• Title/Summary/Keyword: Project Plan

Search Result 2,087, Processing Time 0.028 seconds

Public Park Project of School Facilities and Making Outdoor Space Based on the Consideration of Public Performance - Focused on Elementary School in Cheongju City - (공공성을 고려한 학교시설 공원화 사업과 외부 공간 조성 - 청주시 초등학교를 중심으로 -)

  • Kim, Seung-Geun;Sin, Ju-Seong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.17 no.4
    • /
    • pp.13-20
    • /
    • 2010
  • Schools have developed together with local communities, as leading public buildings that represent local communities. Most elementary schools are located in walking distance, so that makes it possible to maintain close relationships with local residents. This study examine outside space where the school buildings are restructured for new images through public park project. The results of this research as follows. 1st, Public park project of school facilities is charge of key role to improve urban image. 2nd, Public park project of school facilities promote environmental, social and educational participation of school members. 3rd, We need to develop a outside space plan and to gather diverse opinions before we start on the Public park project of school facilities. 4th, It is important to maintain the space desirable through sharing of roles by members of schools and local communities. Public park project of school facilities has to be the center of participation, process, commune and practical use.

Design of Drilled Shafts Foundation by LRFD in Incheon Bridge Project (인천대교 민자구간의 대구경 현장타설 말뚝기초의 LRFD 설계 적용 사례)

  • Kim, Jeong-Hwan;Lee, Hyun-Gun;Shin, Hyun-Yang;Youn, Man-Geun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.551-561
    • /
    • 2006
  • Incheon bridge project is to construct total 12km long bridges on the sea consist of 800m span length cable stayed bridge, approach bridge and viaduct bridge based on LRFD design specification. To design pile foundations by RCD of each bridge unit, total 4 number of preliminary full scale pile load tests with Osterberg cell method were carried out on the piles for testing. The test load was planned to more than the expected design ultimate capacity and about 29,000tons maximum load was recorded. From the interpretation of test results, design parameters are evaluated and applied to the design. Preliminary pile load test plan and detailed execution of pile load tests are introduced and summarized. The resistance factors are presented for pile design of Incheon Bridge Project in LRFD considering variation of ground conditions and number of test piles.

  • PDF

A Small and Medium Enterprises Sized Project Performance Management System in Management Information System Environment (MIS 환경에서의 중소기업형 프로젝트 성과관리 시스템)

  • Kim, Seok-Hun;Jung, Jin-Young;Ahn, Woo-Young
    • Journal of Advanced Navigation Technology
    • /
    • v.13 no.6
    • /
    • pp.964-970
    • /
    • 2009
  • In this paper, according to the company's business objectives through the execution plan of project-specific progress and to achieve effective management of performance management in conjunction with a project management system can be developed. Goal-based Medium Enterprises Sized project performance management system eophyeong advancement of the strategic project management and corporate performance management for the systematic integration and implementation of an individual were to be applied. Organizations to perform a systematic strategy to manage the administration transparent, objective, you evaluate, say he reflects the integration and implementation of management systems between organizations and the unit responsible for the detailed performance indicators and grant to refine your business can benefit there is.

  • PDF

Disputes in Managing Projects: A Case Study of Construction Industry in Vietnam

  • VO, Khoa Dang;NGUYEN, Phong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.8
    • /
    • pp.635-644
    • /
    • 2020
  • The construction industry in developing countries like Vietnam, which incorporates small and medium construction enterprises, is typically more prone to disputes and contract dispute-related lawsuits. A dispute may occur at any time in the life cycle of the project. It is sometimes solved with the intermediation of a lawyer or directly by stakeholders. Understanding the causes of disputes in a construction project not only improves the efficiency of a company but also increases the success of projects. This study was carried out using a questionnaire survey at construction projects in Ho Chi Minh City. Sample data with 117 observations were analyzed to find the disputing factors in construction projects: diversity of working style among the parties; reluctance to work; and poor teamwork. Correlation coefficient on a rank of factors between design consultant and contractor; Design consultant and project owners are positively correlated. The Exploratory Factor Analysis (EFA) analysis identified six groups of factors in construction disputes: cooperation, technology, economics, productivity, information, and behavior. The findings are useful for enterprise practice and provide participants with an overview of sources of dispute. Thus, a more complete risk management plan can be formulated, which will accelerate project progress and improve the likelihood of success.

A Study Assessing 2018 Gyenggi-do Korean medicine Support Project for Subfertility (2018년도 경기도 한의 난임 지원 사업 진료 결과 분석 연구)

  • Choi, Su-Ji;Kim, Dong-Il;Park, Jang-Kyung;Lee, Mi-Young
    • The Journal of Korean Medicine
    • /
    • v.40 no.3
    • /
    • pp.76-86
    • /
    • 2019
  • Objectives: This study aims to assess the Gyenggi-do support project of Korean medical treatment in subfertility in 2018. And we would like to propose a plan to improve the project by analyzing the results of the project. Methods: We got the medical records of 260 participants that personal information was deleted by the association of Korean Medicine in Gyenggi-do. We collected the participants' characteristics, treatment records, results of treatment, laboratory results and satisfaction survey results. We coded the data and analyzed them using SPSS 23 at 5% significance level. Results: After the treatment, 11.0% of participants became pregnant spontaneously. There was no significant change in blood test before and after the treatment and observation period, and there was no adverse event during the project. After the project, the satisfaction survey was conducted. 84.2% of participants answered that they were satisfied with the result of the treatment. Conclusions: We analyzed the results of Gyenggi-do support project of Korean medical treatment for infertile women in 2017 and 2018. This study suggests the effectiveness and safety of Korean medical treatment for infertile women.

