• Title/Summary/Keyword: Project environment

Search Result 2,925, Processing Time 0.027 seconds

Feasibility Study on Environment-friendly Project to Improve Habitability in National Rental Apartment - focused on Gwangju City - (국민임대주택 주거환경 개선을 위한 친환경사업의 타당성 분석 - 광주광역시를 대상으로 -)

  • Park, Hyeon-Ku;Lee, Hyun-Chul
    • Journal of the Korean housing association
    • /
    • v.20 no.5
    • /
    • pp.23-30
    • /
    • 2009
  • In case of national rental apartment, habitability is generally evaluated low comparing with typical apartments. So, researches and investment are required to increase the residential environment. In this point of view, present study aims to suggest the basic data for improvement of homeless masses' dwelling level through economic feasibility analysis. Firstly national rental apartment, which habitability is considered to be low in the point of environment-friendly, welfare, and convenience, is chosen as objective. Secondly environment-friendly project items including project flow were set up, and then basic model was formed to evaluate economic feasibility through priority survey to residents. In result, priority for two items among six different proposals were higher than the others. This result could be useful when trying to increase the dwelling level of national rental apartment being planned to construct in future.

An Analysis on Farmer's Awareness and Satisfaction Level of the Project for Developing Large-Scale Environment-Friendly Agricultural Districts (광역친환경농업단지 조성사업에 대한 생산자 인식실태 및 만족도 분석)

  • Heo, Seung-Wook
    • Korean Journal of Organic Agriculture
    • /
    • v.21 no.1
    • /
    • pp.49-59
    • /
    • 2013
  • The Purpose of this paper is to analysis on farmer's awareness and satisfaction level of the project for developing large-scale environment-friendly agricultural districts (LSEAD). To analysis farmer's awareness and satisfaction level, a series of farm household surveys were conducted on farmers, take part in the project for developing LSEAD. The sample size of the survey is 80 respectively. As a survey result, awareness and practical use of facilities & equipment shows a little different outcome. Satisfaction level of the project for developing LSEAD is summarized as follows. Influence on disposal of livestock excretions and farmer's consciousness change appears 4.47 and spreading environment-friendly agriculture 4.44, distribution of environment-friendly agricultural product 4.33, and demand of environment-friendly agricultural materials 4.04. In order to sustainable development of LSEAD, a governance system should be established.

Barriers to Success of Project Management (프로젝트 관리의 성공에 영향을 미치는 장애요인)

  • Lee, A-yeon;Moon, Kyung-mi;Kim, Seung-chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.179-190
    • /
    • 2020
  • As the business environment is rapidly changing with globalization and complexity of information flows, the uncertainty is also very increased for project environment. Although many studies have been conducted to find out the critical factors for project success, there still exist different views to define project success. Furthermore, implementing success formula for one project does not necessarily guarantee a success for another project since there are other elements that impede the success of project. In this regards, it is imperative to examine what are the barriers to project success. This study aims to examine the barriers that impede the success of project. Past literature was thoroughly reviewed to collect and develop a preliminary list of elements that affected project performance negatively. Experts were interviewed to refine the list and the final list of the measurement items were developed. A survey questionnaire was developed with the final list of measurement items, and a survey was conducted on the practitioners with project experience. After the survey, an exploratory factor analysis was conducted on the final list to extract the component dimensions which in turn formed the group of project barriers. The exploratory factor analysis provided ten factors, which are difficulty of process management, failure of project feasibility analysis, cost overruns and lack of cost benefits, unclarity project plan, strategic consistency error, stakeholder conflict, inaccuracy of requirement definition, disturbance of communication, technical environment change, negative attitude of top management.

The Analysis of Features of Project Based Learning in Smart Learning Environment (스마트러닝 환경에서의 프로젝트 학습 전략 및 요인 분석)

  • Kim, Soohwan;Han, Seonkwan
    • Journal of The Korean Association of Information Education
    • /
    • v.17 no.3
    • /
    • pp.243-252
    • /
    • 2013
  • In this paper, we analyzed and suggested an educational strategy and features for project-based learning in smart learning environment. Smart learning environment is different of e-learning environment, therefore the educational strategy for smart learning is needed. In this paper, we conducted project-based learning for elementary school students in smart learning environment, and we analyzed the difference between a normal project-based learning and a project based learning in smart learning environment and suggested the educational strategy and the considerations through questionnaire, interview, and observation, Furthermore, we figured out factors that affected educational satisfaction of student. As a result, students thought that there is difference of smart project-based learning in some factors: technology and devices, software, and participation for learning. Also, we found main factors to affect educational satisfaction are two factors: technology and devices, and always-on.

