• Title/Summary/Keyword: Project Owner

Search Result 284, Processing Time 0.028 seconds

Method of Quantity Data Analysis for Building Construction Cost Estimation : Focusing on Finish Work of Public Apartment Project (공사비 예측을 위한 수량기반 데이터 분석방법 : 공공 아파트 수장공사 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Seong, Ki-Hoon;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.235-243
    • /
    • 2008
  • Construction projects have unique characteristics that these may be carried out by contractors thus, cost should be estimated before execution. The importance of cost estimation and cost check has become increasingly emphasized in all phases of construction project that would be performed numerously. It is needed that owner have to estimate reasonable budget, and contractor should predict the bid price. However, there are lack of standard cost estimation method before quantity takeoff, cost analysis method, and cost database thus, the method of area cost, such as square foot method, is as used as ever in Korea. Therefore, this research suggested standard cost database structure CUBE, and analysis method of item quantity per one household categorized by area type. Whereafter, database of all item quantity of finish work has been built with 90 building cost data, and validated it's availability. In this respect, the suggested method and the findings from this research are expected to help enhancing the efficiency and productivity of cost estimation in Korea.

A Study on Improving the Efficiency of the Survival Rate for the Offshore Accommodation Barge Resident Using Fire Dynamic Simulation (화재시뮬레이션을 이용한 해양플랜트 전용생활부선 거주자의 생존율 향상에 대한 연구)

  • Kim, Won-Ouk;Lee, Chang-Hee
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.6
    • /
    • pp.689-695
    • /
    • 2015
  • The offshore plant crews that were commissioned in the commercial startup phase boarded the offshore plant in two shifts until the end of the project. The crews who were hired by the owner side stayed in the original offshore plant during the project. However, most of the offshore plant commissioned members who were dispatched from the shipyard were accommodated in the offshore accommodation barge. For this reason, they were exposed to many accidents since there are a lot of people staying in a small space. This study suggested a method for improving survival rate at offshore accommodation barge in terms of life safety. It is assumed that the fire accident among unfortunate events which take place in the offshore accommodation barge mainly occurred. So, this study analyzed the safety evacuation for offshore plant employees using fire simulation model based on both domestic and international law criteria. In particular, When fire occurs in the offshore accommodation barge, the periodically well trained crews are followed safety evacuation procedure. whereas many employees who have different background such as various occupations, cultural differences, races and nationality can be commissioned with improper evacuation behaviors. As a result, the risk will be greater than normal situation due to these inappropriate behaviors. Therefore, This study analyzed the Required Safe Escape Time (RSET) and Available Safe Escape Time (ASET). Also it was suggested the improvement of structure design and additional arrangement of safety equipment to improve the survival rate of the residents in offshore accommodation barge.

Development of a Model for Calculating the Construction Duration of Urban Residential Housing Based on Multiple Regression Analysis (다중 회귀분석 기반 도시형 생활주택의 공사기간 산정 모델 개발)

  • Kim, Jun-Sang;Kim, Young Suk
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.93-101
    • /
    • 2021
  • As the number of small households (1 to 2 persons per household) in Korea gradually increases, so does the importance of housing supply policies for small households. In response to the increase in small households, the government has been continuously supplying urban housing for these households. Since housing for small households is a sales and rental business similar to apartments and general business facilities, it is important for the building owner to calculate the project's estimated construction duration during the planning stage. Review of literature found a model for estimating the duration of construction of large-scale buildings but not for small-scale buildings such as urban housing for small households. Therefore this study aimed to develop and verify a model for estimating construction duration for urban housing at the planning stage based on multiple regression analysis. Independent variables inputted into the estimation model were building site area, building gross floor area, number of below ground floors, number of above ground floors, number of buildings, and location. The modified coefficient of determination (Ra2) of the model was 0.547. The developed model resulted in a Root Mean Square Error (RMSE) of 171.26 days and a Mean Absolute Percentage Error (MAPE) of 26.53%. The developed estimation model is expected to provide reliable construction duration calculations for small-scale urban residential buildings during the planning stage of a project.

The Application of Fuzzy Logic to Assess the Performance of Participants and Components of Building Information Modeling

