• Title/Summary/Keyword: Project Operation System

Search Result 742, Processing Time 0.03 seconds

Establishment of Document Control System for the Jordan Research and Training Reactor Project (요르단연구로건설사업 문서관리시스템 구축)

  • Park, Kook-Nam;Ko, Young-Cheol;Wu, Sang-Ik;Oh, Soo-Youl;Lee, Doo-Jeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.49-56
    • /
    • 2011
  • The Project of Jordan Research and Training Reactor (JRTR) officially launched in Aug. 2010. JRTR is the first made-in-Korea nuclear system to be built abroad by year 2015, and Korea Atomic Energy Research Institute (KAERI) is responsible for the design of major systems including the reactor core. While the PDCS (Project Document Control System) being operated by EPC company controls all the documents of the whole Project, KAERI is supposed to have its own system for KAERI documents. Meeting such a need; KAERI has implemented a document control for the JRTR Project into already existing ANSIM (KAERI Advanced Nuclear Safety Information Management) system. The documents of JRTR project to be controlled are defined in the PPM (Project Procedures Manual), QAP (Quality Assurance Procedure) and PEP (Project Execution Program). The ANSIM consists of the document management holder, document container holder and organization management holder. The document management holder, which is the most important part of ANSIM-JRTR, consists of the DDA (Document Distribution for Agreement), IOC (Inter-office Correspondence), PM Memo. (Project Manager Memorandum) and cover sheets of design documents. Other materials such as meeting minutes, sub-department materials and design information materials are stored in an independent COP (Community of Practice). This established computerized document control system, ANSIM, could lessen a burden for project management team and enhance the productivity as well.

Development of An Evaluation Index for Intermediate Outcomes from Rural Village Development Project (농촌마을종합개발사업의 중간결과 평가지표 설정)

  • Kim, Hyeon-Soo;Kim, Kyung-Ryang;Choi, Youn-Sang;Jung, Hae-Dong;Jun, Taek-Ki;Hong, Chan-Sun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.429-435
    • /
    • 2005
  • This study attempts to develop indices in order to make an objective and effective evaluation of achievements in the first stage of operation of the Rural Village Development Project(RVDP) (the first 3 years of its operation). The results are as follows 1. Evaluation purposes are expansion of income-generating bases, improvement of living environments, strengthening of village's competence and establishment of an effective project's management system. 2. Evaluation items for the first three evaluation purposes, which are income-generating bases, improvement of living environments and strengthening of village's competence, are record of performance and substantiality in project's operation, results from operation, and capability in managing the project. Those for establishment of an effective project's management system are participation of habitants and the projects's management system. 3. As this study aims to develop the indices which can evaluate the state of operation in the interim of the project's operation and outcomes generated by then, the evaluation indices are selected by considering those criterions of representativeness, accessibility, usefulness and reliability. 4. As the indices developed in this study efficiency evaluate the process of project's operation and thus evaluate basically the project's operation on the basis of its efficiency. But, considering the purposes of the RVDP, it is included for the overall project's management system and plans for managing activities of the project to be evaluated on the basis of effectiveness.

  • PDF

A Study on Maintenance Actual Condition and Revitalization of Rural Development Project (일반농산어촌개발사업 완료지구 시설물 실태분석 및 활성화 방안 연구)

  • Choi, Young-Wan;Kim, Keun-Ho;Eun, Hee-Chang;Lee, Young-Kyu;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.1-8
    • /
    • 2016
  • This study is intended to prepare an revitalization plan of region where rural development project is completed through an analysis of the actual condition of facility operation and maintenance in the region where the project is completed. The results of survey of actual condition of facility operation in the region where rural development project was completed showed that the facilities were not self-sufficient in terms of operation and maintenance cost. Therefore, a prerequisite to the revitalization of region where the project is completed is to prepare an alternative plan for increasing the efficiency and applicability of currently already prepared facilities. Second, a project operation organization system should be streamlined and the competency of operation personnel should continue to be strengthened. Third, it is necessary to prepare a support system and establish cooperation networks for increasing the extensibility of project and continuing to induce community revitalization in the region where the project is completed in the future.