A study on performance capability of local government on the forest tending project (지방자치단체 숲가꾸기 사업 수행역량에 관한 연구)

  • Kim, Myoung-Kwan;Oh, Do-Kyo;Kim, Se-Bin
    • Korean Journal of Agricultural Science
    • /
    • v.40 no.1
    • /
    • pp.1-11
    • /
    • 2013
  • The study proposes to draw out the correlation on what kinds of influences local government personnel's performance capability affect the overall quality of the project, and to suggest institutional supplement policies. For the study, two analytical methods are conducted. First, a hypothesis per each factor was set by classifying the factors which affect the personnel's performance capability into organizational and individual factors. Second, a survey was conducted targeting the project management personnels and presented the result on the verification of the hypothesis through statistic techniques. As the result, it is considered that the quality of forest tending project is more affected by the individual factors than the organizational factor, thereby this study suggests the methods of reinforcement in project management personnel's performance capability.

A Study on the Changes in Residential Environments after Residential Environments Improvement Projects (주거환경개선사업이후 주거 환경 변화에 관한 연구 - 대구광역시 주거환경개선사업의 물리적 환경 분석을 중심으로 -)

  • Kim, Young-Hwa;Lee, Sang-Hong
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.3-12
    • /
    • 2018
  • This research aims at analyzing the changes in residential environment after a residential environment improvement project focusing on the analysis into the physical environment of a residential environment improvement project, and examining in what direction the changes by residents' own efforts occurred after public support, such as infrastructure. The present residence development method has become different from the previous pulling down method and is focused on regeneration. By examining in what direction the target residence is being changed because of the development by residents' own efforts after the government's public investment at this time, this study also aims at investigating the direction to develop a guideline for residential improvement for later improvement of deteriorated residence. As for the contents of the analysis, changes in public support, such as infrastructure, and other areas after the residential environment improvement project were compared and analyzed from the land use, street system, and condition of buildings before the residential environment improvement project through field survey, geographic information system(GIS), registered land and building data and so on. The biggest change since the support from the government was that at the beginning of the project, the application of special provision of building laws and different financial supports led to lots of newly built buildings. Since then, their number has decreased rapidly, and in most cases, there have been some changes in part, such as changes in the use of land or repair of disposal tanks. Most newly built buildings were multi-household houses, and it has caused road capacity and parking lot capacity, etc., to be exceeded, which has worsened the pleasantness of the living environment. In addition, other problems have also appeared, for example, the lack of residence supporting facilities yet with a higher level of residential density. Regarding the changes in the residential environment after the residential environment improvement project, maintenance of houses were conducted in some degree as diverse alleviation policies to improve poor residence, yet the absence of the guideline for the direction of developing the whole district has made the residence environment more dense and deteriorated. To solve these problems, in advance to a residential improvement project, specific management methods based on short-, mid- and long-term plans for the direction of development by residents' own efforts and a sustainable guideline seem to be necessary.

A Study on the Feasibility analysis model for Housing Environment Improvement Project of Depressed region - Focused on the project by the public sector - (낙후지역 주거환경개선사업 타당성분석 평가모델 연구 - 공공(公共) 시행사업을 중심으로 -)

  • Choi, Jung-Min;Choi, Chan-Hwan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.14 no.1
    • /
    • pp.83-90
    • /
    • 2012
  • The purpose of this study was to set and analyze the standard model for prioritizing and deciding to take part in housing environment improvement project in the perspective of the public sector. The results of this study were as follows. The location competitiveness, potential demand, marketability and competitive price, etc were selected by assessment indicators. And Various indicators, including of the size of the area, public transportation, accessibility, convenience of living and the influx of the population, were used by weights indexes. The profit of local residents and the public promoter, variability of earnings, sensitivity analysis and the ratio of money in reserve, etc were also established as detailed indexes for the profitability and business risk analysis. To analyze the cash flow of the project process and review the necessary capital in advance, the payback, total working expenses, gearing ratio and sensitivity of a risk, etc were also set as additional detailed indexes. Lastly, considering it is quasi-public projects, the measure to protect tenants, necessity need of redevelopment and local government's will were additionally used by indexes. And Points were distributed on the importance of each index and scored out of 100. It will allow for the public project promoter to decide rationally whether to come in on the project. The public project promoter like the Korea Land and Housing Corporation will be able to make use of various indexes are based on this study to make decision whether joining the housing environment improvement project in depressed region.

