• Title/Summary/Keyword: Project Size

Search Result 914, Processing Time 0.028 seconds

A Study of Introduction of CMMI on Design Process for Improving Collaboration (설계협업 프로세스의 개선을 위한 CMMI 도입 방안에 대한 연구)

  • Jun, Joon-Ki;Yi, June-Seong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.436-440
    • /
    • 2008
  • Evaluating the work process of the organization is necessary to improve efficiency and make high quality of results. As size of construction projects are bigger, it is also applied to design firm. By applying efficient process, design team can reduce rework and waste. To make systematic process and keep a continuous progress, process evaluation is required. On this study, CMMI(Capability Maturity Model Integration) concept is benchmarked. Originally CMMI is suggested to evaluating capability of work process of Soft Ware developing organization by SEI(Software Engineering Institute). From CMMI system, direction of making evaluating method of design project performing team is drove. After worked out the evaluation method of capability maturity of process in design team, it could contribute making progress in the design process and satisfying client.

  • PDF

Improved Method for Increasing Maintenance Efficiency of Construction Structure Using Augmented Reality by Marker-Less Method (비마커기반 증강현실을 이용한 건설 구조물 유지관리 효율화 방안)

  • Moon, So Yeong;Yun, Su Young;Kim, Hyeon Seung;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.961-968
    • /
    • 2015
  • As BIM has been increasingly applied to building project recently, its application to civil engineering project is also on the rise. As construction structures have been expanded and complicated in a size and type, the information for handling maintenance process has also increased. Thus, to actively utilize the BIM information created at the design stage, this study has been carried out to establish a maintenance system using a marker-less based augmented reality method, by presenting a maintenance system for the construction structures using augmented reality. A SURF algorithm is used to link the 3D objects in the design and construction phases to the maintenance phase. The presented method in this study can increase the utilization of 3D information created at the design stage, by offering an augmented reality technology at the maintenance stage. The method could also improve the efficiency of visual inspection on construction structures by augmenting 3D model of a bridge structure.

Reengineering Daily Reporting Process by Using Task Generator and Mobile Technology (작업생성기와 모바일 기술을 이용한 작업일보 프로세스 리엔지니어링)

  • Kang Woo-Young;Chin Sangyoon;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.100-110
    • /
    • 2005
  • As construction projects are getting more complex and larger in size, the amount of information is increased exponentially, which requires information management systems to accumulate as-built information throughout the project life-cycle. Particularly, a daily report system is very important, since it helps them keep track of various as-built information at the most detailed level. However, there have been many problems with daily reporting since its process is time-consuming and contains a lot of redundancies and ambiguities. Therefore, the objective of this research is to improve a process of collecting as-built information and managing daily report. To do so, this research developed a to-be process model and a daily report system. The daily report system developed in this research consists of interactive task generator and daily report management modules. The system has been successfully implemented in a real world construction project. The system development processes including process analysis, information models and system features are described along with discussions on the results and improvements.

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

A Study on the Test and Evaluation Process Development for Korea Next Generation Highspeed Electric Multiple Unit (차세대 고속열차 시험평가 프로세스에 관한 연구)

  • Lee, Tae-Hyung;Kim, Sang-Soo;Kim, Seog-Won;Kim, Ki-Hwan;Chung, Heung-Chai
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.7-11
    • /
    • 2011
  • A high-speed railway system represents a typical example of large-scale multi-disciplinary system, consisting of subsystems such as rolling-stock, electrical hardware, electronics, control, information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. Systems engineering technology development project for Korea next generation High-speed Electric Multiple Unit (HEMU) system in progress is a national large system development project that is not only a large-size and complex but also multi-disciplinary in nature. Therefore, all stakeholders must understand and share the functional and performance requirements of HEMU throughout its life-cycle phases. Also in the test and evaluation phase, all systems requirements must be verified. In 2011, the prototype train manufacturing will be completed. It will do test run on the commercial line and all systems requirements are verified until 2012. For the system verification, the test and evaluation process have to be established before the test trial run. Using a systems engineering tool, the system design database(SDD) with requirements traceability and development process management in the course of the development have to be established. This paper represents the test and evaluation process development based on the SEMP(Systems Engineering Management Plan) developed in the design stage. The test and evaluation process is refined and updated in comparison to the design stage one. The test and evaluation process consists of procedure, test and evaluation method and schedule. So through this process, it is defined that each systems requirements is verified on which test and about what time.

An Study about The Priority Risk Factors for Enhancing the success Rate of The Public Sector Information Projects (공공분야 정보화 프로젝트 성공률을 높이기 위한 위험요인 우선순위에 관한 연구)

  • Lee, Hyun-Soo;Lee, Moon-Goo;Lee, Nam-Yong
    • 전자공학회논문지 IE
    • /
    • v.48 no.4
    • /
    • pp.69-77
    • /
    • 2011
  • Recently, the public sector information projects have bebn larger in size, sophisticated, and diversified, which make the performance management model be studied continuously. According to the research and understanding on this, there are discontents resulted from poor requirements managements, schedule delays, budget overruns, failure to achieve expected goals, although there are increase the scale of projects and the number of information systems than ever before. it makes the requirement for the plan to manage significant risk factors systematically. So in this study, we will understand the risks which have been recognized by professionals and managers in public sector projects for enhancing the success rate. And the surveys will be conducted for the risk factors in each fields by gathering the opinions of the hands on workers in public sector project support team such as S company, L company. Finally, the correlation index between the risks and the other project fields would be clear by this survey.

