Based on this result, standard production unit system and historical cost data need to be modified by three improvements such as classification by project scale. These will be baseline data for improvement of construction cost estimation methods for less than one day workload.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.