Checklist for the application of concurrent engineering in bridge construction  

Park, Seaman (나한리더스(주))
Park, Taeil (연세대학교 토목공학과)
Kim, Hyoungkwan (연세대학교 토목공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.14, no.1, 2013 , pp. 3-11 More about this Journal
Abstract
As construction projects became larger and longer, the need for the construction technologies and innovative construction processes has been continuously increased in construction field. In response to this trend, construction industries tried to adopt the concurrent engineering which had been normally applied for manufacturing industries to develop the products with improved quality in a reduced time. However, the application of the concurrent engineering to construction field was limited due to the lack of advanced management system and incomplete theoretical backgrounds. In this regard, this study attempted to develop a checklist for the successful application of concurrent engineering to bridge projects. To this end, this study presents the checklist for the application of concurrent engineering to construction projects. Further, the checklist was modified and updated to reflect the specific feature of the bridge construction using expert interviews. With the help of additional 188 experts, a questionnaire-based survey was also conducted to validate the checklist. In addition, using importance-performance analysis(IPA), the study identified the factors needed for intensive improvement. Consequently, the proposed checklist is expected to be useful, because it improves the applicability of the concurrent engineering in that it enables managers to monitor construction progress and further to protect the project from potential risks.
Keywords
Concurrent Engineering; Bridge; Fast track; Importance-performance analysis(IPA);
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 강인석.김현수.박서영.문현석 (2006). "Fast Track을 적용한 축구전용경기장 표준공정표 구성연구."대한토목학회 정기 학술대회, pp.3769-3772.
2 김봉춘 (2009). 동시공학을 적용한 제품디자인 프로세스 개발에 관한 연구, 석사 학위논문, 경기대학교.
3 남규헌.송성진 (2000). "동시공학 경영혁신 이론과 사례에 관한 연구, 대한건축학회논문집."제16권, 제12호, pp. 183-193
4 박성희 (2003). 미디어인터뷰, 나남출판사, pp.15-24.
5 이복남 (1997)." 패스트트랙 방식과 건설사업의 경제성, 건설산업동향."한국건설산업연구원, 제12호, pp. 1-11.
6 최도승.이재섭 (2007). "동시공학을 통한 공기단축 의사결정 모델, 한국건설관리학회논문집."제8권 제6호, pp. 197-206.   과학기술학회마을
7 최상화.임태경.이두진, 이동은 (2009). "진보형 동시시공 시뮬레이션 일정 시스템."한국건설관리학회 학술발표대회 논문집, pp.682-686.
8 한진택.이재섭(2009)." 건설공사설계단계에서의동시공학적용을 위한 시뮬레이션 모델."한국건설관리학회논문집, 제 10권 제3호, pp.102-110.
9 현창택.조규만 (2007). "설계시공일괄입찰사업에서 패스트트랙 성공요인에 관한 연구."대한건축학회지, 제23권 제 1호, pp.129-136.   과학기술학회마을
10 Bogus, S.M., Molenaar, K.R. and Diekmann, J.E. (2005). "A concurrent engineering approach to reducing design delivery time."Journal of Construction engineering and management, 131(11), pp.1179-1185.   DOI   ScienceOn
11 Krishnan, V., Eppinger, S.D., and Whitney, D.E. (1995). "Accelerating product development by the exchange of preliminary product design information."Journal of Mechanical Design, 117(4), pp.491-498.   DOI
12 Krishnan, V., Eppinger, S.D., and Whitney, D.E. (1997). "A model-based framework to overlap product development activities."Management Science, 43(4), pp.437-451.   DOI   ScienceOn
13 Maheswari, J.U., Vargehese, K., and Sridharan, T. (2006). "Application of dependency structure matrix for activity sequencing in concurrent engineering." Jounrnal of Construction Engineering and Management, 132(5), pp.482-490.   DOI   ScienceOn
14 Martilla, J.A., and James, J.C. (1977.) "Importanceperformance analysis", Journal of Marketing, Vol. 41, No. 1, pp.77-79.   DOI   ScienceOn
15 Prasad, B.(1996). Concurrent engineering fundamentals: Integrated product and process organization, Prentice Hall, Upper Saddle River, N.J.
16 Yassine, A.A., Chelst, K.R., and Falkenburg, D.R. (1999). "A decision analytic framework for evaluating concurrent engineering."IEEE transactions on engineering management, 46(2), pp.144-157.   DOI   ScienceOn