• Title/Summary/Keyword: Project managing System

Search Result 214, Processing Time 0.029 seconds

Project Management : Simplifying or Exacerbating (프로젝트를 위한 프로젝트 관리의 역할)

  • Qureshi, Sheheryar Mohsin;Kang, Chang Wook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.2
    • /
    • pp.9-18
    • /
    • 2014
  • The purpose of this research is to initiate discussion to simplify existing tools and methods for managing projects which make project management a harder job to perform and a tougher task to handle. Additionally, summarizing the definitions of "project" that have been found from reviewing the relevant literature, it deliberates on revising the duties and responsibilities of project manager and proposes performance expectancy triangle explaining a relationship among accountability, responsibility and authority - the Tri-butes. It sheds light on several factors critical to the success of projects. Finally, we propose a function indicating that customer demands or desires greatly affect project complexity.

A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project (형상관리기법을 활용한 대형 프로젝트 정보화 전략개발)

  • Won, Seo Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

Comparison of SE-CMM and KEPIC QAP-1 for Assessing Capability Level of Nuclear QA (원자력 QA의 능력수준 평가를 위한 SE-CMM과 KEPIC QAP-1간의 비교)

  • Lee Sun Kee
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.4
    • /
    • pp.1-14
    • /
    • 2004
  • Nuclear project company establishes and maintains its QA system in the conformance with applicable Codes & Standards and contract provisions. Certifying agency(e.g., Korea Electric Association) or project owner appraises the effectiveness of the company QA system by surveying or auditing it. However, although the company fulfills the requirements of this survey/audit, the capability level of its nuclear QA system is not appraised numerically and developed in that KEPIC QAP-1, used by the company as a nuclear QA guidebook, does not describe an approach for managing the capability level of the QA system. This study evaluates the characteristics of QAP-1 from the viewpoint of SE-CMM(Capability Maturity Model for Systems Engineering) in order to suggest a possible solution.

Development of the Database System for Managing Decommissioning Information from Research Reactor (연구로 해체정보 관리를 위한 데이터베이스 시스템 개발)

  • 정관성;이동규;박희성;이근우;오원진
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.06a
    • /
    • pp.58-71
    • /
    • 2004
  • Korea Research Reactor (KRR) 1&2 has shut down and through preparatory activities, its decommissioning activities are underway. As its decommissioning activities have been done over several years, its relevant data have been spreaded with various type and media all over the discrete place and inadvertently managed, As a result, managing and assessing data of KRR 1&2 has been difficult and complex and its data cannot be evaluated. By developing the decommissioning database system of KRR 1&2 the data of decommissioning activities can be correctly evaluated, being systematically managed and objectively assessed. Finally, the decommissioning project of KRR 1&2 have come to more effectively accomplished. As the data of decommissioning activities can be at last systematically analyzed and objectively assessed, the decommissioning project of KRR 1&2 would be more effectively accomplished.

  • PDF

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

A Study on the Suitability of Unified Project Management Framework Applying for IT Services in Public Organizations (공공기관 IT 서비스 종합관리 프레임워크 도입의 적정성 연구)

  • Park, Min-Kuk;Park, Dae-Ha
    • Journal of Service Research and Studies
    • /
    • v.7 no.3
    • /
    • pp.21-36
    • /
    • 2017
  • Recently in information business, managing and auditing are getting more difficult because of enlargement, intellectualization and convergence. In addition, ordering organizations have been having a difficult time choosing a service because not only there is a huge overlap between information audit system and PMO but also the work boundaries of those two are not clear enough. As the demand that a business managing and auditing frame work need to be more developed in terms of independence, quality, economic feasibility and responsibility has been increased, the Korea Association Of Information Systems Audit has been attempting to improve business management and audit system by proposing Unified Project Management Framework whose process is approximately constructed. This study introduces Unified Project Management Framework which is all-encompassing from the ordering at the very beginning of business to the operating in the post-processing step and then verifies its work scope through a comparative analysis with existing management systems. Also, this thesis examines the necessity of unification of audit system and PMO by analysing existing similar systems. At the end, this study, analyses the suitability of Unified Project Management Framework by evaluating it with IT goal frame of COBIT5 which is constructed based on BSC performance management index. The result of the analysis is expected to help people in charge understanding the features of Unified Project Management Framework before they apply it to practical business.

A Study on A Computerized Input Data Model for A General -Purpose Project Management (교량공사를 중심으로 한 범용 프로젝트 관리를 위한 전산 입력 자료 모형 구축)

  • Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.19-31
    • /
    • 2016
  • The purpose of this study was to establish the initial computerized management database which can be applied to a universal project management computer system for managing universal project management and operation. Database construction model presented in this paper suggested the model of organization, activity and operation of bridge construction(two abutment-three-span) based on the organization information classification system of the facility classification, functional component classification, work classification, resource classification. Database model established in this study are considered to be able to take advantage of a very systematic and scientific management for future universal project management and operations.

Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System- (공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로-)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.12-21
    • /
    • 2013
  • Total Project Cost Management System(TPCMS) was introduced with the purpose of increasing the efficiency of cost control for public construction project in 1994. In this paper, general perception of participants of the public construction project on the TPCMS was examined, and the problems in implementing the TPCMS was figured out through expert interviews and survey. Then better ways to implement the system were drawn based on the problems. To effectively manage the cost of public construction project, basically project cost should be estimated accurately in planning stage and managed based on it to have a project complete within the budget. In addition, the cost need to be managed in more systematic ways in terms of data collection and analysis, and the autonomy in managing the project cost given to the project owner needs to be expanded. Most of all, proper budget should be provided to prevent a project from delay through setting the priority of projects and proper budget allocation based on the priority.

A Study on Creating the SEMP with Project Management Data for the Railway System Development (철도시스템 개발에서 프로젝트관리 데이터를 반영하는 시스템공학관리계획서 생성에 관한 연구)

  • Kim, Ung;Yoon, Jae-Han;Lee, Jae-Chon;Cho, Yun-Ok;Kim, Sang-Ahm;Yoon, Hyuk-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.393-397
    • /
    • 2007
  • During the complex systems development, a great deal of data are generated from both the systems engineering process and project management process, and also some data are required to be prepared for the system engineering management plan (SEMP). For the successful completion of the project, it is necessary to effectively manage all the data in order to maintain data consistency and traceability. To fulfill the necessity, this paper introduces the concept of an integrated data architecture and discusses its realization with $Cradle^{(R)}$(a computer aided systems engineering tool). Also, it was described how to automate the production of the SEMP in that working environment. The result of the approach, managing complex data efficiently in the systems engineering view, has been successfully applied in the Railway Safety Development Program.