• 제목/요약/키워드: Project Life-cycle

검색결과 479건 처리시간 0.028초

극한지 파이프라인 프로젝트 설계단계에서의 데이터 분류에 관한 연구 (A Study on the Data Classification in Engineering Stage of Pipeline Project in Extreme Cold Weather)

  • 김창한;원서경;이준복;한충희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.214-215
    • /
    • 2014
  • Recently, Russia decided to export an annual 7.5 million tons of natural gas to Korea over 30 years from 2015, as also deal with China, planed to build a pipeline connecting Siberia to Shandong Peninsula about 4000km. Risk management is required depending on the project in extreme cold weather, because it is concerned about the behavior of the seasonal changes in soil temperature and the strain of pipe according to the long-distance pipeline construction. The plan of data management shall be prepared in parallel for a sophisticated risk management, because a data is massive scale and it is generated/accumulated in real time. Therefore, this research is aimed to classify a data items in engineering stage of pipeline by previous studies for managing a generated data depending on the detail works in extreme cold weather. We expect to be provided the foundation of an efficient classification system of a generated data from the pipeline project life cycle.

  • PDF

위험대상요소 분석을 위한 프로세스 마일스톤에 관한 연구 (A Study of Process Milestone for the Analysis of Risk Items)

  • 이은서
    • 정보처리학회논문지D
    • /
    • 제16D권1호
    • /
    • pp.105-112
    • /
    • 2009
  • 위험관리는 점점 더 프로젝트 관리자에게 있어서 중요한 일중의 하나로 되어가고 있다. 그것은 개발될 소프트웨어 품질 혹은 프로젝트 일정에 영향을 미칠 수 있는 위험을 예측하는 것을 포함한다. 위험 분석의 결과가 생길 수 있는 위험의 결과와 함께 프로젝트에 문서화되어야 한다. 효율적인 위험관리는 문제에 쉽게 대처할 수 있게 해주며, 그것이 수용할 수 없는 예산이나 일정 지연이 되지 않도록 해준다. 본 연구에서는 소프트웨어 개발 시, 프로세스 이정표와 노력에 관한 위험요소 분석에 대한 기준을 제시한다. 또한 이를 정량화 하여 전이단계를 제시한다.

건설CALS시스템 정보공개 현황분석을 통한 개선 방안 연구 (Analyzing Information Disclosure in the Construction CALS System: A Study on Improvement Strategies)

  • 정수매;김태학
    • 한국산업융합학회 논문집
    • /
    • 제26권6_3호
    • /
    • pp.1243-1249
    • /
    • 2023
  • The Public Data Act mandates that every public institution must make efforts to facilitate convenient access to public data for all and take necessary measures to universally expand the right to use such data. Furthermore, it specifies that the head of a public institution must provide the data held and managed by that institution to the citizens. The Construction Project Information Disclosure Service aims to increase the utilization of data within the Construction CALS System, creating new added value by disclosing information and fostering communication. This service seeks to enhance public interest and transparency, support the creation of new businesses based on construction project data, and stimulate related industries. Since 2019, a total of 26 types of information have been disclosed through this service. As the volume of disclosed information continues to increase, there has been a consistent demand for reducing burden on data providers and enhancing user functionality. This study analyzes the current status of the Construction CALS Information Disclosure System to identify its existing challenges. Subsequently, it establishes a systematic approach to the data opening process and proposes enhancements to information disclosure and search functionalities for addressing these challenges.

Follow-up 활동을 강조한 연속적 설계VE 프로세스 (Consecutive Design VE Process Emphasized on Follow-up Activities)

  • 양진국;문성우
    • 대한토목학회논문집
    • /
    • 제29권2D호
    • /
    • pp.235-244
    • /
    • 2009
  • 최근 건설공사에서 설계VE 업무의 중요도는 더욱 증대되고 있으며, 일상적인 관리활동으로 도입되고 있다. 건설공사에서 설계VE는 기본설계와 실시설계 두 번에 걸쳐 진행된다. 설계VE의 효과를 높이기 위해서는 발주자 및 사용자 요구사항과 설계의 라이프 사이클 측면에서 기본설계와 실시설계 VE 결과를 상호 연계할 필요가 있다. 본 연구에서는 설계VE 업무를 효율적으로 수행하기 위한 연속적 설계VE 프로세스를 제시한다. 제시된 모델에서는 Follow-up(후속조치) 활동을 강조하여 VE 성과 분석 중심의 업무모델을 수립했다. 제시된 모델을 설계VE 실무사례에 적용하여 효율성을 검증했다. 실제 VE 업무에 적용한 결과 첫째, 발주자 및 사용자 요구사항을 체계적 반영할 수 있었으며; 둘째, VE 제안내용의 반영계획 수립을 통한 발주자 의사결정을 지원하고; 셋째, 설계업무 인터페이스를 강화하며; 넷째, 반영결과 추적을 할 수 있었다. 이러한 효과를 고려할 때 본 연구에서 제시한 설계VE 업무모델은 설계의 라이프사이클에서 설계VE 결과를 추적하고 업무분석을 체계화하는데 기여할 것으로 기대된다.

