1 |
P. Haslum, "Incremental Lower Bounds for Additive Cost Planning Problems", Australian National University & NICTA Optimization Research Group, Proceedings of the 22nd International Conference on Automated Planning and Scheduling, pp. 1-9, 2012.
|
2 |
Heintz, James, L. Ndikumana, "Is There a Case for Formal Inflation Targeting in Sub-Saharan Africa?" Political Economy Research Institute, Working Papers, 218, March, University of Massachusetts, Amherst, Massachusetts, 2010.
|
3 |
International Fund for Agricultural Development "World Bank Knowledge Management Strategy", 2007. Available at: http://www.ifad.org/pub/policy/km/e.pdf [accessed on 9 April 2015].
|
4 |
A. Knipe, G. Van Der Waldt, D. Van Niekerk, D. Burger, K. Nell, "Project Management for Success", Cape Town: Heinemann, 2002.
|
5 |
S. Laryea, "Contractor Project Estimates vs. Consultant Project Estimates in Ghana", In the Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors, 2-3 September 2010, Dauphine Universite, Paris, 2010.
|
6 |
E. Ly, J. C. Anumba, P. M. Carrillo, "Knowledge Management Practices of Construction Project Managers", Loughborough University, UK, 2005.
|
7 |
W. M. Matipa, P. Cunningham, B. Naik, "Assessing the Impact of New Rules of Cost Planning on Building Information Model (BIM) Schema Pertinent to Quantity Surveying Practice", In 26th Annual ARCOM Conference, Viewed, vol. 16, 2013.
|
8 |
R. Morton, D. Jaggar, "Design and the Economics of Building", London: Spon, 1995.
|
9 |
W. L. Neuman, L. Kreuger, "Social Work Research Methods: Qualitative and Quantitative Approaches", Allyn and Bacon, 2003.
|
10 |
J. Nicco-Annan, "Partnering in Construction", the Quantity Surveyor, vol. 1, pp. 14-19, 2006.
|
11 |
M. J. Norusis, "SPSS/PC+ V2. 0 Base Manual for the IBM PC/XT/AT and PS/2", 1988.
|
12 |
K. Obeng-Ayirebi, "Management Contracts as Practiced in Ghana", Unpublished MSc. Thesis, Department of Building Technology, Kwame Nkrumah University of Science and Technology, pp. 60-72, 2002.
|
13 |
M. S. Ramabodu "Procurement Guidelines for Project Success in Cost Planning of Construction Projects", Doctoral Dissertation, University of the Free State, 2014.
|
14 |
T. Ramachandra, J. O. B. Rotimi, "Causes of Payment Problems in the New Zealand Construction Industry", Construction Economics and Building, vol. 15, no. 1, pp. 43-55, 2015.
DOI
|
15 |
M. Sambasivan, Y. W. Soon, "Causes and Effects of Delays in Malaysian Construction Industry", International Journal of Project Management, vol. 25, no. 5, pp. 517-526, 2007.
DOI
|
16 |
A. Santos, J. A. Powell, F. C. Torres, "Setting Stretch Targets for Driving Continuous Improvement in Construction: Analysis of Brazilian and UK Practices", Work Study, vol. 49, no. 2, pp. 50-58, 2000.
DOI
|
17 |
P. Smith, "Project Cost Management - Global Issues and Challenges", 27th IPMA World Congress, Procedia Social and Behavioral Sciences, vol. 119, pp. 485-494, 2014.
|
18 |
R. J. Stephenson, "Project Partnering for the Design and Construction Industry", John Wiley & Sons, 1996.
|
19 |
H. H. Tang, Y. L. Chen, J. S. Gero, "The Influence of Design Methods on the Design Process: Effect of Use of Scenario, Brainstorming, and Synectics on Designing", Proceedings of Design Research Society (DRS) 2012, pp. 1824-1838, 2012.
|
20 |
The Center for Construction Research and Training. The Construction Chart Book fourth edition (chart 28d). Available at http://www .cpwr.com/sites/default/ files/publications/CB%20p age%20 30.pdf [accessed on 9 April 2015].
|
21 |
Washington State Department of Transportation, "Cost Estimating Manual for WSDOT Projects", 2008. Available at: http://www.wsdot.wa.gov/publications/fulltext/CEVP/Estimating Guidelines .pdf [accessed on 9 April 2015].
|
22 |
T. M. Williams, "The Need for New Paradigms for Complex Projects", International Journal of Project Management, vol. 17, no. 5, pp. 269-273, 1999.
DOI
|
23 |
C. R. Wu, C. T. Lin, P. H. Tsai, "Performance Measurement Model on Wealth Management Banking: Analytic Hierarchy Process and Balanced Scorecard Approach", Journal of Information and Optimization Sciences, vol. 29, no. 6, pp. 1101-1114, 2008.
DOI
|
24 |
J. Yates, "The More Things Change? An Overview of Australia's Recent Home Ownership Policies", European Journal of Housing Policy, vol. 3, no. 1, pp. 1-33, 2003.
DOI
|
25 |
H. Abdul-Rahman, M. A. Berawi, A. R. Berawi, O. Mohamed, M. Othman, I. A. Yahya, "Delay Mitigation in the Malaysian Construction Industry", Journal of Construction Engineering and Management, vol. 132, no. 2, pp. 125-133, 2006.
DOI
|
26 |
H. Abdul‐Rahman, I. A. Yahya, M. A. Berawi, L. W. Wah, "Conceptual Delay Mitigation Model Using a Project Learning Approach in Practice", Construction Management and Economics, vol. 26, no. 1, pp. 15-27, 2008.
DOI
|
27 |
D. K. Ahadzie, "A Model for Predicting the Performance of Project Managers in Mass House Building Projects in Ghana", Unpublished thesis (PhD), University of Wolverhampton, UK, 2007.
|
28 |
R. G. Anderson, W. H. Greene, B. D. McCullough, H. D. Vinod, "The Role of Data/Code Archives in the Future of Economic Research", Journal of Economic Methodology, vol. 15, no. 1, pp. 99-119, 2008.
DOI
|
29 |
A. S. Ali, S. N. Kamaruzzaman, "Cost Performance for Building Construction Projects in Klang Valley", Journal of Building Performance, vol. 1, no. 1, 2010.
|
30 |
P. Anderson, D. Chisholm, D. C. Fuhr, "Effectiveness and Cost-Effectiveness of Policies and Programmes to Reduce the Harm Caused by Alcohol', The Lancet, vol. 373, no. 9682, pp. 2234-2246, 2009.
DOI
|
31 |
Association of South African Quantity Surveyor (ASAQS), "Guide to Elemental Cost Estimating and Analysis for Building Works", South Africa, September, 1998.
|
32 |
N. Azhar, R. U. Farooqui, S. M. Ahmed, "Cost Overrun Factors in Construction Industry of Pakistan", In First International Conference on Construction in Developing Countries (ICCIDC-I), Advancing and Integrating Construction Education, Research & Practice, pp. 499-508, 2008.
|
33 |
R. F. Aziz, "Factors Causing Cost Variation for Constructing Wastewater Projects in Egypt", Alexandria Engineering Journal, vol. 52, no. 1, pp. 51-66, 2013.
DOI
|
34 |
A. Bryman, "Social Research Methods", Oxford University Press, New York, 2004.
|
35 |
Centre for Development Policy and Research, "Inflation-Targeting in Sub-Saharan Africa: Why Now? Why at All?" 2008, http://www.undppovertycentre.org/pub/IPCOnePager 51.pdf [accessed on 9 April 2015].
|
36 |
E. H. W. Chan, C. H. Suen, "Disputes and Dispute Resolution Systems in Sino-Foreign Joint Venture Construction Projects in China", Journal of Professional Issues in Engineering Education and Practice, ASCE 131: pp. 141-148, 2005.
DOI
|
37 |
J. Egan, "The Egan Review: Skills for Sustainable Communities", Office of the Deputy Prime Minister, London, 2004. Available at: http://www.odpm.gov.uk/Stellent/groups/odpmurbanpolicy/documents/pdf/ odpm_urbpol_pdf_028549.pdf [accessed on 9 April 2015].
|
38 |
C. Chung-Suk, G. E. Gibson, "Building Project Scope Definition Using Project Definition Rating Index" Journal of Architectural Engineering, vol. 7, no. 4, pp.115-125, 2001.
DOI
|
39 |
J. DeCoster, "Overview of Factor Analysis", 1998. Accessed Via: Www.Stat-Help.Com/Notes.Html (April, 2015).
|
40 |
R. Dogbegah, D. Owusu-Manu, K. Omoteso, "A Principal Component Analysis of Project Management Competencies for the Ghanaian Construction Industry", 2011.
|
41 |
H. K. Eliufoo, "Preliminary Estimates of Building Cost and the Lowest Evaluated Tender", College of Engineering and Technology University of Dares Salaam, pp. 36, 2000.
|
42 |
D. J. Ferry, P. S. Brandon, "Cost Planning of Buildings", 6 th Edition. Great Britain: BSP Professional Books, 1991.
|
43 |
A. Field, "Discovering Statistics Using SPSS for Windows", London: Sage Publication, 2005a.
|
44 |
B. Flyvbjerg, M. K. Skamris Holm, S. L. Buhl, "How Common and How Large Are Cost Overruns in Transport Infrastructure Projects?' Transport Reviews, vol. 23, no. 1, pp. 71-88, 2003.
DOI
|
45 |
K. Folwell, G. Sharp, J. Souza, A. Wilen, D. Bentley, R. Davis, V. Hutchinson, "UK Industry Performance Report", London: Construction Excellence, 2012.
|
46 |
Y. Frimpong, J. Oluwoye, L. Crawford, 'Causes of Delay and Cost Overruns in Construction of Groundwater Projects in a Developing Countries; Ghana as a Case Study", International Journal of Project Management, vol. 21, no. 5, pp. 321-326, 2003.
DOI
|