Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

Establish of Evaluation level in Public Management System using Policy Evaluation Framework in Urban Renewal Project (정책평가 틀을 이용한 도시정비사업 내 공공관리자제도의 평가기준 수립에 관한 연구)

  • Lee, Jeong Jae;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.5955-5967
    • /
    • 2015
  • This study targets to recognize needs of adopting public management system in Urban Renewal Project. and to establish evaluation level of public management system using policy evaluation framework for establishing perspective and systemic level. Also, this study constructed basic principles as expanded concept like Public, expertise, participation, rationality, and sustainability based on previous studies and expert opinion. AHP analysis results are following. In case of upper level, post management and continuity are important factors. Also in case of under level, making stable economic system, honest operating system, reducing development costs, local development with self-sufficiency were important factors. through empirical results, the implications are following. First, public management system needs to develop a consistent principle from planning step to post management. Second, it is essential point that continuous retraining between involved people and drawing residents participate in progress activity. Third, when evaluating public management system, it is need that emphasize non-physical factor like conflict issue between stakeholder.

Analysis of User Requirements for Development of Vessel Traffic Services Cloud System (선박교통관제 클라우드 시스템 개발에 따른 사용자 요구사항 분석)

  • Lee, Li-Na;Kim, Joo-Sung;Lee, Hong-Hoon;Lee, Jin-Suk;Namgung, Ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.2
    • /
    • pp.314-323
    • /
    • 2022
  • Vessel Traffic Services (VTS) operators perform traffic management tasks using VTS systems and sensor equipment designated as VTS facilities to promote the safety and efficiency of vessel traffic. The necessary VTS information for effective operations could be obtained through the additional access of various information channels other than the designated VTS facility. To unify these various information access windows, the development of the VTS cloud system is in progress. In this study, the operational information analysis for VTS was performed through VTS tasks-facility linkage analysis to identify the user required information according to the introduction of the VTS cloud system. The VTS task analysis was performed through research of the international and domestic literature, and expert interviews. The necessary information were identified and linked according to the VTS facilities. As a result of the analysis, 37 categories of necessary information were identified for internal and external information windows, and 8 information windows were selected other than the present VTS equipment. The identified user requirements would be applied to the structure design of the VTS cloud system. In the future, it is necessary to update user requirements through scenario-based user operation analysis and to conduct additional research on the system interface design.

The Development of Education Model for CA-RP(Cognitive Apprenticeship-Based Research Paper) to Improve the Research Capabilities for Majors Students of Radiological Technology (방사선 전공학생의 연구역량 증진을 위한 인지적 도제기반 논문작성 교육 모형 개발)

  • Park, Hoon-Hee;Chung, Hyun-Suk;Lee, Yun-Hee;Kim, Hyun-Soo;Kang, Byung-Sam;Son, Jin-Hyun;Min, Jung-Hwan;Lyu, Kwang-Yeul
    • Journal of radiological science and technology
    • /
    • v.36 no.2
    • /
    • pp.99-110
    • /
    • 2013
  • In the medical field, the necessity of education growth for the professional Radiation Technologists has been emphasized to become experts on radiation and the radiation field is important of the society. Also, in hospitals and companies, important on thesis is getting higher in order to active and cope with rapidly changing internal and external environment and a more in-depth expert training, the necessity of new teaching and learning model that can cope with changes in a more proactive has become. Thesis writing classes brought limits to the in-depth learning as to start a semester and rely on only specific programs besides, inevitable on passive participation. In addition, it does not have a variety opportunity to present, an actual opportunity that can be written and discussed does not provide much caused by instructor-led classes. As well as, it has had a direct impact on the quality of the thesis, furthermore, having the opportunity to participate in various conferences showed the limitations. In order to solve these problems, in this study, writing thesis has organized training operations as a consistent gradual deepening of learning, at the same time, the operational idea was proposed based on the connectivity integrated operating and effective training program & instructional tool for improving the ability to perform the written actual thesis. The development of teaching and learning model consisted of 4 system modeling, scaffolding, articulation, exploration. Depending on the nature of the course, consisting team following the personal interest and the topic allow for connection subject, based on this, promote research capacity through a step-by-step evaluation and feedback and, fundamentally strengthen problem-solving skills through the journal studies, help not only solving the real-time problem by taking wiki-space but also efficient use of time, increase the quality of the thesis by activating cooperation through mentoring, as a result, it was to promote a positive partnership with the academic. Support system in three stages planning subject, progress & writing, writing thesis & presentation and based on cognitive apprenticeship. The ongoing Coaching and Reflection of professor and expert was applied in order to maintain these activities smoothly. The results of this study will introduce actively, voluntarily and substantially join to learners, by doing so, culture the enhancement of creativity, originality and the ability to co-work and by enhance the expertise of based-knowledge, it is considered to be help to improve the comprehensive ability.

