• Title/Summary/Keyword: Project cost

Search Result 2,467, Processing Time 0.034 seconds

A Standard Section-Based Approximate Cost Estimating Model on Tunnel (II) - Cost Variance Index Table and Test - (표준단면을 이용한 터널 공사비 예측모델 개발 (II) - 공사비 변동 모델 및 검증 -)

  • Cho, Jeongyeon;Kim, Sang-Kwi;Kim, Kyoungmin;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.677-684
    • /
    • 2008
  • The paper provides an approximate cost estimating model that can be used for tunnel. Based on the previous study analyzed critical factors that have impact on tunnel construction cost, this paper establishes a cost variance index table that reflects the cost impacts due to the change of the critical cost factors. An estimating procedure is described utilizing the index table. For the verification of the suggested model, the comparison of the estimated construction cost with real project cost is performed. The estimated results range from 95%~111% of the real project costs. As an approximate tunnel cost estimating model, the model can be utilized to quickly estimate tunnel construction costs based on the conceptual information at the planning stage and to efficiently make a decision on design alternatives.

Information System for Managing Cost Reimbursable Construction Projects (실비정산 비용지불 방식에 적용 가능한 건설 프로젝트 정보관리 시스템)

  • Kang, Namhee;Song, Hojeong;Kim, Hyunjung;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.2
    • /
    • pp.237-247
    • /
    • 2015
  • The project management information system (PMIS) has recently been developed by using the information technology(IT) in order to implement advanced information management technology to construction industry in Korea. The PMIS has been applied not only to domestic construction projects, but also to some overseas projects executed by Korean construction companies. This study was performed to develop the PMIS that is tailored to the US construction IT market. It has been monopolized by the US-based IT companies, but other companies are recently emerging with competitive technology and market strategy. As a preceding study, existing commercially available systems were analyzed, and the required features of the PMIS were identified by analyzing the core elements of contract, process and cost management about construction projects in the US. Then, the PMIS was developed based on the aforementioned analysis results. The system includes the document management module with an internal electronic approval system, the cost-plus-based automatic labor cost calculation module, and the progress management module to support the integrated project cost management. In addition, the functionality of the developed system was verified by experts about construction management in the US via questionnaire survey. The developed PMIS, in this study, is expected to be applied not only to the US construction IT market as a system specialized for the US construction industry, but also to other oversea markets in the future.

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

Cost-benefit analysis of project of promoting the economy in Samcheok City (폐광지역 경제자립형 사업에 대한 비용-편익 분석 : 강원도 삼척시를 중심으로)

  • Jeong, Dong-Won;Jin, Se-Jun;Han, Jong-Ho
    • Journal of Energy Engineering
    • /
    • v.23 no.4
    • /
    • pp.176-182
    • /
    • 2014
  • The project of promoting the economy has attracted attention as on strategy for the economic revitalization of abandoned mine areas which is promoting by local government based on the "Special law on the development of abandoned mine areas". Through the analysis of economic feasibility analysis, the government is trying to determine the presence or absence of budget support to project of promoting the economy of local government. Furthermore, this paper attempts to conduct a cost-benefit analysis, using net present value(NPV), benefit/cost(B/C) ratio, internal rate of return(IRR) techniques for project of promoting the economy of Samcheok City. The project of promoting the economic of Samcheok City is promoting the Yukbaeksan flowers rest park and Glass Art Culture and Tourism theme park. The results indicate that NPV, B/C ratio and IRR of Yukbaeksan flowers rest park are 3,937 million won, 1.06, 6.18% and NPV, B/C ratio and IRR of Glass Art Culture and Tourism theme park are 8,311 million won, 1.34 and 9.47. Accordingly, the projects of promoting the economic of Samcheok City ensure economic feasibility that the three indicators have exceeded 0, 1.0 and 5.5% respectively. Moreover, the analysis results can be used effectively in the decision for the project of promoting ecomony of Samcheok city.

Minimizing Project Quality Costs by Activity-Based Prevention (활동기준예방에 의한 프로젝트 품질코스트 최소화)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.89-97
    • /
    • 2011
  • Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.

Fishermen's Perception and Economic Feasibility of Inland Waters Ranching Project : Focusing on the Branches of Geum River (내수면목장화사업의 어업인 인식도 및 경제효과 : 금강 지천을 중심으로)

  • Hwang, Jin-Wook
    • The Journal of Fisheries Business Administration
    • /
    • v.53 no.2
    • /
    • pp.1-20
    • /
    • 2022
  • This study is aimed to analyze fishermen's perception and the economic feasibility of inland waters ranching project on the branches of Geum River. Analysis of fishermen's perception on the branches of Geum River showed that fishermen had an affirmative response on the inland freshwater ranching project related issues such as fisheries resources enhancement, necessity of project, economic achievement as so on. The model of inland waters ranching project on the branches of Geum River is designed to fisheries resources enhancement, habitat compositiom, ecology tours, use and management of resources. The results of the economic feasibility of inland waters ranching project on the branches of Geum River were internal rate of return (IRR) was 18.43%, a benefit-cost ratio was shown to be 1.54, net present value (NPV) was 4,929 thousand won, which indicates the economic feasibility of inland waters ranching project.

INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

A Verification of the Project Manager-Oriented Model for Apartment Construction in the Public Sector (공공 아파트건설의 PMr형 사업관리모델에 대한 실증적 사레검증)

  • Sohn Jeong-Rak;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.191-202
    • /
    • 2004
  • In this study, the project manager-oriented organization model has been verified by analysing it with forming a clear definition of detailed unitary duty entity to develop current non-efficient CM system constituted by functional organization with the decentralized responsibility and apply the model As a result from verification that the model provides valid solutions by comparing it with the existing, the model is better than the existing in cost savings, target profit sales rate, total rate of new on sales. Moreover, various activities in cost savings and cases where improvement is feasible are executed. However, the model caused some problems in organizational operation, project management and in division of duties so this study proposed improving management method

The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis (댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구)

  • Yoon, Jae-Ho;Moon, Young-Il
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.715-724
    • /
    • 2003
  • It is true that SOC facilities, such as dams, need long life cycles since more time has to be invested for the phases of planning, examination, feasibility study, design, contract, construction, and maintenance. This longer life cycle is easily exposed to the risk. And thus, brings additional cost by the delayed project, convenient loss according to the additional run of use, and benefit lose of not to using the facilities. So, the purpose of this study is to try to find a solution to reduce these time consuming problems which could diminish the whole national competition. Hence, this study is to show efficient, systematical project performance and network model by using reciprocal analyses between the construction period and cost based on economical analysis of each phase of life cycles. In addition, on the basis of these outputs, the Fast Track Method is suggested as an alternative solution as a new Approach in Life Cycle's Analysis.