• Title/Summary/Keyword: Project Life-cycle

Search Result 479, Processing Time 0.029 seconds

A Study on the Data Classification in Engineering Stage of Pipeline Project in Extreme Cold Weather (극한지 파이프라인 프로젝트 설계단계에서의 데이터 분류에 관한 연구)

  • Kim, Chang-Han;Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.214-215
    • /
    • 2014
  • Recently, Russia decided to export an annual 7.5 million tons of natural gas to Korea over 30 years from 2015, as also deal with China, planed to build a pipeline connecting Siberia to Shandong Peninsula about 4000km. Risk management is required depending on the project in extreme cold weather, because it is concerned about the behavior of the seasonal changes in soil temperature and the strain of pipe according to the long-distance pipeline construction. The plan of data management shall be prepared in parallel for a sophisticated risk management, because a data is massive scale and it is generated/accumulated in real time. Therefore, this research is aimed to classify a data items in engineering stage of pipeline by previous studies for managing a generated data depending on the detail works in extreme cold weather. We expect to be provided the foundation of an efficient classification system of a generated data from the pipeline project life cycle.

  • PDF

A Study of Process Milestone for the Analysis of Risk Items (위험대상요소 분석을 위한 프로세스 마일스톤에 관한 연구)

  • Lee, Eun-Ser
    • The KIPS Transactions:PartD
    • /
    • v.16D no.1
    • /
    • pp.105-112
    • /
    • 2009
  • Risk management is increasingly seen as one of the main jobs of project managers. It involves anticipating risks that might affect the project schedule or the quality of the software being developed and taking action to avoid these risks. The results of the risk analysis should be documented in the project plan along with an analysis of the consequences of a risk occurring. Effective risk management makes it easier to cope with problems and to ensure that these do not lead to unacceptable budget or schedule slippage. This research provides criteria of analysis of risk items to the estimation of process milestone on software development. Also, In this paper propose to a fixed quantity and transition phase.

Analyzing Information Disclosure in the Construction CALS System: A Study on Improvement Strategies (건설CALS시스템 정보공개 현황분석을 통한 개선 방안 연구)

  • Xiu-Mei Zheng;Tae-Hak Kim
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.6_3
    • /
    • pp.1243-1249
    • /
    • 2023
  • The Public Data Act mandates that every public institution must make efforts to facilitate convenient access to public data for all and take necessary measures to universally expand the right to use such data. Furthermore, it specifies that the head of a public institution must provide the data held and managed by that institution to the citizens. The Construction Project Information Disclosure Service aims to increase the utilization of data within the Construction CALS System, creating new added value by disclosing information and fostering communication. This service seeks to enhance public interest and transparency, support the creation of new businesses based on construction project data, and stimulate related industries. Since 2019, a total of 26 types of information have been disclosed through this service. As the volume of disclosed information continues to increase, there has been a consistent demand for reducing burden on data providers and enhancing user functionality. This study analyzes the current status of the Construction CALS Information Disclosure System to identify its existing challenges. Subsequently, it establishes a systematic approach to the data opening process and proposes enhancements to information disclosure and search functionalities for addressing these challenges.

Consecutive Design VE Process Emphasized on Follow-up Activities (Follow-up 활동을 강조한 연속적 설계VE 프로세스)

  • Yang, Jin Kook;Moon, Sung Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.235-244
    • /
    • 2009
  • Design Value Engineering (VE) has become an import part of the daily design process since it has been introduced in the construction industry. Design VE is usually conducted in the general and execution design stages respectively. In order to increase the effectiveness of the VE process, the outcome from the general design VE activities should be integrated into execution design. The outcome from the execution design should be used again for construction. In this study, a consecutive VE process model has been presented as a way to improve the current practice of design VE activities in the construction industry. In the presented model, follow-up activities are emphasized to increase values from the life-cycle perspective of a construction project. The model was tested in a case study of an actual design VE process. The result of the study demonstrates that the model can: 1) effectively incorporate owners requirements; 2) assist decision making in selecting better construction; 3) increase the interface between general and execution design stages; and 4) trace the value flow more efficiently. Overall, the study results indicates that a the consecutive VE process model can be effectively applied when construction project are contracted for the life-cycle management of construction projects.

A Model for Software Effort Estimation in the Development Subcycles (소프트웨어 개발 세부단계 노력 추정 모델)

  • 박석규;박영목;박재흥
    • Journal of the Korea Computer Industry Society
    • /
    • v.2 no.6
    • /
    • pp.859-866
    • /
    • 2001
  • Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Despite the extensive research done developing new and better models, existing software effort estimation models are present only the total effort and effort (or manpower: people per unit time) function for the software life-cycle. Also, Putnam presents constant effort rate in each subcycles. However, the size of total efforts are variable according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in subcycle also differ from project to project. This paper suggests the linear and polynomial effort estimation models in specifying, building and testing phase followed by the project total effort. These models are derived from 128 different projects. This result can be considered as a practical guideline in management of project schedule and effort allocation.

