• Title/Summary/Keyword: Procurement management

Search Result 485, Processing Time 0.023 seconds

Proposal of an Application Characteristic Model of Information System for Construction Decision-making Support (건설 의사결정지원용 정보시스템 활용특성모델 제안)

  • Lee Jong-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.145-152
    • /
    • 2004
  • Many construction companies have developed many kinds of information system to integrate the information created in the phase of planning, design, procurement, construction, and maintenance of construction project. However, the previous researches for the state of applying information technologies and the efforts of the analysis of the present information system launched in domestic construction industry is very rare. There also has been short of research on the construction decision-making support theory in construction business and industry. Hence this paper would contribute in identifying the state of information technologies and the theory of decision-making support of the information system in general construction company. and suggest the characteristic model on the information system for the construction decision-making support. The model consists of the two dimensions; (1) organizational hierarchy (2) data analyzing technology. This research, especially, can be expected to initiate the discussion on framework for understanding the construction decision-making support system in construction industry. The model is nut a practical methodology, but a window that offers a new perspective un sources of information system in each construction company, and thus can provide a clue of the useful guide to construction information system development.

  • PDF

Critical Barriers to the Practice of Effective Cost Planning in the Ghanaian Construction Industry

  • Kissi, Ernest;Adjei-Kumi, Theophilus;Badu, Edward
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.8-15
    • /
    • 2016
  • Cost planning practices in the construction industry worldwide has gained much popularity in recent times due to economic recession and stringent measures that various procurement laws prescribe in most developed and developing countries. Nevertheless, these practices in developing countries such as Ghana are constrained with the existence of critical barriers that render them non-effective and hence, accounting for the numerous abandonment of both private and public projects. Consequently, this study was enunciated with the aim to examine the critical barriers to the practice of effective cost planning in the Ghanaian construction industry. Through an in-depth literature review and a pilot survey, questionnaires were designed and administered to quantity surveyors. Data generated from the field survey was subjected to principal component analysis. The findings of the study revealed weak cost planning knowledge base, poor cost databases and understanding, inadequate designs and planning and external conditions are the major barriers to cost planning practices in the Ghanaian construction industry. The need for this study cannot be doubted since it provides an insight for experts in the construction industry on the barriers of the practice of cost planning in the industry. The awareness of these barriers will therefore facilitate efficient and effective efforts to resolve them. A future study is thereby proposed by this study to explore effective cost planning practices in the Ghanaian construction industry that will ensure private and public stakeholders get value for their money invested.

A Study on the Actual Construction Database Modeling and Application for Commercial Buildings (상업건축물의 공사칠적 데이터베이스(DB) 모델구축 밑 응용방안)

  • Kim Sun-Kuk;Lee Sung-Ho;Kim Tae-Hui;Joo Jin-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.83-90
    • /
    • 2002
  • Actual construction data are unsystematically handled and uselessly hoarded after completion of the project although actual construction data can be applied to the various works of the future projects. Many researches have been carried out by several engineers and scholars of construction firms and research institutes, but the level of the application is not plausible yet. The objective of this paper is to propose a web-based data model and application system for commercial buildings in order to enhance the usability of the actual construction data on line. The principal factors of commercial building project data and the user$^{\circ}{\phi}s$ requirements in various areas, such as planning, design, procurement and construction and so on are analyzed to implement the database structure of the proposed system. The application of resource Information focused on cost, manpower, equipment is included in the system, which is expected to enhances the usability of actual database application system compared with other researches proposed so far.

Improvement the bidding system in domestic construction engineering procurement (국내 건설 엔지니어링 입 ${\cdot}$ 낙찰 제도 개선방안 연구)

  • Choi, Bong-Gun;Park, Sung-Je;Joh, Hoon-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.632-637
    • /
    • 2006
  • Our country's bidding system had made the lowest price successful bid system in foundation before introducing eligibility review system at July, 1995, and a averaged- price successful bid system or the restrictive-lowest price successful bid system had been enforced by repletion. However, they were introduced as dumping that do not reach in direct cost level of construction cost is generalized and worry about illegal construction practices rises by the lowest price successful bid system. According as they had not been promoted construction company's technical development effort or cost reduction effort, vicious circle that advocate competition principle again and recur as the lowest price successful bid system is repeated last 50 years. Therefore, I present improvement direction that can satisfy all Global Standard and real condition of our country through foreign countries example analysis to cope with the rapidly changing building circumstances socially and economically to correspond actively to the construction industry's reorganization to reconsider domestic construction engineering's competitive power.

