In construction, the outcome of work depends on the leadership of the project manager, and as a result this has been emerging as an important factor. The purpose of this study is to analyze the main elements of leadership that are essential for project managers, and to rank these elements in order of importance. In this study, leadership and its elements are reviewed through reviewing the literature, and the main elements and their relative importance for project managers were analyzed through questionnaire survey of project managers, contractor engineers, and subcontractor engineers. Through this survey, it was found that the project manager's leadership had a significant influence on the success of a construction project, and this study revealed that the key elements of leadership for project manager could be ranked in the order of resolution, responsibility, and reliance.
Journal of Construction Engineering and Project Management
/
제2권1호
/
pp.1-4
/
2012
The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.
Recently, knowledge transfer has been recognized as one of the major factors for success of IT projects but little investigated in Information Systems research. IT project, which needs collaboration between organization's IT project team and external partner, is an critical source for a firm to acquire external knowledge and to achieve its competitive advantage. Based on this recognition on knowledge transfer under IT project, we investigate a mediation role of knowledge transfer to IT project performance after identifying its antecedents such as project team capabilities and partner capabilities. The research model is tested by analyzing 161 sample data gathered from firms' employees who have participated IT projects within last two years. The results reveal that knowledge transfer has full-mediation effect between its antecedents and IT project performance. Moreover, project team capabilities have more impacts on knowledge transfer than partner capabilities do.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.609-613
/
2011
The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.
최근 들어, IT 부문에서는 ITSM의 도입이 확산되고 있는데, ITSM의 성공을 위해서는 단순히 프로세스의 구축이나 솔루션의 도입만이 아니라 지속적인 개선이 필요하다. 이러한 지속적인 개선의 주요한 도구로 6시그마 기법이 활용되고 있다. 본 연구에서는 프로젝트 수준에서 성공 사례와 실패 사례를 비교 분석하여, ITSM의 지속적인 개선에 6시그마 기법을 성공적으로 적용하는데 영향을 미칠 수 있는 요인들을 식별한다. 이를 위해서 먼저, 문헌 분석을 통해 6시그마 기법 적용의 성공요인을 식별하여 분류하고, 이러한 성공요인들 중에서 본 연구의 목적과 내용에 부합하는 요인을 결정한다. 선별된 요인을 중심으로 성공 사례와 실패 사례를 비교 분석하여, 이러한 요인들이 6시그마를 활용한 ITSM 개선 프로젝트의 성공과 실패에 미치는 영향을 분석한다. 분석 결과, 경영층 및 중간관리자의 참여, 프로젝트 팀의 참여, 프로젝트 선정 및 검증, 고객 및 시장연계, 기업 전략 및 목표 연계 등 5가지 요인 모두가 성공 사례와 실패 사례 간에 차이가 있다는 것을 발견하였다.
Journal of Construction Engineering and Project Management
/
제5권3호
/
pp.10-17
/
2015
Consultant and owner play a very important role in the construction sector which is one of the main sectors in economic development. There are many stakeholders in a construction project including but not limited to: owner, consultant, contractor, subcontractor, and supplier. The consultant is the party who is to stay in close touch with the project owner, which both consultant and owner are considered as the main key stakeholders to make the project happen. It's not a simple task for a consultant to just implement the same style of management and control within various projects that are of a different background and character of owners. Thus, the adjusting plan management and control to the owner environment has been an essential technique to drive the project to success. The objective of this paper is to identify the significant management techniques for adjusting a plan of management and control to the owner environment in Thailand. The methodology is the identification throughout the analogous to abduction from literature review and our empirical observations of Future Engineering Consultants Co, Ltd. We have been in consultation for twenty-five years (25) in Thailand with 209 projects from both public and private owners. As a result, there are (1) Project management styles, (2) Personal style, (3) Owner expectation management, (4) Scope Management, (5) Time Management, (6) Cost Management, (7) Quality Management, and (8) Environmental Management. The input are: a clear defined goal, showing respect by giving good service, maintaining high quality, keeping in touch with owners, and resources. This would give the output of the project's success by meeting the owner's expectation and requirements.