The development direction and Analysis on Graphic authoring tool according to Design work frame -Focused on Interface design- (디자인 업무 유형에 따른 그래픽 저작도구의 사용 현황과 발전 방향 -인터페이스 디자인 분야를 중심으로-)

  • Jung, Da-young;Kim, Seung-In
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.11
    • /
    • pp.233-240
    • /
    • 2017
  • In recent years, graphics authoring tools have evolved into a variety of formats in line with the rapidly changing digital design field. However, in the field of interface design, screen shape and size depending on the user's environment, it needs more flexible and scalable authoring tools. Along with the emergence of variety of new tools, work processes are also changing. This study investigates what kinds of graphic authoring tools are currently used by designers and compared the result to the case of overseas and examined the difference in the environment of graphic authoring tool. This study looked at criteria and satisfaction of designers choosing authoring tools and how the choice depends on the type of company we are working in and the type of project we are involved in. Research shows that the choice of authoring tools depends on the type and efficiency of the project. Based on this, a reference is provided to establish the standard and working environment for designers and companies to select graphic authoring tools and propose the future direction of graphic authoring tool environments.

A Case Study on Construction of Front-Jacking method in Daejeon E.W. perforate Road Project (대전 동서관통도로 Front-Jacking공법 시공사례)

  • Kim Yong-Il;Hwang Nak-Yeon;Cha Jong-Whi;Jang Sung-Wook;Lee Nai-Yong
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.646-654
    • /
    • 2005
  • The crossing construction under railroad have two methods which are cut and cover and trenchless method. First, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of soil. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.

  • PDF

A Study on The Process of Land-dividing of Urban-Hanok Area in 11 Gahoe-dong, Seoul (서울 가회동11번지 도시한옥주거지의 필지형성과정 연구)

  • Song, Inho;Jung, Kee Hwang
    • Journal of architectural history
    • /
    • v.23 no.5
    • /
    • pp.47-60
    • /
    • 2014
  • Urban-Hanok emerged as a result of urbanization of Hanok in the modern period. In particular, Urban-Hanok has been mass-produced from the early 1920s, when the population is concentrated in cities, until the middle. Large-scale development by the professional developer has been developed in large-scale land rather than individual client because housing shortage was serious problem. 11 Gahoe-dong was made in 1935-36 is representative Urban-hanok area of Bukchon. It was formed through division of large-scale Land in 1930's. In the 1930's, the large-scale development projects of Urban-Hanok was triggered by the two events. One is Land Investigation Project performed by the Japanese government to capitalization of property, another is the pro-japanese bought the large scale-land in Gahoe-dong at bargain price from The Japanese government. Each lot has still a topographical characteristics such as land-dividing quality, the way of development, characteristic quality of urban-tissue. 11 Gahoe-dong, Urban-hanok area was developed two ways. First, development have been adapted to the topography. The lots have reflected topographical conditions such as land cutting area, a retaining wall, land-diving was maintaining the original topography almost. Second, it was street oriented development. The lots have developed sequentially along the street. So, the lots's shape and size is different each. For this reason, this area distribute various type of Hanok.

Evaluation of selection program by assessing the genetic diversity and inbreeding effects on Nellore sheep growth through pedigree analysis

  • Illa, Satish Kumar;Gollamoori, Gangaraju;Nath, Sapna
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.33 no.9
    • /
    • pp.1369-1377
    • /
    • 2020
  • Objective: The main objectives of the present study were to assess the genetic diversity, population structure and to appraise the efficiency of ongoing selective breeding program in the closed nucleus herd of Nellore sheep through pedigree analysis. Methods: Information utilized in the study was collected from the pedigree records of Livestock Research Station, Palamaner during the period from 1989 to 2016. Genealogical parameters like generation interval, pedigree completeness, inbreeding level, average relatedness among the animals and genetic conservation index were estimated based on gene origin probabilities. Lambs born during 2012 and 2016 were considered as reference population. Two animal models either with the use of Fi or ΔFi as linear co-variables were evaluated to know the effects of inbreeding on the growth traits of Nellore sheep. Results: Average generation interval and realized effective population size for the reference cohort were estimated as 3.38±0.10 and 91.56±1.58, respectively and the average inbreeding coefficient for reference population was 3.32%. Similarly, the effective number of founders, ancestors and founder genome equivalent of the reference population were observed as 47, 37, and 22.48, respectively. Fifty per cent of the genetic variability was explained by 14 influential ancestors in the reference cohort. The ratio fe/fa obtained in the study was 1.21, which is an indicator of bottlenecks in the population. The number of equivalent generations obtained in the study was 4.23 and this estimate suggested the fair depth of the pedigree. Conclusion: Study suggested that the population had decent levels of genetic diversity and a non-significant influence of inbreeding coefficient on growth traits of Nellore lambs. However, small portion of genetic diversity was lost due to a disproportionate contribution of founders and bottlenecks. Hence, breeding strategies which improve the genetic gain, widens the selection process and with optimum levels of inbreeding are recommended for the herd.