  • Wang, Bohan;Yang, Jin;Tan, Adrian;Tan, Fabian Hadipriono;Parke, Michael
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.4
    • /
    • pp.1-24
    • /
    • 2018
  • In the last decade, the use of Building Information Modeling (BIM) as a new technology has been applied with traditional Computer-aided design implementations in an increasing number of architecture, engineering, and construction projects and applications. Its employment alongside construction management, can be a valuable tool in helping move these activities and projects forward in a more efficient and time-effective manner. The traditional stakeholders, i.e., Owner, A/E and the Contractor are involved in this BIM system that is used in almost every activity of construction projects, such as design, cost estimate and scheduling. This article extracts major features of the application of BIM from perspective of participating BIM components, along with the different phrases, and applies to them a logistic analysis using a fuzzy performance tree, quantifying these phrases to judge the effectiveness of the BIM techniques employed. That is to say, these fuzzy performance trees with fuzzy logic concepts can properly translate the linguistic rating into numeric expressions, and are thus employed in evaluating the influence of BIM applications as a mathematical process. The rotational fuzzy models are used to represent the membership functions of the performance values and their corresponding weights. Illustrations of the use of this fuzzy BIM performance tree are presented in the study for the uninitiated users. The results of these processes are an evaluation of BIM project performance as highly positive. The quantification of the performance ratings for the individual factors is a significant contributor to this assessment, capable of parsing vernacular language into numerical data for a more accurate and precise use in performance analysis. It is hoped that fuzzy performance trees and fuzzy set analysis can be used as a tool for the quality and risk analysis for other construction techniques in the future. Baldwin's rotational models are used to represent the membership functions of the fuzzy sets. Three scenarios are presented using fuzzy MEAN, AND and OR gates from the lowest to intermediate levels of the tree, and fuzzy SUM gate to relate the intermediate level to the top component of the tree, i.e., BIM application final performance. The use of fuzzy MEAN for lower levels and fuzzy SUM gates to reach the top level suggests the most realistic and accurate results. The methodology (fuzzy performance tree) described in this paper is appropriate to implement in today's construction industry when limited objective data is presented and it is heavily relied on experts' subjective judgment.

Insurance system for legal settlement of drone accidents (드론사고의 법적 구제에 관한 보험제도)

  • Kim, Sun-Ihee;Kwon, Min-Hee
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.33 no.1
    • /
    • pp.227-260
    • /
    • 2018
  • Recently, as the use of drones increases, the risk of drone accidents and third-party property damage is also increasing. In Korea, due to the recent increase in drone use, accidents have been frequently reported in the media. The number of reports from citizens, and military and police calls regarding illegal or inappropriate drone use has also been increasing. Drone operators may be responsible for paying damages to third parties due to drone accidents, and are liable for paying settlements due to illegal video recording. Therefore, it is necessary to study the idea of providing drone insurance, which can mitigate the liability and risk caused by drone accidents. In the US, comprehensive housing insurance covers damages caused by recreational drones around the property. In the UK, when a drone accident occurs, the drone owner or operator bears strict liability. Also, in the UK, drone insurance joining obligation depends on the weight of the drones and their intended use. In Germany, in the event of personal or material damage, drone owner bears strict liability as long as their drone is registered as an aircraft. Germany also requires by law that all drone owners carry liability insurance. In Korea, insurance is required only for "ultra-light aircraft use businesses, airplane rental companies and leisure sports businesses," where the aircraft is "paid for according to the demand of others." Therefore, it can be difficult to file claims for third party damages caused by unmanned aerial vehicles in personal use. Foreign insurance companies are selling drone insurance that covers a variety of damages that can occur during drone accidents. Some insurance companies in Korea also have developed and sell drone insurance. However, the premiums are very high. In addition, drone insurance that addresses specific problems related to drone accidents is also lacking. In order for drone insurance to be viable, it is first necessary to reduce the insurance premiums or rates. In order to trim the excess cost of drone insurance premiums, drone flight data should be accessible to the insurance company, possibly provided by the drone pilot project. Finally, in order to facilitate claims by third parties, it is necessary to study how to establish specific policy language that addresses drone weight, location, and flight frequency.

A Study on the Present Status and Future Directions of Maritime Safety Audit (해상교통안전진단제도의 운영현황과 향후 정책방향에 관한 연구)

  • Cho, Ik-Soon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.17 no.4
    • /
    • pp.399-405
    • /
    • 2011
  • Recently, the navigation risk is increasing significantly with growth of marine traffic volume and construction of marine facilities, water bridges, port development and marine wind farm etc. To reduce this kinds of risk, Ministry of Land, Transport and Maritime Affairs enacted a new law called MSA(Maritime Safety Audit) as a comprehensive maritime traffic safety management scheme in order to ensure safety improvements from the early planning stage to post managing of the development which affect the maritime traffic environment. MSA as a tool for improving maritime traffic safety is a formal safety assessment in the existing or future ship's fairway by an independent audit team. It examines the potential hazards of maritime traffic safety, if necessary, and is to ensure the implementation of appropriate safety measures. The object of this paper is to comprehensively evaluate the achievements and implementation problems of MSA about the 2 years, to define the fundamental problems of MSA by conceptualizing and analyzing MSA limits. MSA requires further examination about the introduction of screening and scoping in order to increase the efficiency and objectivity. It will be required the measures concerning policies directions as a tool for planning process for project owner. It will lead to right understanding concerning audit scheme and used in various ways such as amendments to related law.