A Study on the Improvement for Practical Application of Cultural Impact Assessment System (문화영향평가제도의 현실적 적용을 위한 개선방안 연구)

  • Ko, Jeong-Min;Park, Ji-Hye
    • Review of Culture and Economy
    • /
    • v.20 no.1
    • /
    • pp.51-80
    • /
    • 2017
  • This study aims to analyze various issues and problems in the implementation process of cultural impact assessment in 2016. As a result of the analysis, it is found that the evaluation index of the cultural impact assessment is difficult to understand, and the referring data and materials in the evaluation planning phase in the process of the cultural impact assessment are deficient, and the evaluation planning is based on surveys rather than various methods. And there are some problems with evaluation scales and weighting, and they are focused on the evaluation itself rather than the feedback of the evaluation results. Therefore, this study suggests that, in the evaluation planning phase, the different methods of comparing the evaluation results according to the project execution, the project progress, and the completion time of the project should be adopted, and the project manager and the evaluation group participate developing the evaluation indicators together, and methodology for identifying causal relationship such as system dynamics will be adopted. In the stage of evaluation, it is necessary to introduce various methodology such as diverse residents participation, abundant case study, application of quantitative methodology, and the utilization of expert evaluation teams. In the evaluation feedback stage, it is necessary to provide thorough consulting based on the evaluation results.

Towards a Transportation Support System for Off-site Construction : Identifying Key Functions and Diagramming Functional Blocks (오프사이트건설(Off-site Construction) 운반 시스템을 위한 핵심기능 도출 및 시스템 기능 전개도 개발)

  • Lee, Gangho;Kim, Minguk;Lee, Chansik;Koo, Choongwan;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.21-30
    • /
    • 2021
  • The existing construction industry is classified into industries with low productivity compared to other industries. In order to solve the decline in productivity in the construction industry, the world is focusing on off-site construction (OSC), which is about 40% more productive than existing construction methods. This high productivity is possible because the three stages of production, transport to the site, and site assembly are consistently maintained in a continuous flow. This study conducted a functional survey through literature review, preliminary field survey, questionnaire, and expert interview. The surveyed function were classified into five categories: convenience, flexibility, manageability, communication, and safety, and the functional characteristics of flexibility, manageability, and communication were high. Because of the change according to the construction progress, the production schedule of the factory, and the variety of transportation time required. Finally, A functional block diagram was developed based on the 15 functions corresponding with an average score of 4 or more in the surveyed function score result. If the OSC transport system is established through this study, It can contribute to a successful construction OSC project and increase productivity.

Development of Risk Assesment Index for Construction Safety Using Statistical Data (통계자료를 활용한 건설안전 위험도 평가지수 개발)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.4
    • /
    • pp.361-371
    • /
    • 2019
  • In 2017, the ratio of the number of victims and deaths in the construction industry was the highest with 25.2% and 29.6%, respectively. Especially, as safety accidents at construction sites continue to increase, the economic loss is greatly increased too. Therefore, in order to prevent safety accidents in the construction work, the safety risk assessment index by type of construction was developed, and the main results of this study are as follows. First, 17 factors related to safety accidents at construction sites were derived through survey and interview survey, and this study suggested 9 items(process, type of construction, progress rate, contract amount, number of floors, safety education, working days and weather) throughout the expert advisory meeting. Second, the risk assessment index for safety accidents was developed based on the ratio and intensity of safety accidents. Third, to verify the risk assessment model, the construction safety risk assessment index by type of construction was derived by surveying and analyzing the statistics of the construction accident. In addition, the risk strength was calculated by dividing human damage caused by construction safety accidents into those killed and injured. The risk assessment index based on the frequency and intensity of safety accidents by type of construction is expected to be utilized as basic data when assessing the risk of similar projects in the future.

