• Title/Summary/Keyword: Project risk

Search Result 1,189, Processing Time 0.029 seconds

Differences in Spatial Variation of Soil Chemistry Between Natural and Anthropogenic Soils

  • Sonn, Yeon-Kyu;Hur, Seung-Oh;Hyun, Byung-Geun;Cho, Hyun-Joon;Shin, Kook-Sik
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.47 no.6
    • /
    • pp.418-424
    • /
    • 2014
  • The Agricultural Land Remodeling Project was launched for agricultural fields with potential risk of flooding which were placed in low-lying area as a part of agricultural sectors of the National 4 River Project. It induced of the reclaimed agricultural fields on a national scale. The arable lands reestablished by reclamation have caused several big problems such as destruction of soil physicochemical properties, and thus the techniques to solve disadvantages were urgently required. In this study, we collected experimental samples from top soils in three agricultural areas, one from conventional agricultural fields (Hwasun, Jeollanam-do) and the others from reclaimed (remodelled) agricultural fields (Naju, Jeollanam-do and Gumi, Gyeongsangbuk-do), The soil chemistry data were analyzed using statistic tools such as semi-variance and kriging, and differences between natural and reconstructed soils were examined. The score, R (Ao) which indicates a dependence distance between each chemical element, was as follows; 21.8~43.5 (Conventional, Hwasoon), 4.4~70.6 (Remodelled, Naju) and 5.3~43.6 (Remodelled, Gumi). These results suggested that chemical properties of the reclaimed agricultural fields had a huge variation. Moreover, the result of kiriging maps also represented a ununiform pattern in the reclaimed lands. As a result of this study, it is strongly required to build up the soil type-specific management techniques for the reclaimed agricultural lands.

A Study on Surveying Functions of RBI Software (RBI 소프트웨어의 기능에 관한 조사연구)

  • Song J S;Shim S H;No W H;Park J H;Choi S C;Kwon J R;Kim J Y;Yoon K B
    • Journal of the Korean Institute of Gas
    • /
    • v.5 no.4 s.16
    • /
    • pp.56-61
    • /
    • 2001
  • Recently RBI softwares have received widespread interests from various industries. The available RBI softwares have variety of levels of analysis, fields of applications and damage mechanisms considered, which depend on the software developing institutes. In this paper results of a GSP(Group Sponsored Project) entitled 'Study on Surveying Functions of Foreign RBI Softwares' are summarized. A part of the study is explained in detail as a sample case for showing the contents of the project. Based on the demo softwares as well as the open documents and contents obtained in the web pages of the developer critical comparisons of the well-known RBI softwares were made. The required functions of the optimal RBI software is also discussed from the review results of this study.

  • PDF

A Study on Digitization and Figuration Analysis of the Underground Mine Cavity Using MIRECO EYE System (MIRECO EYE 시스템을 활용한 광산 지하공동의 수치화 및 형상화 분석 연구)

  • Kim, Soo Lo;Park, Jay Hyun;Yang, In Jae
    • Tunnel and Underground Space
    • /
    • v.28 no.5
    • /
    • pp.387-399
    • /
    • 2018
  • Mine reclamation project is closely related to human's past mining activities and the current human's living environment. It is a reason for the national management. In order to efficiently carry out mine reclamation projects, a precise investigation and analysis of the underground space of the abandoned mine is required. Korea MINE RECLAMATION Corp. is developing a practical technology that is effective in investigating and actually measuring underground cavities. MIRECO EYE system is an exploration equipment for 3D digitization and figuration of underground cavities. As combining a laser, sonar and image acquisition technology, it enables access to information about inaccessible underground cavities and effective management of subsidence risk of mined area. and currently it is also utilized for various purposes in related areas such as investigating urban sinkholes. This article is precise numerical and geometric information analysis obtained through MIRECO EYE system.

Carotenoids and total phenolic contents in plant foods commonly consumed in Korea

  • Yoon, Gun-Ae;Yeum, Kyung-Jin;Cho, Yoon-Suk;Chen, C.Y. Oliver;Tang, Guangwen;Blumberg, Jeffrey B.;Russell, Robert M.;Yoon, Sun;LeeKim, Yang Cha
    • Nutrition Research and Practice
    • /
    • v.6 no.6
    • /
    • pp.481-490
    • /
    • 2012
  • Phytochemicals are reported to provide various biological functions leading to the promotion of health as well as the reduced risk of chronic diseases. Fat-soluble plant pigments, carotenoids, are extensively studied micronutrient phytochemicals for their potential health benefits. It is noteworthy that specific carotenoids may be responsible for different protective effects against certain diseases. In addition, each carotenoid can be obtained from different types of plant foods. Considering the fact that the phytochemical content in foods can vary according to, but not limited to, the varieties and culture conditions, it is important to establish a database of phytochemicals in locally produced plant foods. Currently, information on individual carotenoid content in plant foods commonly consumed in Korea is lacking. As the first step to support the production and consumption of sustainable local plant foods, carotenoids and total phenolic contents of plant foods commonly consumed in Korea are presented and their potential biological functions are discussed in this review.

Environmental Fatigue Evaluation of Top-Mounted In-Core Instrumentation Nozzle (상부 탑재형 노내계측기 노즐의 환경피로평가)

  • Yoon, Hyo-Sub;Kim, Jong-Min;Maeng, Cheol-Soo;Kim, Gee-Seok;Kim, Hyun-Min
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.3
    • /
    • pp.245-252
    • /
    • 2016
  • The development of Top-Mounted In-Core Instrumentation(TM-ICI) is an ongoing project to reduce the risk due to severe accidents by inserting the instrumentation into a reactor closure head instead of a reactor bottom head. As part of this project, environmental fatigue analyses for TM-ICI nozzle have been performed using two methods of NUREG/CR-6909 and Code Case N-761. TM-ICI nozzle is subjected to transient loads for level A, level B and test conditions that should be evaluated for a fatigue analysis. It is found that a cumulative usage factor considering reactor coolant environment for TM-ICI nozzle is evaluated as less than 1, which is ASME Code allowable criteria of a fatigue analysis.

