• Title/Summary/Keyword: Project Size

Search Result 931, Processing Time 0.031 seconds

Support Project for the Establishment of a Smart Factory for the Win-win between Large and Small Businesses Performance Analysis of the Adopting Company (대·중소 상생형 스마트공장 구축 지원 사업 도입기업에 대한 성과분석)

  • Seo, Hongeil;Kim, Taesung
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.2
    • /
    • pp.135-142
    • /
    • 2022
  • The smart factory is an important system that can reduce defects, maximize productivity, and respond to customer needs, from the labor-intensive era of traditional small and medium-sized manufacturing companies through the automation era to CPS using ICT. However, small and medium-sized manufacturers often fall short of the basic stage due to economic and environmental constraints, and there are many companies that do not even recognize the concept of a smart factory. In this situation, to expand the smart factory of small and medium-sized enterprises, the project to support the establishment of a smart factory for the win-win between large and small enterprises. The win-win smart factory construction support project provides a customized differentiation program support project according to the size and level of the company for all domestic manufacturing SMEs regardless of whether or not they are dealing with Samsung. In this study, we analyze the construction status and introduction performance of companies participating in the win-win smart factory support project to find out whether they have been helpful in management and to find efficient ways to improve support policies, and to suggest the direction of continuous support projects to improve the manufacturing competitiveness of SMEs in the future.

Study of Construction Costs in South and North Korea: Focusing on Construction Cost in Ryomyong Street Project, Pyongyang (남북 건축공사비 연구: 평양 려명거리 사업 건설조립액을 중심으로)

  • Kim, Jang-Han
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.371-378
    • /
    • 2022
  • The Ryomyong Street project is the only construction project for which the construction cost is known, but its scale cannot be estimated because it is marked in North Korean Won. In this paper, the construction cost per m2 of North Korean apartment building construction was calculated based on the construction and assembly amount of the Ryomyong Street project. 160 to 1 was calculated as the ratio of the building construction cost per m2 between South and North Korea based on the Ryomyong Street project in Pyongyang and Seoul Housing & Communities Corporation. This ratio can be used to assume the construction size presented in North Korean won as there is no official exchange rate between the two Koreas.

A Study on the Reliability of Peer-evaluation for Team Members' Contributions and Incorporating Method into Grades - Focusing on the Capstone Design - (팀원 기여도에 대한 동료평가의 신뢰성과 성적 반영 방법에 대한 연구 -종합설계교과목을 중심으로-)

  • Chang, Hyunjae
    • Journal of Engineering Education Research
    • /
    • v.27 no.1
    • /
    • pp.63-70
    • /
    • 2024
  • The capstone design classes in the College of Engineering are often team project-oriented, and teamwork skills are reported to positively impact problem-solving abilities. While team project courses have various advantages, they also come with challenges such as social loafing and issues related to free riders, which consistently hinder the positive effects of team project courses. To prevent these issues, there is a need to provide a clear evaluation-reward system for team members' contributions. In this study, we examined the reliability of peer evaluation scores for team members' contributions and reviewed methods to incorporate them into team project grades. The review results indicated that peer evaluation scores are deemed to have considerable reliability from a qualitative perspective. However, due to the relatively small team size in team project courses (3 to 6 members per team), using the arithmetic mean of peer evaluation scores is statistically challenging. As a complementary approach, this study proposes limiting the reflection ratio of peer evaluation scores and applying a more macroscopic processing method, not the arithmetic mean, to incorporate peer evaluation scores for team contributions into grades.

