Performance Analysis of BIM Labor using Case Analysis (사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석)

  • Kim, Hyoung-Jin;Yoo, Moo-Young;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

Performance improvement of BOP Components for 1kW Stationary Fuel Cell Systems to Promote Green-Home Dissemination Project (그린홈 보급확대를 위한 건물용 연료전지 보조기기의 성능 향상)

  • Lee, Sunho;Kim, Dongha;Kim, Minseok;Jun, Heekwon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.89.1-89.1
    • /
    • 2011
  • According to green growth's policy, green-home dissemination's projects are promoting. Among them, stationary fuel cell systems are receiving attention due to high efficiency and clear energy. But it need absolutely to develop cost down technologies and improve system durability for commercialization of the fuel cell system. To achieve this objectives, in 2009, the Korean Government and "Korea Institute of Energy Technology Evaluation and Planning(KETEP)" launched into the strategic development project of BOP technology for practical applications and commercializations of stationary fuel cell systems, named "Technology Development on Cost Reduction of BOP Components for 1kW Stationary Fuel Cell Systems to Promote Green-Home Dissemination Project". This paper introduces a summary of improved BOP performances that has been achieved through the 2nd year development precesses(2010.06~2011.05) base on 1st year development precesses(2009.06~2010.05). The major elements for fuel cell systems are cathode air blowers, burner air blowers, preferential oxidation air blowers, fuel blowers, cooling water pumps, reformer water pumps, heat recovery pumps, mass flow meters, electrical valves, safety valves and a low-voltage inverter. Key targets of those elements are the reduction of cost, power consumption and noise. Invert's key targets are development the low -voltage technologies in order to reduce the number of unit cell in fuel cell system's stack.

  • PDF

An RFID and BIM based Simulator for Construction Material Logistics and Progress Management (RFID와 BIM을 활용한 건설 자재 물류 및 진도관리 시뮬레이터 개발)

  • Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.46-54
    • /
    • 2011
  • There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design RIM data to construction BIM data.

An Earthwork Districting Model for Large Construction Projects (단지공사의 토공구획 계획 모델)

  • Baek, Hyeon Gi;Kang, Sang Hyeok;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.715-723
    • /
    • 2015
  • Earthwork in a large construction project such as a land development generally costs 20-30% of the total cost. The earthmoving process, comprising of four repetitive tasks: loading, hauling, unloading, returning, is quite simple and it does not need delicate or advanced techniques. Therefore, earthmoving earthwork planning can heavily affect the cost and time., and Even a slight deviation from the plan can increase or decrease the cost and time. This study presents a planning model that minimizes average haul distance in a large complex construction project. Based on earthwork planning, practitioners' heuristics, a districting algorithm and Simulated Annealing algorithm were employed to build the model. Districting algorithm plays a role that divides in dividing an earthmoving area into several sections. Simulated annealing provides a function that decides whether a new generated solution is confident. Finally, the proposed model was applied to a real earthmoving project of a large land development. It was found that the model showed approximately 14% improvement in average hauling distance compared to the actual design plan.

A Cost-Benefit Analysis of Road Construction in International Development Cooperation Project - A Case of KOICA's Lao Cai Happiness Program in Vietnam - (국제개발협력사업의 마을도로 건설 비용편익 분석 - KOICA 베트남 라오까이 행복프로그램 적용사례 -)

  • Lee, Ah-Youn;Kong, Ki-Seo;Yoon, Seong-Soo;Song, Yang-Hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.137-144
    • /
    • 2018
  • The purpose of this study is to measure the cost-benefit of a road construction project in Vietnam through international development cooperation, which includes private grants and Official Development Assistance(ODA). In developing countries, it is difficult and costly to use data on markets, the CVM(Contingent Valuation Method) to measure the WTP(Willingness-to-Pay) as the benefits of road construction are used. A total of 232 villagers in 16 villages of Lao Cai Province in Northern Vietnam have been surveyed. It is found that the Benefit-Cost Ratio(B/C) in all 3 models are found to be well over 1.0, ranging from 2.8 to 3.64 with the discount rate of 0.06. These BC ratios imply the road construction project in Lao Cai can be justified. Also, it is found that the shortened travel time is the most relevant factor for WTP among direct benefits and the enhanced academic achievement of the children is the most relevant factor among indirect benefits, due to easier and faster access to schools, which in turn increase the school attendance rate. The result of this study can be used to justify other similar projects in Vietnam, even though the benefits may have to be reassessed in other countries.

