Abstract
As construction projects are getting more complex and larger in size, the amount of information is increased exponentially, which requires information management systems to accumulate as-built information throughout the project life-cycle. Particularly, a daily report system is very important, since it helps them keep track of various as-built information at the most detailed level. However, there have been many problems with daily reporting since its process is time-consuming and contains a lot of redundancies and ambiguities. Therefore, the objective of this research is to improve a process of collecting as-built information and managing daily report. To do so, this research developed a to-be process model and a daily report system. The daily report system developed in this research consists of interactive task generator and daily report management modules. The system has been successfully implemented in a real world construction project. The system development processes including process analysis, information models and system features are described along with discussions on the results and improvements.
건설 프로젝트가 더욱 복잡해지고 대형화함에 따라 정보의 양이 기하급수적으로 증가하고 있는데, 이로 인하여 프로젝트 생애주기간 실적정보를 관리하기 위한 정보 시스템이 필요하다. 특히, 작업일보 시스템은 가장 세부적인 수준에서 다양한 실적정보를 추적 관리할 수 있다는 점에서 매우 중요하다. 그러나 작업 일보 시스템의 프로세스가 시간이 많이 걸리며, 중복업무가 많고, 수집되는 정보표현의 모호성 등으로 인하여 많은 한계를 가지고 있었다. 따라서 본 연구에서는 실적정보를 수집하고 작업일보를 관리하는 프로세스를 향상시키는 것을 목적으로 To-Be 프로세스 모델을 구축하고 이를 검증하기 위해 작업일보 시스템을 개발하였다. 개발된 시스템은 interactive task generator와 작업일보관리 module로 구성되어있으며, 실제 건설프로젝트에서 성공적으로 시험되었다. 이 논문에서는 프로세스 분석, 정보모델 구축, 시스템 특징 등을 포함한 시스템 개발과정이 기술되어 있으며 연구결과와 개선효과도 논의되었다.