• Title/Summary/Keyword: Project Operation System

Search Result 745, Processing Time 0.025 seconds

Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea

  • Jung, In-Hye;Roh, Ho-Young;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.149-156
    • /
    • 2020
  • Blast furnace revamping in steel industry is one of the most important work to complete the complicated equipment within a short period of time based on the interfaces of various types of work. P company has planned to build a Smart Tracking System based on the wireless tag system with the aim of complying with the construction period and reducing costs, ahead of the revamping of blast furnace scheduled for construction in February next year. It combines the detailed design data with the wireless recognition technology to grasp the stage status of design, storage and installation. Then, it graphically displays the location information of each member in relation to the plan and the actual status in connection with Building Information Modeling (BIM) 4D Simulation. QR Code is used as a wireless tag in order to check the receiving status of core equipment considering the characteristics of each item. Then, DB in server system is built, status information is input. By implementing BIM 4D Simulation data using DELMIA, the information on location and status is provided. As a feature of the S/W function, a function for confirming the items will be added to the cellular phone screen in order to improve the accuracy of tagging of the items. Accuracy also increases by simultaneous processing of storage and location tagging. The most significant effect of building this system is to minimize errors in construction by preventing erroneous operation of members. This system will be very useful for overall project management because the information about the position and progress of each critical item can be visualized in real time. It could be eventually lead to cost reduction of project management.

  • PDF

The Empirical Analysis on the Performance of Inter-firm Network Management in the IT Service Firms (IT서비스 기업에서의 네트워크 경영 관련 성과 요인에 대한 실증 연구)

  • Ahn, Yeon S.
    • Journal of Information Technology Services
    • /
    • v.10 no.1
    • /
    • pp.47-64
    • /
    • 2011
  • In the IT(Information Technology) service, which supply the solutions related to business management and IT, network construction and application trends, the related service business are increasing according to the enlargement of project scope and the diversity of project types as the need of service customers. In this paper, I propose the significant effect factors on the network management of IT service firms. The key findings are from the analysis result about 94 IT service firms as follows. For implementation the high performance of network management in the IT service firms, the strategic elements in the process of network construction are more conceived highly than the basic element in them. Also the perspective of project objectives are considered than the nominal perspectives in the partner selection process. The competency of partner firms', the cooperation process between the partner firms', network relation operation management and network relation structure management are the significant effect factors of network management.

Determination of Key Elements Using FTA/FMEA Safety Techniques for Precedent Research Stage of Defense R&D Programs (국방 선행연구단계에서 안전분석 기법 FTA/FMEA의 활용을 통한 핵심요소의 결정)

  • Choi, Se Keun;Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.50-61
    • /
    • 2018
  • A precedent defense project study was carried out in the early stage of the project to support efficient determination of the acquisition method of the determined weapons system. A precedent study in the early stage of the project has been neglected, but lack of performance and increased costs are continuing problems. In a precedent study on a number of items within a limited time frame, expected risks during project implementation were not identified and reduced by failing to review the key review element in depth. Therefore, in this paper, we studied the application of the FTA/FMEA technique used in the system safety analysis process to identify key factors to be considered when carrying out the defense research project. The methodology for the development of the key review items was established through the improvement of the FTA/FMEA technique in order to meet specific conditions and given conditions. Based on the results of this study, we redefined core key factors in the precedent study stage, thereby eliminating unnecessary and anticipated risks that may arise in the future project management aspects of the defense project. It is anticipated that this will reduce costs and time in terms of the lifecycle of the weapon system and promote stable operation of the project through reduction of risk.

A Study on the System Improvement Plan for an Efficient Market Maintenance Project (시장정비사업의 효율적 실시를 위한 제도개선방안 연구)