A Model for Predicting Management Costs of the Multiple Prime Contract (분리발주 방식의 관리비용 예측 모델)

  • Kim, Kihyun;Kim, Kyungrai;Park, Wansoo;Lee, Eunjae;Hwang, Youngkyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.44-52
    • /
    • 2014
  • On March, 2013, the Government announced the Multiple Prime Contract method will be expanded in public building construction projects. The applying multiple prime contract method has been immersing issue among all stakeholders of construction project. The owner conducts the role of a general contactor as well as owner's original responsibility while construction works being executed by specialty contractors. If the owner has not experience of project management, it should be bring about increasing management cost due to the interface problems among prime contractors. With this reason, it is difficult to administrate the multiple prime contract. So far there has been no methodology of predicting management cost in the multiple prime contract. Therefore, this study aims to enable the operation of efficient multiple prime contracts by developing a model to predict their management costs.

Uruguay ? Brazil Inland Waterway Transportation System Defining the Right Vessel

  • Petrocelli, Gaston L.;Hayashi, Yuji;Murai, Koji;Kubo, Masayoshi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.211-216
    • /
    • 2006
  • Within the frame of the MERCOSUR (South Common Market), one of the most important goals to achieve by its member states is a better cost effective international cargo transportation system. For this purpose the project of developing a commercial waterway linking the east region of Uruguay with the south of Brazil has been under study for a number of years now. Because of the high costs involved on the development of such waterway, the project has been indefinitely delayed. It is our intention to show an alternative way to reduce the present obstacles by using a budget oriented approach in order to determine the vessel best suited to use on the proposed waterway. So far, every study related to the project has been focused on the amount of work needed to modify the environment in order to accommodate the hardware already available in the region. The conclusions show that the cost of opening and maintaining the required navigation channel is high enough to discourage investment; the added responsibility to take care of any environmental damage incurred during the building and/or operation of the waterway makes searching for a less costly and hazardous option an interesting challenge. The proposed terminal on the Cebollat? River would be located at the heart of the Uruguayan rice growing region. Uruguay exports 90% of its rice production, being Brazil its biggest buyer. Wood chips and clinker are the other types of cargo considered to use the proposed waterway in route to either Brazil or to overseas destinations through the deep water port of Rio Grande. Through the analysis of local data by a Geographical Information System, international regulations regarding inland waterways and shallow draught vessel characteristics, we seek to propose a cost efficient alternative to apply on this particular scenario.

  • PDF

A Comparative Analysis of Risk Assessment Depending on International Project Types (플랜트, 건축, 토목 공종별 해외건설 리스크평가 비교분석)

  • Baek, Seungwon;Han, Seung-Heon;Jung, Wooyong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.125-136
    • /
    • 2019
  • This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by product type using rank analysis, ANOVA and correlation analysis. As a result, plant and civil projects have worse risk level than architecture projects not only in before bid but also in after award. Especially, country risk is the worst risk in both plant and civil projects, followed by project risk and capability risk. Also, although plant and civil projects reflect more contingency than architecture projects, contingency is not correlated with the checked risk level before bid. Lastly, the cost growth rate is correlated with the actual risk level in all product types. This study is expected to support in planning better practical risk management for international construction projects.

An Analysis of Construction Execution Tasks for Successful Residential Mechanical Projects (프로젝트 성공을 위한 효과적인 시공업무 및 영향 분석 - 아파트 설비공사를 중심으로 -)

  • Kang, Sang-Hun;Kim, Dae Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.60-67
    • /
    • 2019
  • The main purpose of this study is to identify the tasks performed at the construction stage of apartment houses and analyze the major construction tasks that may affect the performance indicators and analyze the impact on project performance. Based on expert opinions through preliminary research, pilot data, construction database, and other research trends, domestic and foreign research trends are divided into five major tasks, and each is divided into process management (P'1 ~ P'6), construction management (C'1 ~ C'5), environmental management (E'1 ~ E'4), quality control (Q'1 ~ Q'5), safety management (S'1 ~ S'5). Subsequently, each major task was subdivided into 24 detailed tasks. An independent t-test was conducted to analyze the impact on cost. We compared the importance of achieving the project goal and identified the construction work of concrete important construction which affects not only the cost but also the schedule performance index for the degree of significance of less than 0.05.

Risk based Value Index Evaluation Model for Modular Design Alternatives in Plant Construction Projects (플랜트 건설사업의 모듈러 설계대안별 RVI 평가 모델)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.98-107
    • /
    • 2022
  • The purpose of this study is to suggest a model for evaluation of a risk based value index for modular design alternatives in plant construction projects. Accordingly, 1) Setting the basic project cost and the scope to apply the module, 2) Evaluating the importance, easiness, and effectiveness index for Engineering, Procurement, Fabrication, transportation, and construction work, 3) Estimating the total project cost by analyzing the risk reserve Step, 4) Comparing the effectiveness index and total project cost for each modular design alternative, it was composed of the steps of deriving RVI. To verify such a model, Plan-A, which applied a module to one process, and Plan-B, which applied a module to three processes, were composed to evaluate RVI.