A Study on the Effects for IT Innovation, IT Dependency and Enterprise Architecture Usage on IT-Business Alignment (IT혁신, IT의존성 및 EA활용이 IT-비즈니스 연계(Alignment)에 미치는 영향 연구)

  • Jeon, Woong-Chan;Jeong, Seung-Ryul;Min, Dae-Hong
    • Management & Information Systems Review
    • /
    • v.32 no.2
    • /
    • pp.359-379
    • /
    • 2013
  • The purpose of this paper is to identify and analyze the effects for IT Innovation, IT Dependency and Usage of Enterprise Architecture on IT-Business Alignment that have been on the mind C-level executives for several decades. In order to substantiate 5 hypothesis related 4 variables, 120 IT experts had been surveyed and Partial Least Square Method had been used to analyze the result. The results presented in this research indicates that technical review and feasibility study for IT Project should be performed considerably to align IT and Business requirement efficiently. It also implies that increased IT Dependency in working process results in the clearer specification of requirements for IT Project.

  • PDF

In-vehicle Dilemma Zone Warning System at Signalized Intersections (신호교차로 내 딜레마구간 차내경고시스뎀 개발)

  • Moon Young-Jun;Lee Joo-Il
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.2 no.1 s.2
    • /
    • pp.53-62
    • /
    • 2003
  • This paper demonstrates the in-vehicle dilemma zone warning system (DZWS) project developed as a part of the Driver Advisory and Collision Warning System in Automated Vehicle and Highway System (AVHS). The DZWS project, one of the Korea national ITS projects in 2000 develops the in-vehicle warning device to support drivers' decision making on whether to stop or to proceed to clear the intersection prior to the onset of yellow signal for avoiding the high risk of collision at signalized intersections through the dedicated short range communication (DSRC). This paper explores the design of optimal communication systems between roadway and vehicles, the operational and functional concepts of dilemma zone warning system based on appropriate approach speeds, and the system integration for field test at two sites of signalized intersections. Findings from the system integration indicated that the system would be implemented in eliminating the dilemma zone relative to approach speeds and in reducing red light violations and intersection collisions through the in-vehicle warning device at signalized intersection.

  • PDF

Analysing Decision Making Factors of IT Investment Projects (IT 프로젝트의 기본속성과 사전타당성 분석결과가 투자의사결정에 미치는 영향요인)

  • Koo, Bon-Jae;Lee, Kuk-Hie
    • Information Systems Review
    • /
    • v.9 no.1
    • /
    • pp.161-189
    • /
    • 2007
  • The purposes of this dissertation are to identify various factors affecting the outcomes of feasibility analysis and investment decision makings of new IT project plans and empirically analysis the relationships among them. 9 variables which have been drawn from prior studies and industry practices are the amount of the necessary resource such as development budget and time, the expect financial benefits, the degree of alignments between IT projects and the business strategy, the estimated risk, and the investment priority as the dependent variable. Data from 125 IT projects of K bank, the leading commercial bank in Korea, have been collected and Regression Analysis and ANOVA have been performed. As results, 5 out of 8 hypothesis have been accepted partially or totally.

NET Based Software Rapid Application Development(RAD) Process (닷넷 기반의 소프트웨어 RAD 프로세스 -)

  • 노재우;조현훈;류성열
    • Journal of the Korea Computer Industry Society
    • /
    • v.5 no.2
    • /
    • pp.311-324
    • /
    • 2004
  • Software development undergoes a number of iterations and each iteration forms its own cycle going through requirement analysis, scheme and design, implementation and finally test and evaluation. In this iterated development process, executable releases are produced, improved and eventually developed to a complete system, going through this particular development cycle. Compared to the conventional process, the advantage of rapid iterative development process lies in reducing risk factors in early stage and responding to changes very flexibly. In addition, highly reusable, the process can improve capabilities of the development team while the project is being carried out. As a result, overall balance in quality is secured. The objective of this paper is the research of rapid development process and its case studies showing how to adapt the rapidly changing customer requirements and to transform those requirements into the project timely and adequately. The proposed process is focused on the common and core activities of NET-based MarMIIII, MSF/CD, XP, Agile, PSP and TSP

  • PDF

Knowledge Acquisition and Application for Scheduling Expert System of Highrise Buildings (HRB Expert 구축을 위한 지식의 획득과 활용)

  • Hong Young-Tak;Yu Jung-Ho;Lim Gyeong-Ho;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.92-101
    • /
    • 2005
  • The duration of highrise building projects is more shorter than its increasing of the numbers of floors. The project is liable to overrun of the time in which the project must be complete. AS highrise buildings are increased, time management has been reorganized as critical success factor. To improve time management, time management softwares are introduced and the software's education is made lively in construction company. However a large amount of time management works still have been based on not the software but scheduler's experience. We often can find the time overrun risk of highrise building because of the shortage of scheduler's experience. To diminish the mistake of the scheduler who does not have much experience, we suggested HRB Expert which uses expert's knowledge to make the time plan of highrise building. We made an example of knowledge acquiring and knowledge usage which cased on reinforced concrete work of highrise building by literature review and interview with scheduling expert. The precision of time plan will be enhanced and time overrun will be prevented on condition that HRB Expert is constructed and used