Estimation Method of Waste Amount from Materials to Develop Generation Rates of Construction Waste in New Apartment Construction Sites: Focused on Bill of Quantities for Architectural Works (신축아파트 현장의 건설폐기물 발생원단위 개발을 위한 자재별 폐기물 수량 예측 방법: 건축공사 내역서의 투입 물량을 중심으로)

  • Jung, Jong-Suk;Song, Sang-Hoon;Park, Seong-Sik;Lee, Seok-Je
    • Land and Housing Review
    • /
    • v.5 no.1
    • /
    • pp.41-51
    • /
    • 2014
  • The amount of new apartment construction has been trending upward in 3~4% each year since 11% increase in 2002. Currently, in public apartment construction sites under separate delivery system for construction waste processing, the significant difference between estimated quantity for contract and actual amount frequently causes severe controversy among project participants. Many factors such as poor environmental management, inadequate contractual amount are assumed to influence the above problem, and the requirement to revise existing generation rates, the key criteria applied in estimating the quantities of waste, is increasing. Most of generation rates were established in early 2000's, and have difficulty in reflecting the changes from new materials and technologies accordingly. Therefore, this study aims to clarify the types of construction waste for each trade and the forecast method as preliminary work in order to develop more accurate generation rates for construction waste in new construction. To achieve this purpose, the architectural bills of quantities in ten apartment projects executed during 2010~2013 were collected, and the possible waste types and reasonable material loss ratio for each item from temporary works to owner-supplying material area were defined and compared through the workshops and interviews with the experts and on-site environmental managers. The results of this study will contribute to establishing the categories of construction waste for construction trades and proper generation rates by the indirect estimation method in new apartment construction in the follow-up study.

Some Practical Issues on the International Construction Contract (국제건설계약(國際建設契約) 실무상(實務上) 유의점(有意點))

  • Kim, Seung-Hyeon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.25
    • /
    • pp.3-40
    • /
    • 2005
  • Many Korean construction companies have been performing a variety of overseas construction projects since the 1970s. It is unfortunate that in many cases they have had to suffer big losses caused by errors and defects in the design and construction of the projects. In the author's opinion, however, there were losses that could have been avoided if they had understood better the feature and content of the particular construction contract. Few lawyers and scholars in Korea have been interested in the research and study of international construction contracts. This is mainly because they do not have access to practical sources outside of Korea for them to research and study since the contracts undertaken have been dealt with by law firms in other jurisdictions to which the disputes apply. This article is aiming primarily at the introduction of the issues which the practitioners are likely to confront in the process of reviewing and performing the international construction contract. In some cases solutions are sought about these issues based upon the FIDIC standard terms and conditions, the actual experience of practice, and UNIDROIT Principles, etc. It is reasonable to say that all the issues related to the international construction contract cannot be covered in a short article like this. The author wishes this article could induce subsequent studies on international construction contracts for further research. It has to be noted that from time to time Korean construction practices have been compared to the international ones for better understanding. This article mostly includes cases where the Korean construction companies go overseas for their projects, while there are some cases where foreign developers and financial investors participated in domestic projects in which international construction contracts forms were adopted. A few precedent domestic writings about international construction contracts seems to lack emphasis on the points that there are several standard construction contract forms and that they are different. The differences are mainly in accordance with who bears the design responsibility, how the owner has to make progress payments to the contractor and who the funding source for the project is. This article tries to make it clear that there are significant differences between the standard contract forms, e.g. a simple construction form, a design-build form and an EPC/turnkey form of contract. Again, the author hopes that this article can arouse the interest in the international construction contracts from both academic and practical fields, so that many subsequent advanced articles can help our construction industry become much more competitive in the world through awareness of the methods of procurement and administration of the contracts.

  • PDF

Innovation in Giorgetto Giugiaro's Automobile Design (Giorgetto Giugiaro의 자동차디자인의 혁신성)

  • Lee, Myung-Ki
    • Archives of design research
    • /
    • v.19 no.5 s.67
    • /
    • pp.383-394
    • /
    • 2006
  • In 2005, Giorgetto Giugiaro unveiled the Ferrari GG50 at the 50th anniversary celebration of his design career. Beginning his career at the age of 17, he is a master designer who has achieved design revolution by uniting creativity, design methodology, and technology. He has been awarded a number of international prizes for his exquisite achievements and reputation for car design. Carrozzeria of ITAL DESIGN, founded by Giugiaro, is a company whose ideas combine cutting-edge technology and high quality craftsmanship. Beginning in car design, ITAL DESIGN achieved a positive reputation internationally and, since 1999, has expanded even more rapidly under its new name, ITAL DESIGN-GIUGIARO. The owner of 12 affiliates worldwide, all service systems are buyer-oriented, ensuring the highest level of technical consulting. Beginning with the 1971 Alfa Romeo Alfasud, the 1st major project, more than 100 cars have been designed in the past 35 years, leading to the production or in million cars by major motor companies around the world. Giugiaro has focused on practical performance as well as external beauty in his car design, the best of which enter the mass market. With his philosophy of "I want to be the 1st customer of my design" Giugiaro design invites customer participation and input to meet their needs and demands. Free from the routine, typical image, Giugiaro design has raised the bar for creativity and thinking beyond traditional values and ideologies.

  • PDF

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.