  • PDF

BSC Based Measurement of Satisfaction Degree For Based BIM Construction Projets (BSC를 기반으로 한 BIM프로젝트의 만족도 측정에 관한 연구)

  • Song, Mi-Rim;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.117-129
    • /
    • 2011
  • Building Information Modeling technology (BIM) is one of the most effective solutions to deal with the trend that buildings are getting more and more complicated, large-scaled, and multiple-purposed. BIM in the construction industry is increasingly adopted since the Korea Public Procurement Service announced that BIM would be obligated in a construction project whose total cost is over 50 billion won from 2012. This fact has boosted BIM related research projects as well. However, the majority of the studies have been focusing on the solutions with technological points of view and there has been lack of research on how much degree project stakeholders are satisfied with the BIM adoption in their projects. Therefore, the objective of this study is to investigate the current status and satisfaction degree of stakeholders in a synthesized point of view in BIM-based projects in order to identify critical factors and weak points in the BIM adoption process. The results of this study would greatly help to improve the strategies and processes in BIM-based projects as well as to increase the satisfaction degree of BIM utilization in a project.

A Study of Electronic Commerce Transactions of the Hospitals (의료기관 전자상거래 현황에 대한 연구)

  • Jung, Mi-Yeong;Kim, Hye-Sook;Park, Jae-Sung
    • The Korean Journal of Health Service Management
    • /
    • v.6 no.2
    • /
    • pp.25-34
    • /
    • 2012
  • The purpose of this research is to evaluate the degree of transactions of the electronic commerce in the hospitals. We created well-organized questionnaire to achieve this goal. we did telephone interviews with the hospitals, and then we reached out to the hospitals by e-mail and postal mail. We interviewed 311 hospitals, and 104 hospitals participated in this study. We conducted cross tabulations. The results are following : Among the subjects, male was 77.9%(81) and female was 22.1%(23). 51.0% of the hospitals used electronic commerce in their work purpose. The proportion of the hospitals that started their electronic commerce before 2000 years was 30.2% and after 2000 years was 69.8%. In the major electronic commerce service providers, 30.4% of the hospitals had their contract with auction, 18.4% of the hospitals had their contract with public procurement services. which is running by Korean government, and 11.8% were with EZmedicom and 10.8% were working with Carecamp. Through electronic commerce, the most high usage was office supplies 41.0% and the send area was medical supplies 11.2%. The results of this study suggest that electronic commerce in health care field is a very new area compared to other industries. There may be lots of barriers in the aspects of a way of working and norms of health care field. Electronic commerce system and contracts with their electronic commerce service providing partners.

A Correlation Analysis of Influence Factors of Nonconformity in Construction Projects (건설프로젝트의 품질결함의 발생요인간 상관분석)

  • Chi, Sungjoon;Cha, Yongwoon;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.21-28
    • /
    • 2015
  • Construction defects are major components that result in cost overruns and schedule delays in construction projects. There have been extensive research efforts to investigate the cause of defects. However, little effort has been devoted to analyze correlation among various reasons of construction defects while a defect is not usually an outcome of a single cause, but rather occurs when several interrelated causes combine. Based on this recognition, this paper analyzes 831 nonconformity reports collected from 30 construction projects in Korea from 2011 to 2014. The correlation analysis revealed that a significant portion of construction defects occurred in the procurement and construction phase and as the pattern of function defect and installation defect. Triggered by human error, defective material and faulty method, these defects are treated by conccession, repair, rework that can significantly lower the cost and schedule performance. This paper is significant in terms of providing a theoretical basis for analyzing correlation among various reasons of construction defects and quantitative measures for establishing effective defect prevention strategies.

