A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

Development of Measurement and Evaluation Process for Risk-based Configuration Factors in Mixed Used Development in Urban Regeneration Projects (복합용도 도시재생사업에서의 리스크 기반 변화요인 측정 및 평가 프로세스 개발)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.94-106
    • /
    • 2012
  • In recent years, the risks and uncertainties associated with mixed used development in urban regeneration projects which have actively been implemented at home and abroad have been on the rise due to the uncertainties of the initial business plan, difficulty of financing, increase in total cost and schedule delay. To cope with rapid social and economic changes and optimize benefits, a risk-based configuration management process that considers life cycle is required, along with accurate planning in the early stage of the business. In addition, it is necessary to prepare measures that can respond to the evaluation and measurement of the configuration factors in relation to the business process. However, the focus of previous studies on configuration management in the field of construction was mainly on humanities and the sociological aspects such as organization, leadership, ideology and similar concepts. There has been limited research on the process and measurement and evaluation methods for configuration factors required in decision-making on the risks and changes that can occur in the actual project implementation phase. Accordingly, in this study, we defined risk-based configuration factors and developed a process and MECA/3DAM/CII methodology to measure and evaluate these factors so as to carry out systematic configuration management of mixed used development in urban regeneration projects.

Construction Waste Management System for Improving Waste Treatment on the Construction Site (건축현장의 환경관리 업무 효율성 향상을 위한 폐기물 관리 시스템 - 공동주택을 중심으로 -)

  • Cha, Namwoo;Park, Wansu;Kim, Kyungrai;Cha, Heesung;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.83-91
    • /
    • 2014
  • The problems of environmental pollutions and resources depletion have been growing issues in global construction recently. Efforts to reduce $CO_2$ emission have been also made in all sectors of construction industry these days. As one of the biggest industries that consume a huge amount of resources and generate complex construction wastes, the construction industry has significant impacts on environment issues. However, systematic approach to manage wastes has been rarely made, and most construction wastes from construction sites are being land-filled or incinerated. In this study, a system is proposed to predict the amount of wastes in visual formats, and to control the process of wastes management. The system's main functions include : (1) to estimate the amount of wastes to be generated in project schedule, (2) to categorize the types of wastes, (3) to determine the timing of taking out wastes from sites, and (4) to share information regarding wastes for recycling. A huge amount of wastes are generated in construction process, but most of the wastes have been discharged in forms of mixed wastes, which make them hardly reused. The system not only provide information on wastes to be generated, but also prevent mixing various wastes by classifying them by types and schedules. This features of the system, along with functions to share wastes information with other agencies outside the site, are expected to enhance the level of wastes recycling to a great extent. By saving construction materials through wastes recycling, the system also contributes in reducing $CO_2$ emission.

A Study on Utilizing BIM Level of Architectural Design Information for School Facilities (BIM을 활용한 학교시설 설계정보단계 설정에 관한 연구)

  • Kim, Myoung-Keun;Koh, In-Lyong;Kim, Hyung-Un
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.4
    • /
    • pp.13-20
    • /
    • 2012
  • The recent advances in digital technology allow the use of BIM for integratively managing various information pertaining to an architectural structure. This can be the suitable tool for effectively utilizing the various requests of both the users and the administrators from the planning phase. In particular, planning and constructing a school facility can be challenging because it is an important learning facility where the students are required follow a set schedule. Accommodating to the various needs and requests of the users and the other related parties in the progress can be very difficult. Therefore, in order to use the BIM with the basis of data to manage the lifetime of the school facility, it is necessary to develop the specialized BIM process customized to the school facilities. Using this as the base, the BIM process specifically for school facilities should be phased in, applied, and expanded. The objective of this study is to define the scope of application and to plan for the efficient utilization of the BIM process specialized for school facilities, when conducting the project from planning phase to design development phase through the series of processes. Unlike the presently used enhancement of the visible minute details of the models, the methods to enhance the quality of information contained inside the model will be proposed. Also, the user will participate in the school facility construction. The realistic BIM application is aimed through the research for the processes for building models that will be utilized for construction and management.

Development of Estimation Model of Construction Activity Duration Using Neural Network Theory (건설공사 공정별 작업기간 산정을 위한 신경망 기반 모형 구축)

  • Cho, Bit-Na;Kim, Hyeon-Seung;Kang, Leen-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.5
    • /
    • pp.3477-3483
    • /
    • 2015
  • A reasonable process for the activity duration estimation is required for the successful construction management because it directly affects the entire construction duration and budget. However, the activity duration is being generally estimated by the experience of the construction manager. This study suggests an estimation model of construction activity duration using neural network theory. This model estimates the activity duration by considering both the quantitative and qualitative elements, and the model is verified by a case study. Because the suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project.

