• Title/Summary/Keyword: Project Life-cycle

Search Result 479, Processing Time 0.031 seconds

A Study on the Life Cycle Cost Analysis of Light Railroad Transit Bridges (경량전철 교량의 생애주기비용 분석에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai;An, Dong-Geun;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.384-389
    • /
    • 2006
  • The needs for Light Railroad Transit(LRT) have been increased due to the heavy traffic congestions in large cities like Seoul, Korea. Korean government is seeking the LRT system development (including planning, designing, construction, and maintenance and operations) in terms of public-private-partnership (PPP). At the private sector side, it is crucial to estimate the life cycle cost (LCC) to project the cash flow during the O&M period. Since the most construction and O&M cost of LRT project is at the bridge construction, a cost analysis model and a cost breakdown structures (CBS) on LRT bridges are discussed through in depth literature reviews. Construction and maintenance cost of bridges are collected and analyzed. LCC is analyzed by types of bridge superstructures and historical data of repair and rehabilitation (R&R) is investigated. There have been scarce number of LCC analysis on railway bridges. This research delivers a well-defined CBS and maintenance cost data, which will be a great benefit to the systematic maintenance strategy development for railroad bridges.

  • PDF

A Development of the Risk Identification Checklist through the Re-establishment of Risk Breakdown Structure of Construction Project (건설사업 위험분류체계의 재정립을 통한 위험인지 체크리스트 개발)

  • Chu Hae-Keum;Kim Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.109-117
    • /
    • 2003
  • The construction project is largely exposed to much more risk events over the project life cycle due to its complexity and size than the other industries. Therefore, the construction risk management process to identify and response the risk events is not only performing acutely but also proceeding systematically. The risk identification phase in the risk management process is to identify various risk events and define its characteristics. At this phase, the risk identification system is very useful tool to identify every possible risk events in the project. This study shows some problems of the existing risk identification system and proposes the modified risk identification system based on the project phases and the contract bodies, and also suggests partial but more enough detailed risk checklists to be implemented in the actual risk identification phase than any other existing risk breakdown systems to be examined at this study.

System Assurance and Safety Assessment Activities of Urban Marglev ATC Project based on IEC Standards (IEC 규격에 기반한 도시형자기부상열차 열차제어시스템의 시스템보증 및 안전성 평가 활동)

  • Baek, Young-Goo;Park, Hee-Jun;Gu, Jung-Suh;Seo, Do-Seok;Lee, Key-Seo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1669-1679
    • /
    • 2010
  • Related to the on-going "Train Control System Project of Pilot Line Construction for Urban MAGLEV Train", activities by each phase shall be conducted to achieve SIL4 level and obtain safety certification from the Independent Safety Assessment(ISA), based on the IEC standards((IEC 62278/62279 and IEC 62425) for the first time in Korea. This thesis describes the introduction of IEC standards, system assurance activities (such as plan, analysis, test, verification and validation) in compliance with requirements management and project life-cycle and relations with the safety assessment activities; and certification activities (such as document reviews and audits) through system RAMS activities, software quality assurance activities and safety assessment, for the purpose of achieving a successful safety certification at the time of completing the project as system assurance activities including software and safety certification activities in order to acquire the safety certification for train control system which does not exist at all in domestic cases. It is believed that overall system safety assurance activities in this project will contribute to develop more upgraded products of the domestic train control system on the quality and safety point of view, find overseas markets and establish a bridgehead in the future.

  • PDF

Time-Dependent Degradation Model and Maintenance Cost of Rail line PC Beam Bridge in Project Level (Project level에서의 철도 PC Beam교량의 경년열화모델구성 및 유지관리비용 추정)

  • Kwon, Se-Gon;Park, Mi-Yun;Do, Jeong-Yun;Kim, Do-Kie
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.17-22
    • /
    • 2008
  • Construction project have extremely high risk in the process of construction owing to unexpected event, like as design amendment. As a result, owner have to endure enormous extra-cost to control the risk and continue to the project having more higher uncertainty. Also, if the structure is completed, it is needed that the structure is protected and maintained continuously during life cycle time to satisfying original aim of structure itself. LCC analysis to calculate cost of structure alternatives divides into two stage, one is design_LCC and the other is maintenace_LCC. But two stages all is needed in the transition deterioration model to calculate more reasonable LCC analysis. This paper developed the model using analysis of FMS contents and survey from professional about Prestressed concrete beam girder bridge(PC Beam bridge)in railway. The model is focused in project level of PC beam because any condition state information for element level analysis can not get up. This paper is intended to use the developed model in LCC analysis of PC Beam bridge in railway and constitute the foundation to perform more deep study in the near future.

