• Title/Summary/Keyword: Project Delay

Search Result 282, Processing Time 0.023 seconds

Screening of Korea Traditional Herbal Medicines with Inhibitory Activity on Advanced Glycation End Products (AGEs) Formation (한약재의 최종당화산물 생성저해활성 검색)

  • Jang, Dae-Sik;Lee, Yun-Mi;Kim, Young-Sook;Kim, Jin-Sook
    • Korean Journal of Pharmacognosy
    • /
    • v.37 no.1 s.144
    • /
    • pp.48-52
    • /
    • 2006
  • Advanced glycation end products (AGEs) are largely involved in the pathogenesis of diabetic complications. As part of our ongoing project directed toward the discovery of preventive and/or delay agents for diabetic complications from natural sources, 92 Korean traditional herbal medicines have been investigated with an in vitro evaluation system using AGEs inhibitory activity. Of these, 17 herbal medicines exhibited a significant inhibitory activity against AGEs formation. Particularly, 9 herbal medicines, i.e., Cinnamomi Cortex, Artemisiae Argyi Herba, Ammoni Tsao-ko Fructus, Menthae Herba, Amomi Semen, Polygoni Avicularis Herba, Lycopi Herba, Salviae Radix, and Nelumbinis Semen showed more potent inhibitory activity (2-4 fold) than the positive control aminoguanidine.

Process Progress Pattern Analysis based on Daily Work Report Analysis (작업일보 데이터 분석 기반 공정 진척 패턴 분석)

  • Ko, Yong-Ho;Shin, Young-Keun;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.156-157
    • /
    • 2016
  • Construction projects have shown a dramatic increase in size and complexity during the recent years that precise management has been recognized as one of key factors leading the project to success. It has been investigated that management in construction sites is generally done based on the experience of site engineers. Such experience based decision making lacks reliability that could bring disastrous results such as delay and cost overruns. The purpose of this study is to suggest a process progress pattern analysis method that is expected to be used as an objective reference for site managers to aid the decision making done regarding process progress management.

  • PDF

Improvement of Channel Efficiency in Mobile Communications by User Relay Scheme

  • JIA, Zhongning;MUTSUURA, Kouichi;AKIZUKI, Osamu;CHIN, YoonTze;HANDA, Shiro;OSHITA, Shinjiro
    • Proceedings of the IEEK Conference
    • /
    • 2002.07c
    • /
    • pp.1447-1450
    • /
    • 2002
  • In this paper, we propose a new access method named UR (Use. Relay) scheme to improve the channel efficiency in mobile communications. In UR scheme, packets of a data terminal that do not demand real time communications are relayed by other terminals during their inactive periods, which ue communicating with the base station through a fixed channel at that time. Simulation results show that with UR scheme, the blocking probability md the throughput are improved considerably with an allowable increase in the average delay.

  • PDF

Application of BIM Elements for Owner's Decision - Making Support (발주자 참여 확대를 위한 BIM 적용요소에 관한 연구)

  • Lee, Kyung-Ha;Park, Jae-Hyun;Cho, Sung;Cho, Yong;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.185-188
    • /
    • 2009
  • Recently clients requirements and social requirements are complex and large sized in construction projects. Futhermore, processes and steps are more complexed than before. Unsuitable reflection of clients brings mistaken opinions. A phase of middle change makes delay and change. It brings problems of waste expense and time. 80, first stage of planning and schematic design processes have to reflect of clients opinion actively. by increasing of constructions project competitiveness. Recently, BIM(Building Information Modeling is being researched frequently. Through visualization of information proceed step by step and it helps cognition of adapting information. 80, this paper finds and suggests solution of reflecting clients opinion and requirements and non professional clients and positively support of client participation watching based on BIM.

  • PDF

Estimatiom of Noise Effects of High Speed Train on Conventional Line (고속전철의 기존선 운행시 소음평가)

  • Na, Hee-Seung;Lee, Hi-Seng;Kim, Ki-Hwan;Yang, Sin-Chu;Choe, Kang-Youn;Hyun, Seung-Ho
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.518-523
    • /
    • 2000
  • As the delay of the Kyungbu High Speed Railroad, HST should use conventional line through Daegoo to Pusan until the new railroad build. High speed railroad noise is one of the main causes of environmental impact. Whenever HST on conventional railroad line is planned or a housing project near an existing railroad is proposed, an estimate of the relevant noise levels is usually required. For this, it is necessary to Quantify those parameters that affect the railroad noise. This paper deals with an estimation of high speed railroad noise on conventional line.

