A Study on the Material Supply Man-Hour Computation based on MODAPTS in Automobile Assembly Line |
Jang, Jung-Hwan
(Department of Industrial Engineering, INHA University)
Jang, Jing-Lun (Department of Industrial Engineering, INHA University) Quan, Yu (Department of Industrial Engineering, INHA University) Jho, Yong-Chul (Korea Port Training Institute Incheon) Kim, Yu-Seong (KIA AUTOBILE Kwang-Ju Vehicle Manufacturing Engineering Team) Bae, Sang-Don (KIA AUTOBILE Kwang-Ju Vehicle Manufacturing Engineering Team) Kang, Du-Seok (KIA AUTOBILE Kwang-Ju Vehicle Manufacturing Engineering Team) Lee, Jae-Woong (KIA AUTOBILE Kwang-Ju Vehicle Manufacturing Engineering Team) Lee, Chang-Ho (Department of Industrial Engineering, INHA University) |
1 | Don-gsu Kang(2013), "Case studies on operation effects of integrated local autoparts supply logistics", Dong-Eui University master's thesis |
2 | Mun-su Joe(2014.), Niebel's Methods, Standards, and Work Design, McGraw-Hill Education Korea |
3 | Su-hwan Kim(2011.), "A Study on Simulation Method of MODAPTS Techniques", AJou University master's thesis |
4 | Tae-su Kim(2004), Modern Work Management, bookshill |
5 | Yooeui Jin, Youn-kyoung Joung(2013), "A Study on Web - based Smart Assembly Process Planning and Simulation System for Automotive Parts Assembly", Proceedings of the Society of CAD/CAM Conference |
6 | Qiao, Y.D. and Yuan, K.G. and Shu, L.K.(2008.), "The Man-Hour Calculation Model for Multi-Stage Manufacturing System Based on Primitive Decomposition and Web Service", ASME 2008 International Mechanical Engineering Congress and Exposition, |
7 | Korean Statistical Information Service,http://kosis.kr |
8 | Korea Automobile Manufacturers Association,http://www.kama.or.kr/InfoController |
9 | 黃一鈞(上海交通大學), "車身車間AGV物料搬運系統小車數量配置規劃", 工業工程與管理期刊, 2015. |
10 | 網易汽車, http://auto.163.com/11/0908/17/7DEP44FP00084TV6.html |