  • PDF

ANALYSIS AND IMPROVEMENT OF FINISHING WORK PROCESS FOR COST MANAGEMENT (FOCUSED ON INDOOR FINISHING WORK OF APARTMENT)

  • Hoon-Ku Lee;Yoon-sun Lee;Ja-Young Yoon;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.711-720
    • /
    • 2007
  • Apartment housing in the Korean domestic construction industry has had various and high-quality finishing work since the enforcement of price deregulation in 1998. Before the enforcement of price deregulation, feasibility studies of housing projects have not had particular difficulties as uniform description of finishing work items were reflected and finishing work cost also was equalized. However, the recent distinction of finishing work based on the same floor plan brings about project cost variation, along with many effects on construction management due to project cost increment. Accordingly, this paper suggests the improved plan of cost management to control the feasibility study result consistently during the life cycle of a project through an analysis based on cost management phase due to cost blackout, appearing at the commencement of a project, cost gradation caused by high-quality finishing work item, and cost reduction due to the degradation of finishing work after analysis of current apartment construction process focused on finishing work using the IDEF process analysis technique.

  • PDF

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

A Software Manpower Profile for Software Development Life Cycle (소프트웨어 개발 라이프사이클 인력 프로파일)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.11D no.5
    • /
    • pp.1123-1132
    • /
    • 2004
  • Successful project planning relies on a good estimation of the manpower required to complete a project. The good estimation can be derived from Rutnam's Rayleigh Model or Phillai et al.'s Gamma Model. These models only can be applied for the projects which the need of manpower is increased exponentially and the highest of manpower is required at the end of development phase. However, in a practical project, most manpower is required during development phase and a small amount of manpower is assigned during maintenance phase. In addition, the Waterfall Model and Unified Process only can be adopted for development phase. So the current development environments cannot be adopted into the existing manpower distribution models which the highest manpower is required at the end of development phase. This paper suggests an appropriate model for development phase to solve this problem. First, the appropriate manpower distribution for development phase of the Waterfall model was derived from Putnam's manpower distribution and then manpower distribution of development phase was derived for Unified Process. After comparing the required manpower of two Processes, total manpower distribution is similar each other even though the required manpower and task is different for each point of development phase. From this result, a unified model is derived and it can be applied for both development processes.

A Software Estimating Model for Development Period (소프트웨어 개발기간 추정 모델)

  • 이상운
    • Journal of KIISE:Software and Applications
    • /
    • v.31 no.1
    • /
    • pp.20-28
    • /
    • 2004
  • Estimation of software project cost, effort, and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of development effort and duration estimation models presented by regression model of simple relation function point vs. effort and effort vs. duration instead of considering developer's productivity. But different project have need for different effort according to developer's productivity if the projects are same software size. Also, different duration takes according to developer's productivity if the projects require the same effort. Therefore, models that take into account of productivity have a limited application in actual development project. This paper presents models that can be estimate the duration according to productivity in order to compensate a shortcoming of the previous models. Propose model that could presume development period by various methods based on productivity and compared models' performance. As a result of performance comparison, an estimating model of development period from software size got simple and most good result. The model gives decision-making information of development duration to project management in the early stage of software life cycle.

Analysis of Greenhouse Gas Emission Factor in Construction Project (건설공사의 온실가스 배출영향요인 분석)

  • Kim, Tae-Yeong;Park, Hee-Sung
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2013.05a
    • /
    • pp.433-434
    • /
    • 2013
  • 본 연구는 건설공사의 온실가스 배출영향요인을 건설공사의 생애주기(Life Cycle)별로 제시하였다. 이를 위해, 건설공사의 생애주기를 4단계로 구분하였으며, 각 단계의 온실가스 배출에 대한 자료조사와 선행연구 분석을 통해 영향요인을 도출하였다. 따라서 본 연구는 건설공사의 온실가스 배출량 산정을 위한 기초적인 자료로 활용이 기대된다.

  • PDF

XPS DOCUMENTS AND THEIR APPLICATIONS IN THE CONSTRUCTION INDUSTRY

  • N. O., Nawari
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.417-423
    • /
    • 2007
  • This paper describes how using the XPS Document technologies of Windows Vista support and enhances interactions with the structural design and construction process. It illustrates the document workflows and the document life cycle in a typical construction base knowledge system. It provides engineers and decision makers and implementers with information about this new technology and how they can apply it to their design and construction models. The paper also highlights opportunities for the new format of data exchange in the recent efforts to develop National Management System Standards for Transportation Applications to benefit from these emerging technologies.

  • PDF