  • Kim, Seung-Hee;Kim, Young-Ki
    • Journal of Distribution Science
    • /
    • v.11 no.4
    • /
    • pp.23-35
    • /
    • 2013
  • Purpose - This paper attempts to identify the problems and limitations of a market maintenance project conducted according to the 「Special Act for the Development of Traditional Markets and Shopping Street」 and to present a revised direction for the special law and lay the groundwork for market maintenance projects to be promoted smoothly. Research design, data, and methodology - The revised direction for the legislation and the proposal were written based on an investigation of the problems and the legal system, and proposed measures for market maintenance operation and system improvements to derive the improvements needed for market maintenance projects. Results - A market maintenance project has been conducted as a means to reinvigorate traditional markets that are economically depressed, and to revive the local economy. It was largely conducted in the form of reconstruction and redevelopment and represents the interests of landowners and merchants. Thus, it is most likely to contribute to the gradual disappearance of traditional markets. First, as part of a market maintenance project, many companies are building multipurpose buildings or high-rise residential buildings to increase profits. In these high-rise buildings, they can raise rents, which may not be affordable for some existing small businesses. To solve such problems, the large-scale store registration requirement needs to be relaxed or abolished once the market maintenance project is completed. If the large-scale store registration requirement is to be abolished, the term 'large retail store' should be changed in the 「Special Act for the Development of Traditional Markets and Shopping Street」. After registration, the Small and Medium Business Administration should train merchants, offer consultations, and support events, to the extent that the existing traditional market management modernization project permits, and further continue to manage and support its ongoing activities. However, unless large-scale store registration is abolished, adding an exception clause in the special law to relax large-scale store registration criteria, and permitting changes to building use is another option. At the end of a market maintenance project, empty stores should be purchased by the Small and Medium Business Administration, and local government, etc., at the actual construction cost, to utilize them as public rental shopping areas, which in turn may be re-utilized as a temporary market for another market maintenance project. The second problem in market maintenance projects is merchant-protection. Currently, the special law prescribes that a temporary market be created for merchants to conduct business during the rental period of a market maintenance project. Conclusions - In reality, a market maintenance project is conducted usually in big metropolitan cities with 500,000 residents or more. The main building type created under these projects is a multipurpose building. For this reason, it is very difficult to secure a location for a temporary market in the surrounding area of such a project. To solve this problem, this study suggests 'public rental shopping areas' as mentioned above.

  • PDF

A study on unmanned watch system using ubiquitous sensor network technology (유비쿼터스 센서 네트워크 기술을 활용한 무인감시체계 연구)

  • Wee, Kyoum-Bok
    • Journal of National Security and Military Science
    • /
    • s.7
    • /
    • pp.271-303
    • /
    • 2009
  • "Ubiquitous sensor network" definition is this-Someone attaches electro-magnetic tag everything which needs communication between man to man, man to material and material to material(Ubiquitous). By using attached every electro-magnetic tag, someone detects it's native information as well as environmental information such as temperature, humidity, pollution and infiltration information(Sensor). someone connects it realtime network and manage generated information(Network). 21st century's war is joint combined operation connecting with ground, sea and air smoothly in digitalized war field, and is systematic war provided realtime information from sensor to shooter. So, it needs dramatic development on watch reconnaissance, command and control, pinpoint strike etc. Ubiquitous computing and network technologies are essential in national defense to operate 21st century style war. It is possible to use many parts such as USN combined smart dust and sensor network to protect friend unit as well as to watch enemy's deep area by unmanned reconnaissance, wearable computer upgrading soldier's operational ability and combat power dramatically, RFID which can be used material management as well as on time support. Especially, unmanned watch system using USN is core part to transit network centric military service and to get national defense efficiency which overcome the dilemma of national defense person resource reducing, and upgrade guard quality level, and improve combat power by normalizing guardian's bio rhythm. According to the test result of sensor network unmanned watch system, it needs more effort and time to stabilize because of low USN technology maturity and using maturity. In the future, USN unmanned watch system project must be decided the application scope such as application area and starting point by evaluating technology maturity and using maturity. And when you decide application scope, you must consider not only short period goal as cost reduction, soldier decrease and guard power upgrade but also long period goal as advanced defense ability strength. You must build basic infra in advance such as light cable network, frequency allocation and power facility etc. First of all, it must get budget guarantee and driving force for USN unmanned watch system project related to defense policy. You must forwarded the USN project assuming posses of operation skill as procedure, system, standard, training in advance. Operational skill posses is come from step by step application strategy such as test phase, introduction phase, spread phase, stabilization phase and also repeated test application taking example project.