An Analysis of IT Proposal Evaluation Results using Big Data-based Opinion Mining (빅데이터 분석 기반의 오피니언 마이닝을 이용한 정보화 사업 평가 분석)

  • Kim, Hong Sam;Kim, Chong Su
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.1
    • /
    • pp.1-10
    • /
    • 2018
  • Current evaluation practices for IT projects suffer from several problems, which include the difficulty of self-explanation for the evaluation results and the improperly scaled scoring system. This study aims to develop a methodology of opinion mining to extract key factors for the causal relationship analysis and to assess the feasibility of quantifying evaluation scores from text comments using opinion mining based on big data analysis. The research has been performed on the domain of publicly procured IT proposal evaluations, which are managed by the National Procurement Service. Around 10,000 sets of comments and evaluation scores have been gathered, most of which are in the form of digital data but some in paper documents. Thus, more refined form of text has been prepared using various tools. From them, keywords for factors and polarity indicators have been extracted, and experts on this domain have selected some of them as the key factors and indicators. Also, those keywords have been grouped into into dimensions. Causal relationship between keyword or dimension factors and evaluation scores were analyzed based on the two research models-a keyword-based model and a dimension-based model, using the correlation analysis and the regression analysis. The results show that keyword factors such as planning, strategy, technology and PM mostly affects the evaluation result and that the keywords are more appropriate forms of factors for causal relationship analysis than the dimensions. Also, it can be asserted from the analysis that evaluation scores can be composed or calculated from the unstructured text comments using opinion mining, when a comprehensive dictionary of polarity for Korean language can be provided. This study may contribute to the area of big data-based evaluation methodology and opinion mining for IT proposal evaluation, leading to a more reliable and effective IT proposal evaluation method.

A Study on the Material Supply Man-Hour Computation based on MODAPTS in Automobile Assembly Line (MODAPTS 기반 자동차 조립공정 부품공급 공수 산정에 관한 연구)

  • Jang, Jung-Hwan;Jang, Jing-Lun;Quan, Yu;Jho, Yong-Chul;Kim, Yu-Seong;Bae, Sang-Don;Kang, Du-Seok;Lee, Jae-Woong;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.127-135
    • /
    • 2016
  • Korean automobile industrial is in a difficult situation because of more competitive global market and lower demand. Therefore, domestic as well as global automobile manufacturers are making greater efforts in cost reduction to strengthen the competitiveness. According to statistical data, logistics cost in domestic manufacturers is higher than advanced countries. In this study, we developed program to effectively manage standard time of procurement logistics, and confirm based on A-automobile factory data. For the purpose, we develop the system which is possible to manage standard time as well as calculate man-hour. Program is not just for calculating and managing standard man-hour, scenarios analysis function will be added to calculate benefit while introduce logistics automated equipment. In this study we propose scenario using AGV instead of electric motor while move component. In the scenario analysis, job constitution is changed, and then we use system to compare the result. We can confirm standard man-hour is reduced from 22.3M/H to 14.3M/H. In future research, it is necessary scenario analysis function, and develop algorithm with realistic constraint condition.

A Study on the Economic Profitability of Building Remodeling - On the Basis of Samsung cheil Hospital - (Remodeling의 경제적 타당성에 관한 연구 - 삼성제일병원을 중심으로 -)

  • Kim, Dong-Jae;Kim, Gab-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.891-896
    • /
    • 2008
  • Recently our country need to change about hospital building operation and business change. The recent real estate development projects are made in very complex due to the diversity of development method or its legal aspects. Under such a real estate investment, the review of investment yield rate is fundamentally important for the one that invests and the one that finances it. Previously, the focus was in the review of the time to turn the surplus or the plan for making repayment of the borrowings, and without the analysis of sufficient investment yield rate. For a simple issue of finding the most advantageous project method, there is a need for reviewing the taxation issues, fund procurement method, legal aspects, policy analysis aspects and others. Therefore, the real estate investment is now likely to encounter the form of having the time of venture as well. In conclusion, the scientific and reasonable decision making in investing on the real estate does not suggest the absolute evaluation standard but the need and the use are more and more demanded.

  • PDF