Checklist for the application of concurrent engineering in bridge construction (교랑 공사에 동시공학 적용을 위한 체크리스트 도출)

  • Park, Seaman;Park, Taeil;Kim, Hyoungkwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.3-11
    • /
    • 2013
  • As construction projects became larger and longer, the need for the construction technologies and innovative construction processes has been continuously increased in construction field. In response to this trend, construction industries tried to adopt the concurrent engineering which had been normally applied for manufacturing industries to develop the products with improved quality in a reduced time. However, the application of the concurrent engineering to construction field was limited due to the lack of advanced management system and incomplete theoretical backgrounds. In this regard, this study attempted to develop a checklist for the successful application of concurrent engineering to bridge projects. To this end, this study presents the checklist for the application of concurrent engineering to construction projects. Further, the checklist was modified and updated to reflect the specific feature of the bridge construction using expert interviews. With the help of additional 188 experts, a questionnaire-based survey was also conducted to validate the checklist. In addition, using importance-performance analysis(IPA), the study identified the factors needed for intensive improvement. Consequently, the proposed checklist is expected to be useful, because it improves the applicability of the concurrent engineering in that it enables managers to monitor construction progress and further to protect the project from potential risks.

Progress of Composite Fabrication Technologies with the Use of Machinery

  • Choi, Byung-Keun;Kim, Yun-Hae;Ha, Jin-Cheol;Lee, Jin-Woo;Park, Jun-Mu;Park, Soo-Jeong;Moon, Kyung-Man;Chung, Won-Jee;Kim, Man-Soo
    • International Journal of Ocean System Engineering
    • /
    • v.2 no.3
    • /
    • pp.185-194
    • /
    • 2012
  • A Macroscopic combination of two or more distinct materials is commonly referred to as a "Composite Material", having been designed mechanically and chemically superior in function and characteristic than its individual constituent materials. Composite materials are used not only for aerospace and military, but also heavily used in boat/ship building and general composite industries which we are seeing increasingly more. Regardless of the various applications for composite materials, the industry is still limited and requires better fabrication technology and methodology in order to expand and grow. An example of this is that the majority of fabrication facilities nearby still use an antiquated wet lay-up process where fabrication still requires manual hand labor in a 3D environment impeding productivity of composite product design advancement. As an expert in the advanced composites field, I have developed fabrication skills with the use of machinery based on my past composite experience. In autumn 2011, the Korea government confirmed to fund my project. It is the development of a composite sanding machine. I began development of this semi-robotic prototype beginning in 2009. It has possibilities of replacing or augmenting the exhaustive and difficult jobs performed by human hands, such as sanding, grinding, blasting, and polishing in most often, very awkward conditions, and is also will boost productivity, improve surface quality, cut abrasive costs, eliminate vibration injuries, and protect workers from exposure to dust and airborne contamination. Ease of control and operation of the equipment in or outside of the sanding room is a key benefit to end-users. It will prove to be much more economical than normal robotics and minimize errors that commonly occur in factories. The key components and their technologies are a 360 degree rotational shoulder and a wrist that is controlled under PLC controller and joystick manual mode. Development on both of the key modules is complete and are now operational. The Korean government fund boosted my development and I expect to complete full scale development no later than 3rd quarter 2012. Even with the advantages of composite materials, there is still the need to repair or to maintain composite products with a higher level of technology. I have learned many composite repair skills on composite airframe since many composite fabrication skills including repair, requires training for non aerospace applications. The wind energy market is now requiring much larger blades in order to generate more electrical energy for wind farms. One single blade is commonly 50 meters or longer now. When a wind blade becomes damaged from external forces, on-site repair is required on the columns even under strong wind and freezing temperature conditions. In order to correctly obtain polymerization, the repair must be performed on the damaged area within a very limited time. The use of pre-impregnated glass fabric and heating silicone pad and a hot bonder acting precise heating control are surely required.