Design of Drilled Shafts Foundation by LRFD in Incheon Bridge Project

인천대교 민자구간의 대구경 현장타설 말뚝기초의 LRFD 설계 적용 사례

  • Kim, Jeong-Hwan (Incheon Bridge Project Design Team, Samsung Corporation.) ;
  • Lee, Hyun-Gun (Incheon Bridge Project Design Team, Samsung Corporation.) ;
  • Shin, Hyun-Yang (Incheon Bridge Project Design Team, Samsung Corporation.) ;
  • Youn, Man-Geun (Incheon Bridge Project, Samsung Corporation.)
  • 김정환 (삼성건설 인천대교 현장설계팀) ;
  • 이현근 (삼성건설 인천대교 현장설계팀) ;
  • 신현양 (삼성건설 인천대교 현장설계팀) ;
  • 윤만근 (삼성건설 인천대교)
  • Published : 2006.10.27

Abstract

Incheon bridge project is to construct total 12km long bridges on the sea consist of 800m span length cable stayed bridge, approach bridge and viaduct bridge based on LRFD design specification. To design pile foundations by RCD of each bridge unit, total 4 number of preliminary full scale pile load tests with Osterberg cell method were carried out on the piles for testing. The test load was planned to more than the expected design ultimate capacity and about 29,000tons maximum load was recorded. From the interpretation of test results, design parameters are evaluated and applied to the design. Preliminary pile load test plan and detailed execution of pile load tests are introduced and summarized. The resistance factors are presented for pile design of Incheon Bridge Project in LRFD considering variation of ground conditions and number of test piles.