A NESTING APPROACH IN DISCRETE EVENT SIMULATION FOR INTEGRATING CONSTRUCTION OPERATION AND SCHEDULE MODELS

  • Chang-Yong Yi;Chan-Sik Park;Doo-Jin Lee;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.400-408
    • /
    • 2009
  • Simulation applications for analyzing the productivity of construction operations at operation level and project schedules at project level are crucial methods in project management. The application at two different levels should be very tightly linked to each other in practice. However, appropriate integration at the levels is not achieved in that existing systems do not support to integrate operation models into a schedule model. This paper presents a new approach named to Discrete Event Simulation-Nesting modeling approach, which supports not only productivity analysis at operation level but also schedule management at a project level. The system developed by the authors allows creating operation models at the operation level, maintaining them in operation model library, executing sensitivity analysis to find the behaviors of the operation models when different combination of resources are used as existing DES systems do. On top of the conventional functions, the new system facilitates to find the optimum solution of resource combinations which satisfy the user's interest by computing the hourly productivity and the hourly cost of the operation. By drag-and-dropping an operation model kept in the operation model library, the operation models are integrated into an activity of the schedule model. When a complete schedule model is established by nesting operation models into the schedule model, stochastic simulation based scheduling is executed. A case study is presented to demonstrate the new simulation system and verify the validity of the system.

  • PDF

A study of system functions allocation of wireless communications based train control system (도시철도용 무선통신기반 열차제어시스템 기능배치 연구)

  • Yoon, Yong-Ki;Oh, Seh-Chan;Kim, Min-Su;Kim, Yong-Kyu;Choi, June-Young;Park, Jae-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2300-2305
    • /
    • 2011
  • A Train control system is intended to assure train operation safety and to improve train operation efficiency. To perform these missions, the Train Control System consists of train safety space control part, train route control part and train operation management part. Train control technology changed from track circuit based to wireless based. And Wireless based train control technologies were developed by some railway signaling companies in Korea. To commercialize these control technologies, the development project is carried now. This project did analyze system requirements, and made the system development specification. Now this project finished system functions allocation, which will be performed by some subsystem. This paper describes roles of each function and the allocation of these functions to each subsystem.

  • PDF

Canal Operation Simulation of Middle Route Project

  • Fan, Jie
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.26-32
    • /
    • 2008
  • Middle Route Project, the largest water conveyance system in China delivers the water of Changjiang River to North China. In order to create canal operation simulation system, mathematical models are established based on the analysis of hydraulics about steady flow, unsteady flow, and check gate. By simulating the canal operation behavior, we improved the check gate control algorithm and predicted the change process of water surface and flow profile which is very valuable to actual canal operation.

  • PDF

A Study on A Computerized Input Data Model for A General -Purpose Project Management (교량공사를 중심으로 한 범용 프로젝트 관리를 위한 전산 입력 자료 모형 구축)

  • Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.19-31
    • /
    • 2016
  • The purpose of this study was to establish the initial computerized management database which can be applied to a universal project management computer system for managing universal project management and operation. Database construction model presented in this paper suggested the model of organization, activity and operation of bridge construction(two abutment-three-span) based on the organization information classification system of the facility classification, functional component classification, work classification, resource classification. Database model established in this study are considered to be able to take advantage of a very systematic and scientific management for future universal project management and operations.

Status and test results of the HPRF system for PEFP 20MeV linear accelerator

  • Seol, K.T.;Kwon, H.J.;Kim, H.S.;Song, Y.G.;Cho, Y.S.
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 2005.10a
    • /
    • pp.915-916
    • /
    • 2005
  • The high power RF system for the PEFP 20MeV proton accelerator composed of the 3MeV RFQ and the 20MeV DTL has been installed. The klystron for the RFQ was tested up to 600kW and operated routinely to drive the RFQ in a pulse mode operation. The klystron for the DTL which consists of 4 tanks was tested up to 800kW in pulse mode operation. The pulse width and repetition rate was 50${\mu}s$ and 1Hz respectively. The high power RF system has been operated to drive each accelerating structure and will be used to accelerate 20MeV proton beam.

  • PDF

INTRODUCTION OF THE SIMC PROJECT

  • Chae, Gee-Ju;Cho, Seong-Ik;Park, Jong-Hyun;Jo, Kwan-Bok
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.356-359
    • /
    • 2006
  • The high prices and lack of information for satellite images prevent researchers from studying remote sensing and most non-professional people can't have the simple and easy solutions for the manipulation of satellite images. 'Satellite Imagery Information Management Center'(SIMC) project which is promoted by ETRI (Electronics and Telecommunications Research Institute) from 2002 to 2005 in Korea have the purpose to provide the satellite images freely to the public domain and the solutions for the above mentioned problems. Our project have the following five systems; Data Acquisition System, Data Preservation System, Integrated Solution System, Technology Development System, Operation Plan System. Data Acquisition System collects the satellite images such as LANDSAT, IKONOS, etc. Data Preservation System consists of database which registers the diverse satellite images. Integrated Solution System gives the user of public domain for the web service which search, order and transfer the satellite images. Technology Development System has the many processing technologies for the satellite images. Finally, the Operation Plan system has the role to plan the future of our SIMC project. In this paper, we will give the result of SIMC Project for each five systems during the fast four years from 2002 to 2005.

  • PDF

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF