• Title/Summary/Keyword: Procurement management

Search Result 484, Processing Time 0.032 seconds

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

A Case Study of Balanced Scorecard(BSC) System Implementation in Public Procurement Service (조달청 BSC 시스템 구축사례)

  • Kim, Jae-Yeol
    • Information Systems Review
    • /
    • v.9 no.1
    • /
    • pp.259-282
    • /
    • 2007
  • This paper provides a case for the comprehensive performance management system in Public Procurement Service. Public Procurement Service set up the BSC system at the beginning of 2006 by improving and complementing the earliest performance management system and made it possible to automatically connet the performance measurement and evaluation of the departmental and person by using CSF and KPI, which result from their mission and strategic assignments. Therefore, the public service of the adminstration is able to offer better customer service, as the private corporations do, apply the incentive and disincentive policies to the personnel and reward administration and contribute to changing the administration into an organization of competition and performance compensation. The application of the BSC system enables the strengthening of the individual evaluation system in the departmental, integration of various evaluations into one, and the establishment of a monitering system of achievement rate in the objective management in the periodic results. Such a case study of Public Procurement Service will determine the course of establishment of the BSC in other public institutions and suggest many successful methods and ideas for the performance management system.

EXPLORING POTENTIAL SUCCESS FACTORS FOR PROCUREMENT OF PRIVATELY FINANCED INFRASTRUCTURE

  • Xiao-Hua Jin;Chunlu Liu;Jian Zuo;Guomin Zhang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.132-141
    • /
    • 2011
  • Australia has joined many governments to adopt public-private partnership (PPP) as a major strategy for procuring infrastructure for decades. However, failures have occurred although the market has been considered to be a mature and sophisticated one. Failures have typically been traced back to inappropriate economic evaluation and a lack of value-for-money. In particular, a literature review has identified that there was no holistic consideration on the evaluation of procurement transactions of PPP projects. The transaction costs of PPPs were not handled properly. In this paper, theories of transaction cost economics are proposed for the purpose of such a holistic institutional economic evaluation. These theories are analysed in order to identify potential critical success factors for a strategic infrastructure procurement framework. The potential critical success factors are identified and grouped into a number of categories that match the theories of transaction cost economics. These categories include (1) Asset Specificity, (2) Organizational Capability, (3) Transaction Frequency, (4) Behavioural Uncertainty, and (5) Environmental Uncertainty. These potential critical success factors may be subject to an empirical test in the future. The proposed framework will offer decision makers with an insight into project life cycle economic outcomes needed to successfully deliver PPPs.

  • PDF

Developing Response Plan for the Direct Buying System for SME's Construction Materials based on the Analysis of Material Procurement Management Load: Focused on the Owner Providing Public Apartment Housing (지급자재 조달관리부담 평가에 기초한 중소기업 공사용자재 직접구매제도 대응방안: 공공아파트를 공급하는 발주자를 중심으로)

  • Song, Sang-Hoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.425-434
    • /
    • 2013
  • The Small and Medium Business Administration specified 123 construction materials mandatory to purchase directly and forced the public owners to provide the contractors with materials as required by related law. This study extensively reviewed various characteristics and management factors of the owner-providing materials consumed in the public apartment housing under Direct Buying System(DBS) from the public owner's perspective. Subsequently, the major managed materials were identified, and the proper response plan was developed along the material procurement process. The Procurement Management Load Indices (PMLI) of 43 materials were evaluated according to rating criteria with procurement path, project-specified level, user requirement level, supplier's responsibility, on-site work requirement, additional parts, and inspection standards. The tile and aluminum windows were classified in the group needing high-level procurement efforts to reduce the errors and ensure the efficiency. The accurate quantity estimation method, definite purchase details, management activity definition before and after production, additional quantity for rework, interference coordination were defined as the essential activities for effectively responding to DBS.

A Study on the Satisfaction Level of the National Defense Electronic Procurement System Service by Applying the SERVQUAL Model (SERVQUAL 모형을 적용한 국방전자조달 서비스에 대한 만족도 분석)

  • Min, Wonbae;Kang, Seokjoong;Lee, Bumkoo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.2
    • /
    • pp.488-495
    • /
    • 2014
  • The national defense electronic procurement system is an information system supporting DAPA, services (Army, Navy and Air Force), and the procurement companies in the electronic bidding. It has contributed greatly to improving the efficiency of the national defense electronic procurement process by providing various information services based on inter-operation among the related parties. However the national defense electronic procurement system is expected to be upgraded to the next version in accord with rapidly evolving infrastructure based on high technology and increasing various communication channels. This paper investigates the satisfaction level of the system users and proposes directions for the next-generation procurement portal.

The Assessment of Food Procurement Practices in Elementary School Foodservices Located in Kyungkido (초등학교 급식소의 식품구매 실태조사 -경기도 지역을 중심으로-)

  • 유양자;윤선주
    • Korean journal of food and cookery science
    • /
    • v.13 no.3
    • /
    • pp.319-329
    • /
    • 1997
  • Food procurement practices in elementary schools were evaluated to provide basic information for the efficient foodservice management. Total 85 self-completed questionnaires were collected out of 134 dieticians working for elementary schools in Kyungkido, and analyzed for demographic background, purchasing activities and processing-food utilization status. The results were as follows: 1. The elementary schools were located in urban (22.0%), provincial (58.5%), and isolated areas (19.5%). 2. 62.4% of them were conventional schools and rest of them were commissary schools (37.6%). 3. As the total meals produced in schools increased, the number of meals served per foodservice staff and the workload increased, and more foods were purchased through wholesalers and competitive bids. 4. There were no significant differences (p > 0.05) in food procurement practices by the location, type of foodservice systems and the size of schools. 5. As the number of total meals in schools increased, the level of FPI (Food Processing Index) points for meat products, fish products, kimchi and sauce decreased.

  • PDF

Supply Chain Modelling for JIT of the Costruction (건설공사의 적시생산을 위한 자재공급 모델링 -전기설비 케이블덕트관 사례-)

  • Kim Bo-Hyun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.490-493
    • /
    • 2002
  • There have to be a pooled procurement in order to control construction in every stage. And we need also efficient supply chains to utilize the process. Researching and developing the method, which make it possible the supply chain management by modeling for Internet-enabled pooled procurement in construction, through breakdown in materials is currently in-progress the inside and out side of country. The objective of this paper is to find a reform while modeling the production process of cable duct moreover understanding the wasting factors in each step.

  • PDF

The Research on the Managing Method for Reasonable Amount of Inventory in Construction Site Using Inventory Model and BIM Data. (재고모형과 BIM 데이터를 활용한 건설현장의 적정 재고 관리방안에 대한 연구)

  • Kim, Ban-Seok;Park, Byung Joo;Park, Jung-Lo;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.119-120
    • /
    • 2012
  • The management for materials and inventory is one of the factors which are considered the most for profits of a business in almost all industrial fields. Resource procurement which occupies more than 40% of an overall construction cost has a strong relationship with profits of a business but it is regarded as a work for a manager rather than for a technician. It makes the importance of resource procurement relatively low and slows down the development of workings. As the construction project becomes more larger and complicated, effective management for materials are directly affecting the profits of a business. Therefore, this research works on finding an economical managing method for materials according to a characteristic of construction project based on accurately forecasted BIM data. Finding a reorder point by using BIM data which contains an accurate data for schedule and material enables a better management for materials and provides more accurate data on matters which were used to be determined by an intuition of a manager.

  • PDF

A Study on Material Requirement Planning by Integrating Schedule and Cost (비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.106-113
    • /
    • 2003
  • In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.