Advanced CBS (Cost Breakdown Structure) Code Search Technology Applying NLP (Natural Language Processing) of Artificial Intelligence (인공지능 자연어 처리 기법을 이용한 개선된 내역코드 탐색방법)

  • Kim, HanDo;Nam, JeongYong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.5
    • /
    • pp.719-731
    • /
    • 2024
  • For efficient construction management, linking BIM with schedule and cost is essential, but there are limits to the application of 5D BIM due to the difficulty in disassembling thousands of WBS and CBS. To solve this problem, a standardized WBS-CBS set is configured in advance, and when a new construction project occurs, the CBS in the BOQ is automatically linked to the WBS when a text most similar to it is found among the standard CBS (Public Procurement Service standard construction code) of the already linked set. A method was used to compare the text similarity of CBS more efficiently using artificial intelligence natural language processing techniques. Firstly, we created a civil term dictionary (CTD) that organized the words used in civil projects and assigned numerical values, tokenized the text of all CBS into words defined in the dictionary, converted them into TF-IDF vectors, and determined them by cosine similarity. Additionally, the search success rate increased to nearly 70 % by considering CBS' hierarchical structure and changing keywords. The threshold value for judging similarity was 0.62 (1: perfect match, 0: no match).

Development of Metric-Based Two-Tier Work Force Strategy (성과극대화를 위한 기능인력의 육성 및 활용전략)

  • Chang Soon-Woong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-81
    • /
    • 2003
  • The construction industry has been experiencing a major challenge in its work force, 'the shortage of skilled craft workers.' This problem has been caused by several factors such as the poor image of the construction industry, lack of training and education, unclear career path, declining wages, and changing work force demographics. A 'step-change' approach called the 'Two-Tier Work Force Strategy' has been proposed by the Center for Construction Industry Studies (CCIS) to deal with the work force related issues in a radical way. It is composed of two separate strategies, Tier I and II. The Tier I strategy uses less skilled and task trained craft workers, and has a larger administrative site management team than the Tier II strategy. The Tier II strategy utilizes fewer, better-educated, and higher skilled workers who perform some lower-management functions in addition to craft functions. They are paid more, but produce more through higher skills, stay on the job longer through multi-skilling, and deliver improved project performance in safety, quality, schedule, and cost The Two-Tier Work Force Strategy has the potential to resolve the current work force problems and foster a better work force environment in the future.

  • PDF

A Case Study on Documentation Strategy Applying the Institutional Functional Analysis Methodology (기관기능분석 방법론을 적용한 기록화 전략 사례 연구 미국 의회 기록화 프로젝트를 중심으로)

  • Kim, Jang-hwan
    • The Korean Journal of Archival Studies
    • /
    • no.44
    • /
    • pp.5-49
    • /
    • 2015
  • Although a study on documentation strategy has been steadily releasing recently in the archival study field, it is rare that the cases or studies applying the institutional functional analysis methodology that Helen Samuels had suggested. The institutional functional analysis is a methodology to provide a comprehensive understanding of the record by defining the essential features of the institution at a macro level. The documentation area derived from the institutional functional analysis functions as a priori framework for an archivist to select and keep the records of the institution. In other words, by analyzing the function of the institution through the institutional functional analysis methodology, it makes possible to identify the functions not covered under the current records retention schedule at a macro level ensuring accountability of the organization's business activities. The documentation project of the United States is a prime example to comply with this background. In this study, by analyzing the case of the United States Congress, it is proposed the derived implications for applying the institutional functional analysis to the National Assembly of the Republic of Korea, where is the similar national institution to the U.S. Congress. For this purpose, firstly, the theoretical debate on the institutional functional analysis as the previous studies. Secondly, the documentation project of the United States Congress has been case analyzed by each function according to the institutional functional analysis. Thirdly, on the basis of the case study results, the implications are derived and it is suggested that the documentation areas applicable to the National Assembly of the Republic of Korea.

Performance of Drip Irrigation System in Banana Cultuivation - Data Envelopment Analysis Approach