Construction for the Design Project Management System(DPMS) (디자인 프로젝트 관리 시스템(DPMS)의 구성)

  • 우흥룡
    • Archives of design research
    • /
    • v.12 no.3
    • /
    • pp.227-234
    • /
    • 1999
  • We paid attention to the fact that a project will always tend to increase in size even if its scope is narrowing. The complexities and multidisciplinary aspects of projects require that the many parts should be put together so that the prime objectives- performance, time, and cost- are met. These aspects lead to the use of teams to solve problems that used to be solved by individuals. Firstly, We surveyed the design companies and their clients on the design projects, and categorized the design task into 5 phases, that are marketing, planning, idea development, presentation, and follow-up. Among the phases, the presentation has the most difficult task, longest processing time, and highest cost, whereas idea development phase has relatively low cost, longer processing time, and more difficult task. Most of the companies used to be faced several bottlenecks on their design projects - time control, budget control, and resource control. Secondly, for improving the project managing process, we adopted that dividing and analyzing the sub critical paths may help in the effective managing.(Badiru, Adedeji B., 1995) Some critical paths require almost as much attention as the critical path since they have a high potential of becoming critical when changes occur in the network. Therefrom we suggest the Total task weight(Gt) as a management formula for the design project management.${Gt=\mathrm{T}\ast\leftthreetimes\ast1/100}$<\TEX> ( Gt = Total task weight, mathrm{T} = Task Weight, \leftthreetimes= Criticality ) Thirdly, In order to support to managing for the design projects, we set up an application system, which is graphically planning and implementing a complex undertaking. It is helpful to make the control of a project easy. The DPMS(Design Project Management System), which has two sub system. One is Project Screening System(PSS), and another Project Managing System(PMS). In PMS, we divided the design project into three modules; Project Planning, Project Implementation, and Project Evaluation. As a result, the DPMS will contribute to supply the control of a project easily and effectively. Also teams are used for making decisions and taking action with the DPMS. But we need to get further studies on the relationships between the whole project and its tasks.

  • PDF

Comparing the Inflow Rate of Sewage Treatment Plants Invested by the Public Funds or Public-Private Partnership (PPP) Projects (재정사업과 민간투자사업의 하수처리장 하수유입률 특성분석)

  • Lee, Wonseok;Cho, Eunju;Son, Younggyu;Khim, Jeehyeong
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.778-784
    • /
    • 2009
  • The purpose of this study is to figure out the differences of the inflow rates of Sewage Treatment Plants (STP), invested by public fund or public-private partnership (PPP). This paper finds that the average ratio of sewage inflow according to facility capacities (medium and small scale STP) was either nearly below 30% or above 100% in the first year. As the size of STP increased, there was decrease in the accuracy of demand assumption. This was because the operation time when the ratio of sewage inflow was uniform was different according to the size of STP, whereby the time was short when the STP were small. The design average ratio of sewage inflow was 10% larger than the real average ratio; this was considered overdesigned. In the case of a plant built by the PPP scheme, the average ratio of inflow of the STP before an abolition of MRG was larger than after the abolition of MRG. This may be explained by moral hazard from too much reliance on MRG. After the abolition of MRG, the demand risk of PPP was shifted from a PPP project to a conventional project.

Effect of Prenatal Dexamethasone on Sex-specific Changes in Embryonic and Placental Growth

  • Yun, Hyo Jung;Lee, Ji-Yeon;Kim, Jongsoo;Kim, Myoung Hee
    • Biomedical Science Letters
    • /
    • v.20 no.1
    • /
    • pp.43-47
    • /
    • 2014
  • To understand the effect of prenatal stress on sex-specific changes in embryonic and placental growth, a synthetic glucocorticoid (dexamethasone) was administered intraperitoneally at a dosage of 1 mg/kg body weight (BW) (Dex1) or 10 mg/kg BW (Dex10) to pregnant ICR mice at the gestational days 7.5, 8.5 and 9.5 post coitum (p.c.). Embryos and placentas were then harvested at days 11.5 and 18.5 p.c., and their body weight and size were measured following the determination of sex through PCR using Sry specific primers in tail tissues. As a result, female embryos presented reduced fetal body weight and size in Dex1- and Dex10-treated groups than those of control group at the embryonic day 11.5 p.c. Interestingly, the growth seems to be recovered at day 18.5 as there was no difference in growth between control and dexamethasone treated groups. In the case of males, Dex1 induced a decrease in fetal weight in day 11.5 and this pattern was maintained until day 18.5, whereas their growth was not affected by Dex10 treatment. Placental growth showed similar patterns to fetal growth in both sexes but the extent of reduction was not statistically significant in most cases. Placental weights in Dex1- and Dex10-treated group were decreased significantly in male only. The results imply that the effect of prenatal stress is largely sex dependent due to different strategies for growth and survival in a stressful environment.