  • PDF

Human resource planning for authorized inspection activity

  • Lee, Seung-hee;Field, Robert Murray
    • Nuclear Engineering and Technology
    • /
    • v.51 no.2
    • /
    • pp.618-625
    • /
    • 2019
  • When newcomer countries consider a nuclear power programme, it is recognized that the most important organizations are the Nuclear Energy Programme Implementing Organization (NEPIO), the regulator, and an operating organization. Concerning the number of construction delays these days, one of the essential organizations is an Authorized Inspection Agency (AIA). According to World Nuclear Industry Status Report, all of the reactors under construction in eight out of the thirteen countries have experienced delays. Globally, the Flamanville 3 project and Sanmen Unit 1 are 6.5 years and 5 years late respectively. One of the major reasons of delay is due to inappropriate manufacturing and inspection on safety class components. The recommendations are made to develop such an organization: (i) find existing inspection organizations in relevant industries, (ii) contract with expatriates who have experience on nuclear inspection, (iii) develop a legislative framework to authorize the inspection organization with enforcement, (iv) include a contract clause in the BIS for developing the AIA, (v) hold training programmes from vendor country, (vi) during manufacturing and construction, domestic AIA shall be involved.

CONFIGURATION METHOD OF HEALTH & SAFETY RULE FOR IMPROVING PRODUCTIVITY IN CONSTRUCTION SPACE BY MULTI-DIMENSION CAD SYSTEM

  • Hyoun-Seok Moon;Leen-Seok Kang;Nashwan Dawood;Sang-Bok, Ji
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1161-1165
    • /
    • 2009
  • Safety of workers and productivity in construction site are affected according to the conflict status of work spaces which are performed at a time. The interference among the work spaces in construction site should be minimized because it becomes a blocking factor that causes construction delay and low productivity. Those factors can be managed by reasonable H&S (Health & Safety) practice. This research suggests the requirements of H&S practice and rules to establish the strategy of H&S management based on the literature reviews related to H&S rule. The suggested H&S rule can be visualized for searching space conflict point if the rule is linked with visual simulation tool. Accordingly the research results can be used for improving and visualizing construction productivity by work space control in 4D/nD CAD system.

  • PDF

ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

  • Kamran M. Nemati
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.886-891
    • /
    • 2005
  • The frequent maintenance required on some asphalt concrete (AC) pavement sections has made reconstruction with Portland Cement Concrete Pavement (PCCP) a feasible alternative. However, many constructability issues need to be addressed in order to realize the full potential of this alternative. Accelerated paving encompasses three classes of activities: methods to accelerate the rate of strength gain, methods to minimize the construction time, and traffic control strategies to minimize user delay. Three major AC intersections with severe rutting problems were reconstructed with PCCP. The entire reconstruction of each intersection, including demolition of the AC pavement and its replacement with PCCP, took place over a period of three days, starting on Thursday evening and opening the intersection to the traffic on Sunday afternoon. This paper discusses the use of PCCP for accelerated reconstruction of major urban intersections with minimal user and traffic disruption, using innovative construction techniques and traffic management optimization principles and demonstrates that concrete pavements can be constructed efficiently and quickly.

  • PDF

OFFICIAL DEVELOPMENT ASSISTANCE 'ODA' AND HUMAN RESOURCE DEVELOPMENT IN THE CONSTRUCTION INDUSTRY OF A DEVELOPING COUNTRY

  • Rajendra Niraula;Yoichi Hirota;Shunji Kusayanagi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.956-961
    • /
    • 2005
  • Delay, cost overrun and inferior quality in public works are common in Nepal and Cambodia. Almost 90 percent of the civil construction engineers working in the industry were one-degree graduates without appropriate training. The civil engineering education had provided elemental engineering knowledge to the graduates however integrated engineering and management knowledge and skill are essential for efficient infrastructure development. ODA in developing countries had been concentrated in hard infrastructure development without improving the quality of higher education. Integrating ODA to engineering education system would help develop qualified technical manpower and appropriate technology domestically, and improve the efficiency in infrastructure development in developing countries.

  • PDF

A Study of Complaint and Conflict Factors in Construction Projects (건설사업의 민원 및 갈등 요인 도출에 관한 연구)

  • Lee, Ju-Hui;Mun, Jun-bu;Lee, Chang-jun;Yun, Sung-min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.279-280
    • /
    • 2021
  • The conflict is gradually increasing and becoming more serious in Korea. Especially, there are many conflict among stakeholders in public construction projects and its economic, social effects are enormous. This negatively affects the performance of construction projects, such as schedule delay and increasing construction costs. Complaints are often extended to public conflicts so that complaints have to be considered for conflict management. However, complaints and conflicts were distinguished and have been studied differently in previous studies. In this research, the literature that analyzed complaints and conflict factors was reviewed, and the complaint that included the conflict factors were categorized and derived.

  • PDF