  • PDF

Development and Operation of Integrated Technical Information System(ITIS) for an Aircraft Development (항공기 통합기술정보시스템(ITIS) 개발 및 운용)

  • Chung, Joon-Young;Lee, Joon-Woo;Kim, Cheon-Young
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.2
    • /
    • pp.75-83
    • /
    • 2006
  • The Aircraft Development Department operated a Technical Document Management System that was effectively managed using a database management system for the management of the technical information created by a research and development phase of an aircraft and managed a technical information of a research and development varied by the project on a lot of the aircraft development program. While managing the user management and technical information project, it caused some problems on the workflow of the Work Memo and a search of some technical information, etc. As result, we developed the web-based Integrated Technical Information System(ITIS) which be able to totally manage the Technical Document Management System varied by program. According to the construction and operation of this system, we can access by program using user account and privilege and dramatically increased the productivity of a research and development because of performing the workflow of the Work Memo and some search of technical information by the integrated screen of the ITIS.

  • PDF

A STUDY ON CYCLONE SYSTEM ASSISTING FOR THE REVISION OF CONSTRUCTION STANDARD PRODUCTION UNIT SYSTEM

  • Tae-Kyung Lim;Han-Seong Gwak;Won-Sang Shin;Chang-Baek Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.583-586
    • /
    • 2013
  • Construction processes are highly repetitive. A resource entity continuously cycles through work tasks that processes or uses resources. Web-CYCLONE (Halpin 1992) has been accepted as a useful tool for modeling and analyzing a specific operation. However the system has a lack of practicality as follows: (1) it does not efficiently record and keep track of operation models in a database; (2) it does not provide the functions which facilitate to retrieve corresponding model and to update local variables of the model using observed data; (3) it does not automate the complex process that executes simulation experiment, analyzes simulation outputs and generates a report on behalf of the practitioners. Therefore, practitioners have a difficulty in reusing, modifying and analyzing the existing operation models. This study introduces a Client/Server based CYCLONE that improves above-mentioned limitations in the existing Web-CYCLONE. The system was illustrated by revising CSPU in practice.

  • PDF

The Improvement Plan of Project Management for Highway Construction Supervisor using Construction Management Benchmarking of Developed Countries (선진국의 공사관리 벤치마킹을 통한 도로건설공사 감독자의 공사관리 향상방안)

  • Lee, Min-Woo;Shin, Eun-Young;Lee, Kyo-Sun;Park, Hwan-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.138-148
    • /
    • 2006
  • The construction supervisors of the public companies are usually responsible for process management, quality management, safety management, and many other various tasks that occur during construction project. Public companies such as Korea Highway Corporation have developed a framework and manual for management and supervision of construction projects. But, there has been the change of business environment such as increase of private investment project and the introduce of construction management system recently. It has been necessary for construction supervisor to streamline the current project management system in the owner's aspect in order to cope with the expected new challenges. Accordingly, this research has been investigated and analyzed the operation system between Korean supervisor and foreign supervisor in their public corporation. This research has suggested the advanced project management in their public corporation. Especially, this study has proposed the construction management manual for supervisors such as inspectors training, supervisors construction manual, and supervisors training road map.

A Study on Development for Construction Management System of Private Infrastructure Project (SOC민간투자사업의 CM 운영체계 개발에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Dae-Young;Cho Hun-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.404-407
    • /
    • 2004
  • This Research suggested direction of development and analyzed necessity and given condition of CM(Construction Management) operation system of SOC private infrastructure project which is judged to grow up continuously from now on, Direction of development which is suggested in this research is largely there, (1)development of SOC private infrastructure project CM work standard process guide, (2)development of SOC Private Investment project feasibility study Performance standard, (3)checklist of SOC by stages and functionally private investment projects risk. Through this development, later we judge effect not only supply of a model case to artivate CM system but heightening of efficiency in domestic construction industry.

  • PDF

Allocation of Design Assurance Level for KASS Based on International Standards (국제표준에 기반한 KASS 개발보증레벨 할당)

  • Bae, Dong-hwan
    • Journal of Advanced Navigation Technology
    • /
    • v.20 no.1
    • /
    • pp.1-7
    • /
    • 2016
  • Since 2014, MOLIT (Ministry of Land, Infrastructure, and Transport) is carrying out a KASS project to develop and construct Korean SBAS. KASS can cause damage of human & properties if it has some problem during operation. Therefore, system safety assessment for KASS development is very important. Principal point of system safety assessment is the allocation of DAL(design assurance level) based on the hazard identification and classification. In this parer, the author conducts the allocation of DAL for KASS & its sub-systems based on the international standard(SAE ARP4761), which suggests a best practice of aviation system safety assessment. The result of this paper are the first step of system safety assessment, and can be used for further system safety assessment of KASS project.