Application of BIM-based PMIS Considering Construction Life-Cycle (건설 생애주기를 고려한 BIM 기반의 PMIS 활용)

  • Moon, Sung-Woo;Kwon, Ki-Nam;Kim, Sang-Do;Jung, Joon-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.654-657
    • /
    • 2008
  • Recently, construction projects have become bigger and complicated and the construction business scale has enlarged. Therefore a project cost size is increasing. The historical data can be easily saved by advanced technologies of IT industries. Utilizing those make us to be able to manage construction project more effectively. These days, PMIS (Project Management Information System) has supplied widely at construction companies for integrating cooperation system of Web environment. and it is being used. However the most PMIS is limited at construction phase. Actually it isn't applied to a construction project Life-Cycle(planning, design, construction and maintenance). To control manage a construction project Life-Cycle effectively, BPMS (BIM-based PMIS Modeling) should be considered. This paper suggests the ways for applying BPMS.

  • PDF

Review of International Research Cooperation Results for Intercomparison of Luminescence Dating (루미네선스 연대측정 상호비교를 위한 국제공동연구 결과 고찰)

  • Jin Cheul Kim
    • The Korean Journal of Quaternary Research
    • /
    • v.34 no.1
    • /
    • pp.31-40
    • /
    • 2024
  • The Risø Research Institute in Denmark conducted the luminescence dating intercomparison project, which derives equivalent dose, annual dose, and absolute age results for each laboratory from the same sample, and compares the results between laboratories. This project was carried out from 2006 to 2012. In this project, 30 international laboratories worldwide participated, including the luminescence laboratory at the Korea Institute of Geoscience and Mineral Resources (KIGAM). As a result of the project's synthesis, the average value of the results generally shows an over-dispersion value between laboratories of about 13%. The equivalent dose value obtained through the provided quartz analyzed in KIGAM shows results almost identical to the final equivalent dose value of the project. On the other hand, the equivalent dose value obtained from self-extracted quartz analyzed in KIGAM shows a difference of about 0.9 Gy from the final result of the project, which is thought to be due to the difference in particle size of the separated quartz. This international joint research project is the first large-scale international joint study related to luminescence dating and is expected to have contributed to the reliability and use of luminescence dating internationally.

Alternatives Development for Basin-wide Flood Mitigation Planning: A Case Study of Yeongsan River Basin (유역치수계획을 위한 대안수립: 영산강 유역의 사례연구)

  • Yi, Choong-Sung;Shim, Myung-Pil;Lee, Sang-Won
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.6
    • /
    • pp.507-516
    • /
    • 2010
  • The purpose of this study is to propose the alternative development method by means of determining the optimal project size from the economic viewpoint, improving the existing method depending on engineering aspects. To this end, this study defined the flood mitigation projects as the production activities carried out by inputs and outputs, and proposed the alternative development method on the basis of optimizing input and output combinations. This paper, as the case study of the proposed method, developed alternatives for the flood mitigation planning of Youngsan River Basin by determining the optimal project scale. As the result of determining optimal project size, the net benefit of the optimal alternative tended to be dependent on the net benefits of the large individual proposals. Due to such problem, the effect of relatively small individual proposals are underestimated and possibly be excluded from the optimal alternative, which may result in exclusion of the potential damaged regions protected by them from the flood mitigation project. Thus for the selective flood protection by region, individual proposals need to be categorized into the global measures and local measures according to the flood protection area.

Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.