  • Kumar, K. Nirmal Ravi;Kumar, M. Suresh
    • Agribusiness and Information Management
    • /
    • v.8 no.1
    • /
    • pp.17-26
    • /
    • 2016
  • India is largest producer of banana in the world producing 29.72 million tonnes from an area of 0.803 million ha with a productivity of 35.7 MT ha-1 and accounted for 15.48 and 27.01 per cent of the world's area and production respectively (www.nhb.gov.in). In India, Tamil Nadu leads other states both in terms of area and production followed by Maharashtra, Gujarat and Andhra Pradesh. In Rayalaseema region of Andhra Pradesh, Kurnool district had special reputation in the cultivation of banana in an area of 5765 hectares with an annual production of 2.01 lakh tonnes in the year 2012-13 and hence, it was purposively chosen for the study. On $23^{rd}$ November 2003, the Government of Andhra Pradesh has commenced a comprehensive project called 'Andhra Pradesh Micro Irrigation Project (APMIP)', first of its kind in the world so as to promote water use efficiency. APMIP is offering 100 per cent of subsidy in case of SC, ST and 90 per cent in case of other categories of farmers up to 5.0 acres of land. In case of acreage between 5-10 acres, 70 per cent subsidy and acreage above 10, 50 per cent of subsidy is given to the farmer beneficiaries. The sampling frame consists of Kurnool district, two mandals, four villages and 180 sample farmers comprising of 60 farmers each from Marginal (<1ha), Small (1-2ha) and Other (>2ha) categories. A well structured pre-tested schedule was employed to collect the requisite information pertaining to the performance of drip irrigation among the sample farmers and Data Envelopment Analysis (DEA) model was employed to analyze the performance of drip irrigation in banana farms. The performance of drip irrigation was assessed based on the parameters like: Land Development Works (LDW), Fertigation costs (FC), Volume of water supplied (VWS), Annual maintenance costs of drip irrigation (AMC), Economic Status of the farmer (ES), Crop Productivity (CP) etc. The first four parameters are considered as inputs and last two as outputs for DEA modelling purposes. The findings revealed that, the number of farms operating at CRS are more in number in other farms (46.66%) followed by marginal (45%) and small farms (28.33%). Similarly, regarding the number of farmers operating at VRS, the other farms are again more in number with 61.66 per cent followed by marginal (53.33%) and small farms (35%). With reference to scale efficiency, marginal farms dominate the scenario with 57 per cent followed by others (55%) and small farms (50%). At pooled level, 26.11 per cent of the farms are being operated at CRS with an average technical efficiency score of 0.6138 i.e., 47 out of 180 farms. Nearly 40 per cent of the farmers at pooled level are being operated at VRS with an average technical efficiency score of 0.7241. As regards to scale efficiency, nearly 52 per cent of the farmers (94 out of 180 farmers) at pooled level, either performed at the optimum scale or were close to the optimum scale (farms having scale efficiency values equal to or more than 0.90). Majority of the farms (39.44%) are operating at IRS and only 29 per cent of the farmers are operating at DRS. This signifies that, more resources should be provided to these farms operating at IRS and the same should be decreased towards the farms operating at DRS. Nearly 32 per cent of the farms are operating at CRS indicating efficient utilization of resources. Log linear regression model was used to analyze the major determinants of input use efficiency in banana farms. The input variables considered under DEA model were again considered as influential factors for the CRS obtained for the three categories of farmers. Volume of water supplied ($X_1$) and fertigation cost ($X_2$) are the major determinants of banana farms across all the farmer categories and even at pooled level. In view of their positive influence on the CRS, it is essential to strengthen modern irrigation infrastructure like drip irrigation and offer more fertilizer subsidies to the farmer to enhance the crop production on cost-effective basis in Kurnool district of Andhra Pradesh, India. This study further suggests that, the present era of Information Technology will help the irrigation management in the context of generating new techniques, extension, adoption and information. It will also guide the farmers in irrigation scheduling and quantifying the irrigation water requirements in accordance with the water availability in a particular season. So, it is high time for the Government of India to pay adequate attention towards the applications of 'Information and Communication Technology (ICT) and its applications in irrigation water management' for facilitating the deployment of Decision Supports Systems (DSSs) at various levels of planning and management of water resources in the country.

Towards a Transportation Support System for Off-site Construction : Identifying Key Functions and Diagramming Functional Blocks (오프사이트건설(Off-site Construction) 운반 시스템을 위한 핵심기능 도출 및 시스템 기능 전개도 개발)

  • Lee, Gangho;Kim, Minguk;Lee, Chansik;Koo, Choongwan;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.21-30
    • /
    • 2021
  • The existing construction industry is classified into industries with low productivity compared to other industries. In order to solve the decline in productivity in the construction industry, the world is focusing on off-site construction (OSC), which is about 40% more productive than existing construction methods. This high productivity is possible because the three stages of production, transport to the site, and site assembly are consistently maintained in a continuous flow. This study conducted a functional survey through literature review, preliminary field survey, questionnaire, and expert interview. The surveyed function were classified into five categories: convenience, flexibility, manageability, communication, and safety, and the functional characteristics of flexibility, manageability, and communication were high. Because of the change according to the construction progress, the production schedule of the factory, and the variety of transportation time required. Finally, A functional block diagram was developed based on the 15 functions corresponding with an average score of 4 or more in the surveyed function score result. If the OSC transport system is established through this study, It can contribute to a successful construction OSC project and increase productivity.