An Exploratory Study for the Development Plan of the National Defense Experiment Project Conducted by the Navy (해군에서 수행하는 국방 실험사업 발전방안을 위한 탐색적 연구)

  • Woo, Dongsung;Lee, Boram;Ryu, Jaehak;Kim, Dongho
    • Journal of Information Technology Services
    • /
    • v.20 no.6
    • /
    • pp.151-162
    • /
    • 2021
  • Since 2012, the Navy has been conducting a defense experiment project to evaluate the possibility of military application by introducing new technologies related to excellent private informatization in the defense field. There are many projects that have spread because they are suitable for military use, but some have ended as experimental projects themselves because they do not meet the military's required performance. Continuous development is required as increasing the spread rate by successfully carrying out defense experiment projects is the basis for defense reform. This study analyzed the performance of major projects carried out by the Navy and presented considerations for the development of defense experiment projects to be carried out by the Navy in the future. The main achievements were derived in various ways in terms of project performance and system operation, and the considerations can be summarized in the field of raising business requirements, securing resources for system operation, determining the size of companies for project execution, and security measures. The research results can be used as data to determine the required defense experiment project and efficiently carry out the project.

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

Improvement of Concessionaire Designation Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 선정 평가기준개선에 관한 연구)

  • Shin, Hyun-In;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.121-131
    • /
    • 2006
  • Since "Act on Private Participation in Infrastructure" were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation In Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of concessionaire. However, score for cost is likely to influence designating concessionaire to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for designating concessionaire in BTL projects, and proposed improvement program by doing questionnaire over specialists of each field.

A study on the characteristics of the conflicts occurred in the rural area development business promotions - Focused on the awareness survey of the subjects participate in regional comprehensive development project - (농촌지역개발사업 추진과정의 갈등특성 연구 - 권역단위종합정비사업 참여 주체 인식조사를 중심으로 -)

  • Shin, Yong-Gyu;Cho, Joong-Hyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.1-12
    • /
    • 2018
  • This study aims to offer base line data for efficient conflicts control measures by first, analyzing the current situation of the regional comprehensive development project and second, identifying level, type and cause of the conflicts appeared during the development business promotion. For this purpose, theoretical side of this study establishes a basic frame by reviewing the existing researches in order to analyze the characteristics of the conflicts between the participation subjects in the development business, and the empirical side conducts survey and analysis on the awareness on these conflicts. As a result of the analysis, the survey revealed the followings. First, the respondents were aware of the overall promotions of the business quite positively, second, the conflicts were considered as a major obstacle against the development project promotion just as the other negative factors, third, majority of the responses on the seriousness of the conflicts were neutral which meant that the conflicts could be deepened by situations, fourth, most respondents had positive recognition on the needs of conflict control training and its effectiveness, and last but not least, most respondents of the survey revealed their intentions to take parts in trouble shooting from the conflicts. Based on the results above, we were able to extract several elements to consider preparing the countermeasures for the conflicts. First, specific plan should be arranged and institutionalized in order to control the conflicts between the residents at the initial stage of the development business or even before. Second, the specific plan must lower its threshold for easy participation of the residents in that region and make the residents main body of the conflict control. Third, enhanced conflict control education must be provided to the residents of the region where comprehensive development plan is in progress or being prepared.

A Study on the Problems and Improvement Plan of Cadastral Map Data Maintenance Project (지적·임야도 자료정비 사업의 문제점 및 개선방안 연구)

  • Baek, Kyu-Yeong;Choi, Yun-Soo
    • Journal of Cadastre & Land InformatiX
    • /
    • v.50 no.1
    • /
    • pp.63-73
    • /
    • 2020
  • The Ministry of Land, Infrastructure and Transport carried out a pilot project for data maintenance in 2011 to ensure the accuracy of cadastral records nationwide, and now trying to reduce the errors such as omission of the cadastral book, inconsistency of land category between cadastral account book and cadastral map, etc. and the boundary between the map boundary, scale, and administrative areas. In this study, we looked at the currents status and problems of the cadastral research, improving the cadastral map, which has been promoted by the government and the cadastral office. In order to revitalize the cadastral map data maintenance project, it is necessary to re-establish the plan for each step for challenging the limitation of current data maintenance, and the master plan for promotion system, and develop manuals to maintain consistency and secure accuracy of cadastral map maintenance, such as "Coverage and Maintenance Guidelines for Cadastral Maps", and secure the national budget for error correction in cadastral map led by government.