This study focuses on developing a theoretical framework for evaluating Operational Performance of the Marine Forest Creation project on a balanced and comprehensive perspective by using BSC, AHP, and IPA. Also, the purpose of this study is empirically to analyze operational performance of the project and to suggest the future improvement plan. For this purpose, We will first determine the critical success factors(CSF) and key performance indicators(KPI) required for evaluating the performance of the Marine Forest Creation project from the four perspectives of BSC. And, After determining the weight for each of CSF, KPI, and four perspectives of BSC by using AHP, we will measure the project performance. We will also conduct IPA analysis to propose the direction of improvement of the Marine Forest Creation project. The results of this study are as follows. First, this study has drawn 8 critical success factors and 16 key performance indicators for four BSC perspectives based on the theoretical considerations and expert interview survey. Second, as a result of deriving relative importance of BSC perspectives using AHP, customer perspective was the highest, followed by financial perspective, learning and growth perspective, and internal process perspective. Third, as the results of analyzing the importance and performance of BSC perspectives using IPA, customer perspective was the maintenance reinforcement category, financial perspective was the key improvement category, internal process perspective and learning and growth perspective were gradual improvement category. This study has a great academic significance in terms of BSC first tried to evaluate the performance of the Marine Forest Creation project. The results of this study are expected to lead to various discussions for a balanced and comprehensive verification of Marine Forest Creation project performance.
건설업은 일반 제조업의 생산과정과는 달리 다양한 참여주체들이 모여 프로젝트 성공이란 하나의 목표아래 정보를 공유하며 업무를 진행하므로 한 프로젝트마다 일시적인 팀워크가 형성된다. 다양한 참여주체들은 건설공사의 단계별 역할이 다르며, 업무 및 이에 따른 이해관계 역시 복잡하게 얽혀있다. 건설프로젝트의 효율적인 관리와 경영의 최적화를 위하여 CM제도가 도입이 되었다. 따라서 CM제도의 성공을 위해서는 주요 참여주체(발주자, CMr, 설계자, 시공자)의 협력관계가 요구된다. CM제도가 도입된 이래 성공적으로 사업을 수행하기 위한 일환으로 CM성과측정에 대한 많은 노력이 있었으나, 발주자의 입장에서만 바라본 항목으로 측정되고 있다. 이에 본 연구에서는 CM성과를 객관적으로 측정하기 위해서 건설프로젝트의 주요 참여주체인 발주자, CMr, 설계자, 시공자의 균형적인 시각을 바탕으로 한 성과측정 항목의 필요성을 제기 하고자 한다. 건설프로젝트의 주요 참여주체인 4자(발주자, CMr, 설계자, 시공자)의 협력관계를 살펴본 뒤 각 주체에 따라 성과항목에 대한 인식차이가 있다는 것을 검증하였다.
In acquiring and transferring a superior knowledge assesing the intermediate result value of a competitive R&D project is very important for a firm engaging in R&D. Most existing literatures on R&D evaluation are concerned with project selection and resource allocation. In this paper the stage of an R&D project is classified into research, exploratory development, and development. And a model is suggested which evaluates the intermediate result value before completion of development stage under duopoly and oligopolistic competition. Assessed value of the intermediate result transferred to the next tier company can be used as a minimum acceptable price to the inventor when more advanced knowledge acquired through R&D is transferred to the next tier one. The model suggested is composed of structural variables including research cost, success rates, potential profits, discount rate degree of competition. By using exponential distribution for invertion process time in each stage, we derive a formula that can assess the value of the intermediate result, and we demonstrate how the model can be applied to a competitive R&D situation through an example.
Inspired by the success of the High-line project in New York, The Seoul Metropolitan Government launched a project to convert an overpass near Seoul station into a pedestrian park. Seoullo 7017 went through instant success after its opening in May 2017; however, there is a continuous controversy over its long-term impact as shown in the exemplary cases like the High-line project. This study aims for quantitative investigation through the comparative analysis between Seoullo 7017 and the High-Line in the perspectives of spatial configuration. Space Syntax was chosen as the analysis method for this research. Integration (3) in Space Syntax is known to have a high correlation with pedestrian volume; thus, by using this method, spatial structure was analyzed by comparing the statistically verified results of changes in the spatial structure of the Highline with those in Seoul. The results indicated that the influence of Seoullo 7017 was less than that of the High-line in terms of spatial configuration. The reason for this difference is spatial configuration between Manhattan and Seoul. The High-line is located in Manhattan which has an urban grid structure, whereas Seoul has non-geometric urban structure, the neighborhood unit in Korea. Also the center of the overpass isn't connected well with its surroundings.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.