• Title/Summary/Keyword: Production equipment

Search Result 1,215, Processing Time 0.029 seconds

Present Condition and Development of Mechanical Utility System for Modular Construction (모듈러 건축용 기계설비 시스템 현황 및 개발에 관한 연구)

  • Lee, Jae-Soo;Choi, Jun-Sok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.19-20
    • /
    • 2016
  • Domestic construction industry has experienced many difficulties as it has been on a downward. It's a way that active modular structure market to solve this problem. However, as Modular structure technical standard in Korea is in the early stages, our modular factory maufactured rate is almost 40% lower than overseas. Besides, there is less design diversity so it just applies for a few buildings like low-rise building and general group barrackes. To deal with these problems, it is essential to modulating the equipment which can improve the production rate. This will help to ensure the quality, shortening of the construction period, the reduction of labor costs. We have defined the name of segmented by each installation location of the equipment to modulating equipment. And it was examined the suitability of the modulating of the location-specific utility system. The results of the analysis are discussed on the page.

  • PDF

Development Status of High Enthalpy Plasma Equipment (전북대 고온플라즈마 설비 구축 및 응용연구 소개)

  • Choi, Chea-Hong;Lee, Mi-Yun;Kim, Min-Ho;Hong, Bong-Guen;Seo, Jun-Ho
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2011.11a
    • /
    • pp.694-696
    • /
    • 2011
  • The high enthalpy plasma research center in Chonbuk national university is under construction for four types of plasma equipments. The equipments are 1set of 0.4 MW class enhanced Huels type plasma equipment, 1 set of 2.4 MW class enhanced Huels type plasma quipment, 1 set of 60 kW RF plasma equipment and 1 set of 200 kW RF plasma equipment. 60kW RF plasma system is R&D and pilot scale production equipment of nano powder synthesis and plasma spray coating. 200kW RF plasma system is mass production equipment with high power capacity of nano powder synthesis. 0.4MW plasma system can be applied to the ground test facility for material testing under re-entry conditions for space vehicles.

  • PDF

Study on Simulation of Subsea Production System (Subsea 생산 시스템 시뮬레이션에 관한 연구)

  • Park, Ju Yong;Jo, Hyo Jae;Lee, Seung Jae
    • Journal of Ocean Engineering and Technology
    • /
    • v.27 no.3
    • /
    • pp.1-7
    • /
    • 2013
  • The purpose of this study was the implementation of a simulation for a subsea production system. This subsea production system is installed under environments with high pressure and low temperature. Most of the processes for oil and gas production occur in the subsea equipment. Therefore, an understanding and study of subsea production systems is very difficult because people cannot directly observe the processes occurring in the subsea production system. A simulation system can be a useful solution for this difficult problem. In this research, information models and a 3-D graphic model of the subsea equipment were built using the object-oriented technology and 3-D CAD. The entire system was implemented with the help of simulation software, 3-DVIA Virtools. The simulation system for the subsea production system was tested using several production process scenarios. The results of the tests showed that the simulation system is very useful for understanding a subsea production system and could be a good educational tool.

Development of Biodiesel Production Equipment from Animal Fats and Consideration for Reaction Condition of Animal Biodiesel (동물성 유지를 원료로 한 바이오 디젤 제조 장치 개발 및 바이오 디젤의 반응조건 고찰)

  • Kim, Yong Hun;Cho, Young Hak
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.22 no.1
    • /
    • pp.119-124
    • /
    • 2013
  • In this paper, we analysed fatty acid methyl ester contents in the biodiesel which is produced from the newly developed biodiesel production equipment. The lard oil was used as the raw material through various experimental conditions. Thirty one experiments were conducted, which were based on the experimental conditions that designed by central composite design method. The effects of four independent variables, including reaction temperature, reaction time, oil to methanol molar ratio, and catalytic amount, were investigated at five levels using central composite design (CCD). Fatty acid methyl ester content was chosen dependent variable. Although the results of analysis of the surface with an irregular surface geometry showed that the biodiesel was partially impure after the reaction due to the natural characteristics of the lard oil as the raw material, we could confirm the relationship between them from the facts that the production amount of fatty acid methyl ester changes according to reaction temperature, reaction time, oil to methanol molar ratio, and catalytic amount.

Implementation of User Interface for ZigBee Wireless Network (ZigBee 무선 네트워크를 위한 사용자 인터페이스의 구현)

  • Lee, Hye-rim;Kim, Yu-doo;Kang, Cheol-gyu;Oh, Chang-heon;Moon, Il-young
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.05a
    • /
    • pp.752-755
    • /
    • 2009
  • Recently, the production process system is largely composed automatic system using the wired network. The production process system using wired network has disadvantages that take place expense when the installed and inspected production of equipment was replaced. The each equipment happens to repair cost for control and management in production processes. In this paper, the industrial equipment that applied for IEEE 802.15.4(ZigBee) technology solves a complicated space at the plant. And then when the industrial equipments replace wired network with wireless network, this paper studied its user interface.

  • PDF

Development of Viscous Inspection Equipment by Moire Phenomenon for Flatron Panel Glass

  • Chung, Kyu-Chul
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2002.08a
    • /
    • pp.118-121
    • /
    • 2002
  • In this study, we describe the development of viscous inspection equipment for flatron panel glass by Moire phenomenon and propose a new idea to develop an automatic inspection system for viscous or cord defects. It is possible to detect string viscous more easily and the equipment is practically being applied in production line. After using this equipment, the ratio of defective from customer is dropped significantly.

