Process Improvements for Elevating Pre-outfitting Rate of FPSO  

Shin, Sung-Chul (Department of Naval Architecture & Ocean Engineering, Graduate school, Pusan National University)
Cho, Jong-Burm (SAMSUNG HEAVY INDUSTRIES CO.,LTD)
Shin, Ki-Young (Department of Naval Architecture & Ocean Engineering, Graduate school, Pusan National University)
Kim, Soo-Young (Department of Naval Architecture & Ocean Engineering, Graduate school, Pusan National University)
Publication Information
Journal of the Society of Naval Architects of Korea / v.46, no.3, 2009 , pp. 325-334 More about this Journal
Abstract
Generally, functional design of FPSO has been done by the engineering firm designated by ship owner. Main equipment such as topside facility is imported from abroad. But sometimes, OFE (Owner Furnished Equipment) does not satisfy the PND (Product Need Date) of each production stage because the delivery date of OFE is not scheduled to satisfy the PND. And sometimes many loose items and equipment are complex from engineering which does not consider pre-outfitting. Main objective of this study is process improvements by maximizing pre-outfitting rate in the stage of equipping STP (Submerged Turret Production), one of main equipment on FPSO. In this study, we analyzed the factors which obstructed pre-equipping STP using the past records of FPSO projects.
Keywords
Owner furnished equipment; Pre-outfitting rate; Delay of arrival date; Method of construction; Construction schedule;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Son, H.J., Kim, T.H. and Park, C.S., 2007 Offshore Engineering, Sunhack publishing company, Incheon
2 Bae, M.H., Kim, S.J. and Moon, J.Y., 2007, 'The Optimum Design of Green Water Protector for FPSO,' Special Issue of the Society of Naval Architect of Korea, pp. 94-98   과학기술학회마을
3 Min, S.G., Lee, S.H., Kim, J.O., Ha, S.J. and Choi, T.H., 2005, 'A Case Study for Development of the Block Arrangement on Fixed Area and Scheduling System,' Special Issue of the Society of Naval Architect of Korea, pp. 159-164   과학기술학회마을
4 Park, J.H. and Hwang, O.J., 2007, 'The Current Situation and Development Direction about FPSO,' Journal of the Society of Naval Architects of Korea, Vol. 44, No. 2, pp. 43-50
5 Lee, J.W. and Kim, H.J., 1995, 'Erection Process Planning & Scheduling using Genetic Algorithm,' Transactions of the Society of Naval Architecture of Korea, Vol. 32, No. 1, pp. 9-16   과학기술학회마을
6 Sim, W.S., Moon, J.S. and Shin, H.S., 2004, 'Fatigue design practice in shortened project schedule,' Journal of the Society of Naval Architects of Korea, Proceedings of the Annual Autumn Meeting The Society of Naval Architects of Korea, pp. 902-907   과학기술학회마을