소프트웨어 개발 세부단계 노력 추정 모델 (A Model for Software Effort Estimation in the Development Subcycles)

  • 박석규;박영목;박재흥
    • 한국컴퓨터산업학회논문지
    • /
    • 제2권6호
    • /
    • pp.859-866
    • /
    • 2001
  • 성공적인 프로젝트 계획은 활용 가능한 일정과 더불어 프로젝트를 완수하는데 요구되는 노력을 얼마나 정확히 추정하느냐에 달려있다. 새로운 또는 보다 나은 모델 개발에 많은 연구가 이루어졌지만 현존하는 소프트웨어 노력 추정 모델들은 개발 전순기에 대해 투입되는 총 개발노력과 단위시간당 소요되는 인력인 노력 함수만을 제공한다. 또한, Putnam은 세부단계별로 일정한 개발노력 투입 비율을 제시하였다. 그러나 소프트웨어의 규모, 복잡도와 운영환경의 영향으로 인해 프로젝트 별로 투입되는 총 개발노력의 규모에 차이가 발생하며, 그 결과, 개발 세부단계별로 투입되는 노력의 규모도 프로젝트마다 차이가 발생한다. 본 논문은 총 개발노력 변동에 따른 소프트웨어의 명세화, 구축과 시험단계에 투입될 개발노력을 추정하는 선형과 다항식 모델을 제시하였다. 이 모델들은 128개의 다른 소프트웨어 프로젝트들로부터 유도되었다. 제안된 모델은 프로젝트의 일정과 노력 할당 관리에 실질적인 지침을 제공할 것이다.

  • PDF

VE 적용에 의한 지하 골조공사 개선연구 (Case Study on the Improvement of Underground Building Works through the VE)

  • 홍재욱;김선국;이종국
    • 한국건설관리학회논문집
    • /
    • 제5권3호
    • /
    • pp.106-113
    • /
    • 2004
  • 건설산업의 고부가가치화를 위해서는 계획적인 원가절감에 의한 방법과 기능의 향상에 의한 방법 및 효율적인 추가 원가투입에 의하여 더 높은 기능 향상을 실현함으로써 부가가치를 높이는 방법을 추구하여야 할 것이다. 특히 건축공사에서 골조공사는 전체 공정 및 원가에 영향을 크게 미치는 주요 공정으로서 철저한 공사관리 계획과 관리가 요구되는 부분으로서 생산 활동 및 공사 방식 선정의 효과를 크게 볼 수 있는 항목이라 할 수 있다. 본 연구는 현재 도심지 공사에서 날로 증가하고 있는 지하공사의 비율을 감안하여 지하골조 공사의 성능개선에 초점을 두었다. 건축물의 지하골조공사에 있어 효과적인 공기 및 원가절감을 위하여 VE 기법을 검토하여 VE 프로세스와 분석차원을 모델링하고, 이를 현장에 적용, 사례연구를 통하여 그 타당성을 입증하였다. 따라서 본 연구는 건축물 지하골조공사의 VE 활용모델로서 기술대안 선정방식 수립의 기초적인 연구가 될 것으로 기대된다.

사진기록의 디지털화 사례분석과 전략모델 제안에 관한 연구 (A Study on Establishing a Strategy Model Through Analyzing Cases of Digitization of Photographs)

  • 김장환;박주석
    • 한국기록관리학회지
    • /
    • 제9권1호
    • /
    • pp.121-150
    • /
    • 2009
  • 본 연구는 시각문화 패러다임의 등장을 염두에 두고 사진기록의 의미를 재조명함으로써, 사진기록을 디지털화하는 데 필요한 디지털화 전략모델을 수립하고자 하였다. 디지털화 전략모델은 사진기록을 디지털화할 때 필수적으로 고려해야 할 이슈를 고려하여 프로젝트 라이프 사이클과 디지털화 사슬(digitization chain) 모형을 적용함으로써 일반적인 참조모델로서의 프로세스를 제시하는 방향으로 설계되었다. 크게 Pre-project 단계, Production 단계, Post-project 단계의 세 단계로 나뉘고, 세부적으로 (1) 프로젝트 전체 계획 수립 및 관리, (2) 디지털화 대상 사진기록 선별, (3) 디지털 변환 및 품질 관리, (4) 보존 및 접근 이용의 네 단계로 구분된다. 실질적인 사진기록의 디지털화 전략은 디지털화 객체의 생애 주기에 근거한 연속적인 디지털화 사슬 모형을 기반으로, 생성된 디지털화 객체의 품질을 보장할 수 있도록 설계하였다. 각 단계는 기본적인 프로세스와 그에 대한 세부 내용 및 체크 리스트로 구성되어 있다.