Practice and Limitations of the Environment Improvement Project in the Delinquent Residential Areas for Promoting Mental Health - Focusing on the Area of Saeddeul Maeul Project in Donghae City - (정신건강증진을 위한 노후 불량주거지역 환경개선사업의 실천과 한계 - 동해시 새뜰마을 사업 지역을 중심으로 -)

  • Lee, Sang-Soo;Park, Hoon
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.21 no.3
    • /
    • pp.49-60
    • /
    • 2019
  • This study is on the practice and limitation of the environment improvement project in the delinquent residential areas implemented as part of the urban restoration project that this study was carried out with the subject of the Saeddeul Village Project in Balhan Dongmunsan District of Donghae City that is implemented as part of resident-participating urban rehabilitation that has emerged as a socially important issue. In particular, at a time the issues of increasing senior population and poverty resulted thereof have surfaced in the society that this study has taken a look at the characteristics in the planning and practice process in the Saeddeul Village Project area for the purpose of improving the mental health. In the planning process and practice process, those human-care project and resident competency strengthening projects, together with physical environment improvement, are implemented, and the contents implemented by respective project are purported to establish the community identity through voluntary participation of local residents together with the environment improvement of the villages on the basis of resident participation as well as leading the economic independence by the village with its own discretion. However, the limitations in the practice process and exposure of problems that may be experienced in the field have made difficulties in such approach and provokes the difficulties of project performance depending on the conflicts in community constituents. Under such a relationship, it is required to have the endeavors to facilitate the community and solution of issued, and this study presents the need of access for revitalizing the regional welfare system.

A Case Study on Villagers' Participation and Project Achievement in Rural Development - Focusing on Saemaul Undong Project in Myanmar - (농촌지역개발의 주민참여와 사업성과에 관한 사례 연구 - 미얀마 농촌공동체 개발사업을 중심으로 -)

  • Lee, Seung-won;Shim, Sung-hee
    • Journal of Korean Society of Rural Planning
    • /
    • v.26 no.3
    • /
    • pp.79-89
    • /
    • 2020
  • Since the Republic of Korea had been registered as the 24th member of OECD DAC in 2009, recent trend of Korea's ODA has showed drastic increase including agriculture and rural development sector. Particularly, various rural development projects have been implemented adopting development experience and methodology of Saemaul Undong (SMU, New Village Movement). This study implemented statistical analysis between villagers' participation and achievement of rural community development project, based on practical data out of 'Saemaul Undong Project in Myanmar', to suggest meaningful implication in terms of participatory rural development. It emphasized the importance and necessity of villagers' participation in rural development through regression analysis that proved positive correlation between villagers' participation and rural development project. It proves that income-generation part has significantly greater influence than capacity-building and living environment part in terms of rural community development project: Based on the analysis, comparing impact of each independent variable, income generation has 1.88 and 1.68 times greater impact than capacity-building and living environment respectively. The result, on the other side, rather raise the importance of careful consideration for project design and implementation to harmonize those three parts altogether especially rural development for developing countries: capacity-building and living environment parts suggests essential foundation to make income generation successful that enables to secure project achievement and sustainability.

Study on Rural Living Environment and Satisfaction by Improving Rural Hosing Renewal Project (농촌주거환경개선사업에 따른 농촌주거환경실태와 주민만족도)

  • Kim, Sang-Bum;Cho, Soon-Jae;Kang, Bang-Hum;Kim, Hye-Min
    • Journal of Korean Society of Rural Planning
    • /
    • v.9 no.3 s.20
    • /
    • pp.9-16
    • /
    • 2003
  • The aim of this study is to analyze the improvement of housing renewal project and suggest the conditions of rural housing environment filled with the resident's desire, requirements concerning about characteristics of a rural environment and temporal and social requirements. The project for improvement of rural housing environment has been executed in a few ways: reform of the rural housing environment and the development of territories for settlement of a desolate region. To analyze and assess the accomplishments, we considered codes and process related to the project for improvement of rural housing environment and analyzed present conditions and problems through many reference books and administrative data. According to these results, devices in future business for improvement of rural housing environment are as follows; It should required a rational allocation of working space, living space, cultural activity space suitable for rural area characteristics and changed into uniformed system in various projects governed by different institutions.