• 제목/요약/키워드: Project Work

검색결과 2,078건 처리시간 0.023초

Introduction On the Importance of Engineering Survey in Project Management

  • Meng, Yanlei;Chen, Guiming
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.260-262
    • /
    • 2017
  • During the construction of the project, all surveying and mapping work is collectively referred to as engineering survey. Therefore, the measurement work contains a wide range of content, in the engineering survey, design and construction management stage are involved. To the actual work, the project measurement runs through the project building in a number of stages, and provide basic services. This paper mainly through the analysis of engineering measurement at all stages of the role played by the measurement work in the project management work to do the following description.

  • PDF

원자력발전소 Work Breakdown Structure 개발 (Development of Work Breakdown Structure for Nuclear Power Plant)

  • 조영혁;양명덕
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

업무분할체계를 이용한 사업관리정보시스템 (Project Management Information System Using Work Breakdown Structure)

  • 이정구
    • 한국산업정보학회:학술대회논문집
    • /
    • 한국산업정보학회 1997년도 추계학술대회 발표논문집:21세기를 향한 정보통신 기술의 전망
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • 제14권3호
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

ANALYSIS AND IMPROVEMENT OF FINISHING WORK PROCESS FOR COST MANAGEMENT (FOCUSED ON INDOOR FINISHING WORK OF APARTMENT)

  • Hoon-Ku Lee;Yoon-sun Lee;Ja-Young Yoon;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.711-720
    • /
    • 2007
  • Apartment housing in the Korean domestic construction industry has had various and high-quality finishing work since the enforcement of price deregulation in 1998. Before the enforcement of price deregulation, feasibility studies of housing projects have not had particular difficulties as uniform description of finishing work items were reflected and finishing work cost also was equalized. However, the recent distinction of finishing work based on the same floor plan brings about project cost variation, along with many effects on construction management due to project cost increment. Accordingly, this paper suggests the improved plan of cost management to control the feasibility study result consistently during the life cycle of a project through an analysis based on cost management phase due to cost blackout, appearing at the commencement of a project, cost gradation caused by high-quality finishing work item, and cost reduction due to the degradation of finishing work after analysis of current apartment construction process focused on finishing work using the IDEF process analysis technique.

  • PDF

AI-Based Project Similarity Evaluation Model Using Project Scope Statements

  • Ko, Taewoo;Jeong, H. David;Lee, JeeHee
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.284-291
    • /
    • 2022
  • Historical data from comparable projects can serve as benchmarking data for an ongoing project's planning during the project scoping phase. As project owners typically store substantial amounts of data generated throughout project life cycles in digitized databases, they can capture appropriate data to support various project planning activities by accessing digital databases. One of the most important work tasks in this process is identifying one or more past projects comparable to a new project. The uniqueness and complexity of construction projects along with unorganized data, impede the reliable identification of comparable past projects. A project scope document provides the preliminary overview of a project in terms of the extent of the project and project requirements. However, narratives and free-formatted descriptions of project scopes are a significant and time-consuming barrier if a human needs to review them and determine similar projects. This study proposes an Artificial Intelligence-driven model for analyzing project scope descriptions and evaluating project similarity using natural language processing (NLP) techniques. The proposed algorithm can intelligently a) extract major work activities from unstructured descriptions held in a database and b) quantify similarities by considering the semantic features of texts representing work activities. The proposed model enhances historical comparable project identification by systematically analyzing project scopes.

  • PDF

Project Approach in the Organization of Scientific and Methodological Work by Applying Information Technology in Higher Education Institutions

  • Bieliaiev, Serhii;Ponomarova, Halyna;Repko, Inna;Stepanets, Ivan;Chagovets, Alla;Mykhailichenko, Mykola
    • International Journal of Computer Science & Network Security
    • /
    • 제21권12spc호
    • /
    • pp.620-628
    • /
    • 2021
  • The article is devoted to studying the development of scientific and methodological work and its impact on the quality of students' vocational training in higher pedagogical education institutions by applying information technology. The article aim is to development of the organizational methodological support and pedagogical diagnostics of the effectiveness of the project «Modelling scientific and methodological work in a higher education pedagogical institution by applying information technology » realization in the framework of increasing the level of scientific and methodological work in a higher education pedagogical institution as a factor contributing to enhancing the quality of pedagogical education. The research program of the project activity envisages stating and substantiating the problem of scientific and methodological work by applying information technology in the framework of increasing the level and quality of educational activities in a higher pedagogical education institution through the implementation of the project approach, developing a model for the system of organizational and methodological support of the project implementation as well as monitoring the process and evaluating the results of the project implementation in terms of developing teachers' scientific, methodological, information competency and enhancing students' progress in studying. The set of criteria were developed to evaluate the level of formation of scientific and methodological competency as a result of implementing the project for the development of scientific and methodological work. The scientific and methodological work by applying information technology in the academy was carried out in accordance with the following principles: systematic character, consistent diagnostics, practical focus, scientific organizational and methodological support.

Project Approach in the Organization of Scientific and Methodological Work by Applying Information Technology in Higher Education Institutions

  • Bieliaiev, Serhii;Ponomarova, Halyna;Repko, Inna;Stepanets, Ivan;Chagovets, Alla;Mykhailichenko, Mykola
    • International Journal of Computer Science & Network Security
    • /
    • 제21권12spc호
    • /
    • pp.703-711
    • /
    • 2021
  • The article is devoted to studying the development of scientific and methodological work and its impact on the quality of students' vocational training in higher pedagogical education institutions by applying information technology. The article aim is to development of the organizational methodological support and pedagogical diagnostics of the effectiveness of the project «Modelling scientific and methodological work in a higher education pedagogical institution by applying information technology » realization in the framework of increasing the level of scientific and methodological work in a higher education pedagogical institution as a factor contributing to enhancing the quality of pedagogical education. The research program of the project activity envisages stating and substantiating the problem of scientific and methodological work by applying information technology in the framework of increasing the level and quality of educational activities in a higher pedagogical education institution through the implementation of the project approach, developing a model for the system of organizational and methodological support of the project implementation as well as monitoring the process and evaluating the results of the project implementation in terms of developing teachers' scientific, methodological, information competency and enhancing students' progress in studying. The set of criteria were developed to evaluate the level of formation of scientific and methodological competency as a result of implementing the project for the development of scientific and methodological work. The scientific and methodological work by applying information technology in the academy was carried out in accordance with the following principles: systematic character, consistent diagnostics, practical focus, scientific organizational and methodological support.

확률이론을 이용한 프로젝트 예비비 산정 및 관리 (Probabilistic Applications for Estimating and Managing Project Contingency)

  • 이만희;유위성;이학기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.224-227
    • /
    • 2004
  • 건설사업관리자는 사업을 진행하기 전에 예측하지 못한 위험 발생 가능성에 대비한 예비비를 항상 고려해야 한다. 예비비를 충분히 고려하지 않고 사업을 수행하게 되면 리스크로 인한 총사업비에서의 초과 비용이 누적되어 향후 사업진행에 지장을 줄 수도 있기 때문이다. 과거의 실적자료를 바탕으로 적정한 예비비를 산정하기 위해 확률적 평가가 필요하며, 조건부 확률(conditional probability)을 사용함으로써 공정이 진행되면서 완료된 work package의 실제 공사비를 정보로 하여 잔여 공정에 대해 공사비와 예비비를 재산 정할 수 있다. 즉, 증가된 정보로 공사의 불확실성을 감소시키고 좀더 현실적인 총사업비를 예측할 수 있게 된다. 본 연구에서는 예비비 산정 및 관리 프로세스를 제시하기 위한 기초적인 연구로써 가상 프로젝트의 5개 work package를 대상으로 확률이론의 적용 가능성을 제시하였다.

  • PDF