기술지주회사 연구동향과 기업성과 향상을 위한 제언 : Project Management Office(PMO) 도입을 중심으로 (Research Trends of Technology Holding Companies and Suggestions for improving Corporate Performance : Focusing on the introduction of PMO)

  • 이강오;이찬호
    • Journal of East Asia Management
    • /
    • 제4권1호
    • /
    • pp.53-77
    • /
    • 2023
  • Modern company faces an uncertain future and a competitive environment and are seeking new technologies and creative products to ensure the corporate growth and survival in the market through continuous innovation. "University Industry Cooperation(UIC)" is a point of contact for overcoming the crisis faced by companies and universities in this era and a cooperation platform for mutual prosperity. As a subsidiary of a university, "Technology Holding Company(THC)" is attracting attention as a new window for UIC in Korea. The role of THC is to establish and foster the business opportunities of their subsidiaries and to return investment profits to the university ecosystem again. But recently, the life cycle of technology is getting shorter, and the development cost is steadily increasing. In particular, with the increase of hybrid projects based on convergence and combination, the risk of conducting research(R&D) and new product development(NPD) projects is gradually increasing. A PMO refers to a project management organization that can contribute to improving the success rate of projects with increasing uncertainty by supporting project visibility and appropriate decision-making. The purpose of this study is to raise a research question on whether THC's corporate performance can be improved when "Project Management System(PMO Service)" is introduced into the subsidiary incubation system of THC. This study proposes several research methods to identify the relationship between the introduction of PMO and the corporate performance of THC.

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

Artificial Insemination and Embryo Transfer Project to Foster Mongolia Dairy Industry

  • Kwon, Tae-Hyeon;Choi, Byeong-Hyun;Cho, Su-Jin;Tsolmon, Munkhbatar;Durevjargal, Naidansuren;Baldan, Tumur;Min, Chan-Sik;Kong, Il-Keun
    • 한국수정란이식학회지
    • /
    • 제24권4호
    • /
    • pp.289-292
    • /
    • 2009
  • Mongolia has 80% livestock of total agriculture industry, 170,000 farms are engaged, 2,500,000 of cows that were beef and dairy cows are raised. Despite of Mongolian has great application with milk, there are not clear differences between cow and dairy cattle, and the production of milk is also low. But the milk suppliers are varied (horse, sheep, goat, etc), so that the total milk production is 500 thousand ton per year. It's really considerable to improve the breed of owing to many problems with big differences among milk qualities. For carrying out for first year project, artificial insemination project was operated with 3rd grade Holstein semen that were imported from S. Korea, and initiation and field training were also carried out through appropriate AI technique we developed for Mongolia environment. Local information research and MOU conclusion were done with professor D. Altangerel in May $10^{th}{\sim}13^{th}$, 2009, and development for AI technique and AI equipments were supplied for Mongolia breeding and natural environment in July $10^{th}{\sim}17^{th}$ in 2009. All cows were treated by synchronization for AI. To do this, $PGF_{2\alpha}$ injection were treated for luteal phase cow, if it wouldn't work, try again after 11 days. After confirmation of estrus, AI and AI training were carried out with sperm injection in the uterus or cervix by rectum-vagina method which is common worldwide, the most effective artificial insemination technique. If cows were return to next estrus cycle, second AI was carried out about approximately 21 days after artificial insemination. After 2 months, all cows not showing return estrus should be taken pregnancy test. Every pregnant cow will be cared thoroughly. Total 48 cows administrated by $PGF_{2\alpha}$ for synchronization and after 48 hours 45 cows (93.8%) showing estrus were detected and then artificial inseminate them within who 8 cows (27.8%) showed return estrus. Therefore, Using $PGF_2{\alpha}$ for synchronization is effective to use for Mongolia breeding conditions. There are possibility of base for food production after all, including increase of livestock production in Mongolia by improvement of breeding cow with AI and embryo transfer project.