  • PDF

Case Study on the Improvement of Underground Building Works through the VE (VE 적용에 의한 지하 골조공사 개선연구)

  • Hong Jae-Wook;Kim Sun-Kuk;Lee Jong-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.106-113
    • /
    • 2004
  • Most construction project managers should focus on the reasonable cost-down with same quality and function-enhancement with same cost for the value-added construction project delivery in construction industry. Especially, a building structure construction is one of the most important processes to affect the total cost and schedule in building construction project. It means that the process has the possibility of project cost-down or quality-enhancement among the whole project life-cycle. This research focuses on the importance of underground structure of building project by increasing underground use ratio in the urban building construction projects nowadays. This research adopts VE method for the improvement of cost and time by process and analysis dimension modeling on the underground building structure construction, and verifies it throughout the case study, This research is the basic study on the improvement of underground building works through the value engineering method in construction industry.

A Study on Establishing a Strategy Model Through Analyzing Cases of Digitization of Photographs (사진기록의 디지털화 사례분석과 전략모델 제안에 관한 연구)

  • Kim, Jang-Hwan;Park, Ju-Seok
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.9 no.1
    • /
    • pp.121-150
    • /
    • 2009
  • This study reconfigures meanings of photographs for appearing of visual culture paradigm. By this, a strategy model for digitization could establish which needs when photographs are digitized. A strategy model for digitization is based on essential issues when digitized. Also, applying the project life-cycle and digitization chain model, the processes are suggested as a general reference model. Broadly, Three steps, Pre-project step, Production step, Post-project step, are divided and Specifically, Four steps, (1) Establishment and management of the whole project plans (2) Selecting the target for the digitization of photographs (3) Digital Conversion and Quality Control (4) Preservation and access, are separated. Substantial digitization strategy of photographs is built based on chain model of digitization to guarantee qualities of creating digital objects. Each step is constituted with basic processes, details and checklists.

Research Trends of Technology Holding Companies and Suggestions for improving Corporate Performance : Focusing on the introduction of PMO (기술지주회사 연구동향과 기업성과 향상을 위한 제언 : Project Management Office(PMO) 도입을 중심으로)

  • Lee, Kangoh;Lee, Chanho
    • Journal of East Asia Management
    • /
    • v.4 no.1
    • /
    • pp.53-77
    • /
    • 2023
  • Modern company faces an uncertain future and a competitive environment and are seeking new technologies and creative products to ensure the corporate growth and survival in the market through continuous innovation. "University Industry Cooperation(UIC)" is a point of contact for overcoming the crisis faced by companies and universities in this era and a cooperation platform for mutual prosperity. As a subsidiary of a university, "Technology Holding Company(THC)" is attracting attention as a new window for UIC in Korea. The role of THC is to establish and foster the business opportunities of their subsidiaries and to return investment profits to the university ecosystem again. But recently, the life cycle of technology is getting shorter, and the development cost is steadily increasing. In particular, with the increase of hybrid projects based on convergence and combination, the risk of conducting research(R&D) and new product development(NPD) projects is gradually increasing. A PMO refers to a project management organization that can contribute to improving the success rate of projects with increasing uncertainty by supporting project visibility and appropriate decision-making. The purpose of this study is to raise a research question on whether THC's corporate performance can be improved when "Project Management System(PMO Service)" is introduced into the subsidiary incubation system of THC. This study proposes several research methods to identify the relationship between the introduction of PMO and the corporate performance of THC.

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

Artificial Insemination and Embryo Transfer Project to Foster Mongolia Dairy Industry

  • Kwon, Tae-Hyeon;Choi, Byeong-Hyun;Cho, Su-Jin;Tsolmon, Munkhbatar;Durevjargal, Naidansuren;Baldan, Tumur;Min, Chan-Sik;Kong, Il-Keun
    • Journal of Embryo Transfer
    • /
    • v.24 no.4
    • /
    • pp.289-292
    • /
    • 2009
  • Mongolia has 80% livestock of total agriculture industry, 170,000 farms are engaged, 2,500,000 of cows that were beef and dairy cows are raised. Despite of Mongolian has great application with milk, there are not clear differences between cow and dairy cattle, and the production of milk is also low. But the milk suppliers are varied (horse, sheep, goat, etc), so that the total milk production is 500 thousand ton per year. It's really considerable to improve the breed of owing to many problems with big differences among milk qualities. For carrying out for first year project, artificial insemination project was operated with 3rd grade Holstein semen that were imported from S. Korea, and initiation and field training were also carried out through appropriate AI technique we developed for Mongolia environment. Local information research and MOU conclusion were done with professor D. Altangerel in May $10^{th}{\sim}13^{th}$, 2009, and development for AI technique and AI equipments were supplied for Mongolia breeding and natural environment in July $10^{th}{\sim}17^{th}$ in 2009. All cows were treated by synchronization for AI. To do this, $PGF_{2\alpha}$ injection were treated for luteal phase cow, if it wouldn't work, try again after 11 days. After confirmation of estrus, AI and AI training were carried out with sperm injection in the uterus or cervix by rectum-vagina method which is common worldwide, the most effective artificial insemination technique. If cows were return to next estrus cycle, second AI was carried out about approximately 21 days after artificial insemination. After 2 months, all cows not showing return estrus should be taken pregnancy test. Every pregnant cow will be cared thoroughly. Total 48 cows administrated by $PGF_{2\alpha}$ for synchronization and after 48 hours 45 cows (93.8%) showing estrus were detected and then artificial inseminate them within who 8 cows (27.8%) showed return estrus. Therefore, Using $PGF_2{\alpha}$ for synchronization is effective to use for Mongolia breeding conditions. There are possibility of base for food production after all, including increase of livestock production in Mongolia by improvement of breeding cow with AI and embryo transfer project.