Browse > Article

A Development of the Risk Identification Checklist through the Re-establishment of Risk Breakdown Structure of Construction Project  

Chu Hae-Keum (강원대학교 대학원)
Kim Seon-Gyoo (강원대학교 건축학부)
Publication Information
Korean Journal of Construction Engineering and Management / v.4, no.2, 2003 , pp. 109-117 More about this Journal
Abstract
The construction project is largely exposed to much more risk events over the project life cycle due to its complexity and size than the other industries. Therefore, the construction risk management process to identify and response the risk events is not only performing acutely but also proceeding systematically. The risk identification phase in the risk management process is to identify various risk events and define its characteristics. At this phase, the risk identification system is very useful tool to identify every possible risk events in the project. This study shows some problems of the existing risk identification system and proposes the modified risk identification system based on the project phases and the contract bodies, and also suggests partial but more enough detailed risk checklists to be implemented in the actual risk identification phase than any other existing risk breakdown systems to be examined at this study.
Keywords
Risk; Risk Management; Risk Identification System; Risk Event; Checklist;
Citations & Related Records
연도 인용수 순위
  • Reference
1 홍성호,손창백,박찬식,‘대형건설회사 자제안전평가 모형 개발’ , 대한건축학회 논문집 제18권 11 호 pp.117-124,2002
2 PFI, 'How to Construct a Public Sector Construction-risk Analysis', 1997
3 Shou Qing Wang, Robert L. K. Tiong , 'Evaluation and Management of Political Risks in China's BOT Project, Journal of Construction Engineering and Management, May/June, ASCE, pp.242-250, 2000
4 김상수, 황문환, 김용수, 최인성, '건설공사의 하도급 리스크관리 모델개발에 관한 연구'. 대한건축학회 논문집 제14권 8호, pp 115-123, 1998
5 이재열,전영일,’건축공종분류체계의 주제배열의 논리성 비교’, 대한건축학회 논문집 14권 8호, p.80, 1998
6 Chris Chapman & Stephen Ward, 'Project Risk Management, Process, Techniques, and insight', Wiley, p.16, 1997
7 B. Mullholland and J. Christian, 'Riskassessment in Construstion Schedule', Journal of Construction Engineering and Management, January/February, ASCE, pp.8-15, 1999
8 FTA, Publication No. DOT-T-95-01, RiskAssessment in Fixed Guideway Transit System Construction, 1994
9 윤희수,'인지언어학의 설명력 ', 언어과학연구 Vol.16.언어과학회, pp.327-352, 1999
10 김인호, ‘건설사업의 리스크관리 ‘, 기문당, pp.77-81, 2001
11 N. J. Smith, 'Management Risk in Construction Project', Blackwell Science, pp.151-154, 1998
12 이재열,'건설정보 분류체계의 개념적 기반에 관한 연구' , 대한건축학회 논문집(계획계) 16권 11호, pp.3-10. 2000
13 PMI Standards Committee, 'A Guide to the Project Management Body of Knowledge' , Project Management Institute, pp.E3-E4, 1987
14 김선규, 'VaR 개념을 응용한 위험허용도 중심의 건설공사 위험대응 프로세스 모델', 한양대학교 박사학위논문, 2001
15 정동욱,현장택, 김양택,‘건설공사 사전계획단계에서 리스크 식별 프로세스에 관한 연구’ , 대한건축학회 학술발표논문집 제20권 저11호,pp.469-472, 2000