A Study on Material Requirement Planning by Integrating Schedule and Cost  

Song Young-Woong (숭실대학교 대학원)
Choi Yoon-Ki (숭실대학교 건축학부)
Publication Information
Korean Journal of Construction Engineering and Management / v.4, no.1, 2003 , pp. 106-113 More about this Journal
Abstract
In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.
Keywords
Project Control System; Integrated cost and schedule; Material requirement planning; Attribute of procurement;
Citations & Related Records
연도 인용수 순위
  • Reference
1 최윤기, 일정과 비용을 통합한 건설공사진도율 산정 시스템, 서울대학교 대학원, 박사학위논문, 1999
2 MRP기법을 이용한 EVMS의 복합작업.자원계획에 관한 연구, 한국건설관리학회 학술발표대회논문집, 2001
3 김우영, 공통자와 공통분류에 의한 비용/일정 통합모델 개발, 대한건축학회 논문집, 2002.8
4 CII, Project Control for Engineering, Publication No. 6-1, Jul, 1986
5 Raesdorf, William J. and Abudayyeh, Osama Y., Cost and SChedule Control Integration, Journal of Construction Engineering and Management, ASCE, 1991
6 박대홍, 건설현장 자원소요예측시스템에 관한 연구, 한양대학교 대학원, 석사학위논문, 2001
7 정철원, EV개념에 의한 통합건설공사관리시스템, 한국건설관리학회 학술발표대회 논문집, 2002, 8
8 William R. Duncan, A Guide to the Project Management Body of Knowledge, Project Management Institute, 1996
9 이현수, 건설공사의 비용. 일정 통합 모델에 의한 전사적 자원조달시스템 개발, 2002