  • PDF

Process Improvements for Elevating Pre-outfitting Rate of FPSO (FPSO의 선행의장률 향상을 위한 생산관리 및 공법개선 사례연구)

  • Shin, Sung-Chul;Cho, Jong-Burm;Shin, Ki-Young;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.3
    • /
    • pp.325-334
    • /
    • 2009
  • Generally, functional design of FPSO has been done by the engineering firm designated by ship owner. Main equipment such as topside facility is imported from abroad. But sometimes, OFE (Owner Furnished Equipment) does not satisfy the PND (Product Need Date) of each production stage because the delivery date of OFE is not scheduled to satisfy the PND. And sometimes many loose items and equipment are complex from engineering which does not consider pre-outfitting. Main objective of this study is process improvements by maximizing pre-outfitting rate in the stage of equipping STP (Submerged Turret Production), one of main equipment on FPSO. In this study, we analyzed the factors which obstructed pre-equipping STP using the past records of FPSO projects.

A study on the flow characteristics of floating seedling equipment using computational fluid dynamics (Computational Fluid Dynamics를 이용한 부유식 새꼬막 채묘장치의 유동 특성에 관한 연구)

  • Yong-Beom PYEON;Kyung-Hoon LEE;Hwan-Seok CHOI;In-Tae LEE;Hyoung-Ho KIM;Chang-Je LEE
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.59 no.2
    • /
    • pp.164-171
    • /
    • 2023
  • This study analyzed the flow inside floating seedling equipment for Scapharca subcrenata. Due to the aging society of fishing villages, it is impossible to continuously input the labor force. Therefore, it is necessary to improve efficiency. Scapharca subcrenata has high per capita consumption. It serves as an important aquatic food resource. Scapharca subcrenata culture tends to be highly dependent on the natural environment. Production of Scapharca subcrenata is difficult to predict with low stability. In the past, manpower directly installed bamboo nets in mudflats. The seedling equipment devised in this study is a floating type and can be freely moved on the sea according to the prediction of Scapharca subcrenata generation. The flow around the floating seedling equipment was analyzed by numerical analysis. The physical phenomena of the flow around the net inside the floating seedling equipment were visualized. As a result, the space between the floating seedling equipment and the bottom net and the space between the net groups showed a lower flow rate than the inlet flow rate. It is expected that the low flow rate of the floating seedling equipment will have a positive effect on the attachment of Scapharca subcrenata.

A Study on Deterministic Utilization of Facilities for Allocation in the Semiconductor Manufacturing (반도체 설비의 효율성 제고를 위한 설비 할당 스케줄링 규칙에 관한 연구)

  • Kim, Jeong Woo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.153-161
    • /
    • 2016
  • Semiconductor manufacturing has suffered from the complex process behavior of the technology oriented control in the production line. While the technological processes are in charge of the quality and the yield of the product, the operational management is also critical for the productivity of the manufacturing line. The fabrication line in the semiconductor manufacturing is considered as the most complex part because of various kinds of the equipment, re-entrant process routing and various product devices. The efficiency and the productivity of the fabrication line may give a significant impact on the subsequent processes such as the probe line, the assembly line and final test line. In the management of the re-entrant process such as semiconductor fabrication, it is important to keep balanced fabrication line. The Performance measures in the fabrication line are throughput, cycle time, inventory, shortage, etc. In the fabrication, throughput and cycle time are the conflicting performance measures. It is very difficult to achieve two conflicting goal simultaneously in the manufacturing line. The capacity of equipment is important factor in the production planning and scheduling. The production planning consideration of capacity can make the scheduling more realistic. In this paper, an input and scheduling rule are to achieve the balanced operation in semiconductor fabrication line through equipment capacity and workload are proposed and evaluated. New backward projection and scheduling rule consideration of facility capacity are suggested. Scheduling wafers on the appropriate facilities are controlled by available capacity, which are determined by the workload in terms of the meet the production target.

Discrete Event Simulation based Equipment Combination Optimization Method - based on construction equipment performance estimation of the Construction Standard Production Rate - (이산형 이벤트 시뮬레이션 기반 최적의 건설장비 조합 도출 방법 제시 - 표준품셈 건설기계 시공능력 산식을 기반으로 -)

  • Ko, Yongho;Ngov, Kheang;Noh, Jaeyun;Kim, Yujin;Han, Seungwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.21-29
    • /
    • 2022
  • Productivity estimation of construction operations is crucial to successful project delivery. Especially in the preconstruction phase, the adequacy and effectiveness of plans directly affect the actual performance of operations. Currently, productivity estimation is conducted by referring to existing references such as the Construction Standard Production Rate. However, it is difficult to promptly apply changing conditions of operations when using such references. Moreover, it is difficult to deduce the optimal combination of construction machinery for the given condition. This paper presents a simple simulation model that can be used to generate productivity data that considers site conditions and construction equipment combination. The suggested method is expected to be used as a decision making assisting tool for practitioners who rely on estimations using the Construction Standard Production Rate when establishing construction plans using heavy machinery such as backhoes, loaders and dumptrucks.