Browse > Article
http://dx.doi.org/10.15683/kosdi.2016.3.31.19

A Study on A Computerized Input Data Model for A General -Purpose Project Management  

Park, Hongtae (Department of Civil Engineering, Kongju National University)
Publication Information
Journal of the Society of Disaster Information / v.12, no.1, 2016 , pp. 19-31 More about this Journal
Abstract
The purpose of this study was to establish the initial computerized management database which can be applied to a universal project management computer system for managing universal project management and operation. Database construction model presented in this paper suggested the model of organization, activity and operation of bridge construction(two abutment-three-span) based on the organization information classification system of the facility classification, functional component classification, work classification, resource classification. Database model established in this study are considered to be able to take advantage of a very systematic and scientific management for future universal project management and operations.
Keywords
general-purpose project management computer system; organization-classification system activity; operation activity;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Lee, B. H. (1990). Construction Project Information Classification System) Chung Ang University Graduate School of Construction Management Laboratory, pp.1-26
2 Kim, G, Lee, S. B, Eom, J. T, An, H. O.(1981), Project management and research management, Gyeongmunsa, pp.1-3
3 Program Product, "Conversation and Interactive Project Evaluation and Control General Information Manual(CIPREC)", IBM, pp.1-100
4 Program Product(1977), "Project Analysis and Control System Program Reference Manual(PROJACS)", IBM, pp.1-115
5 Korea Construction Industry Institute(1998), Development of Integrated Information Management System of Design.Construction to Improve Construction Productivity Study, pp.1-50