• Title/Summary/Keyword: Process management

Search Result 16,489, Processing Time 0.04 seconds

Development of the Process Mapping for the Radiation Safety Management (방사선안전관리를 위한 Process Mapping 개발)

  • Lee, Yong Sik;Lee, Jin Woo;Lee, Yun Jong
    • Journal of Radiation Protection and Research
    • /
    • v.38 no.3
    • /
    • pp.149-156
    • /
    • 2013
  • Recent domestic use of radiations has increased in the number of institutions and companies as well as operating as an investment, a variety of facilities and safety management are becoming increasingly complex. Despite the increase of radiation workers and facilities, the number of RSOs (Radiation Safety Officers) has not increased with a growing domestic radiation industry. The radiation safety management work (radiation workers management, radiation sources management, facilities management etc.) has been managed by insufficient number of the RSOs. These problems could be directly or indirectly related to causes of the radiation accidents. In this paper, we designed the Process Mapping of radiation safety management work for an efficient safety management of the radiation facilities and protection of radiation accidents. To develop the Process Mapping, we analyzed the radiation safety requirements of management issues and the individual procedures. Based on the Process Mapping, the work procedures for an appropriate radiation safety management of each institution can be configured clearly. Through this procedures, the safety risk factors in radiation facilities can be reduced, and the radiation safety management system will be improved. Depending on your needs, the Process Mapping could be modified and could be used for an efficient radiation safety management.

Integration of Strategic Issue Management and Knowledge Management in View of Strategic Information Process

  • Yum, Ji-Hwan
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.383-400
    • /
    • 2004
  • Knowledge management is an essential part for gaining competitive advantage. The knowledge management system deals with information gathering, process, and implementation for the organizational performance advantage. The study integrates knowledge management in view of an internal organizational information processing structure and external strategic issue management system. This means that the coordination between internal systematic process and external scanning mechanism is essential for organizational success.

  • PDF

Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information (BIM정보를 활용한 강구조물의 공정 물량 통합관리)

  • Kim, Jin-Uk;Shin, Tae-Song
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

The Failure Mode and Effects Analysis Implementation for Laser Marking Process Improvement: A Case Study

  • Deng, Wei-Jaw;Chiu, Chung-Ching;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • v.8 no.1
    • /
    • pp.137-153
    • /
    • 2007
  • Failure mode and effects analysis (FMEA) is a preventive technique in reliability management field. The successful implementation of FMEA technique can avoid or reduce the probability of system failure and achieve good product quality. The FMEA technique had applied in vest scopes which include aerospace, automatic, electronic, mechanic and service industry. The marking process is one of the back ends testing process that is the final process in semiconductor process. The marking process failure can cause bad final product quality and return although is not a primary process. So, how to improve the quality of marking process is one of important production job for semiconductor testing factory. This research firstly implements FMEA technique in laser marking process improvement on semiconductor testing factory and finds out which subsystem has priority failure risk. Secondly, a CCD position solution for priority failure risk subsystem is provided and evaluated. According analysis result, FMEA and CCD position implementation solution for laser marking process improvement can increase yield rate and reduce production cost. Implementation method of this research can provide semiconductor testing factory for reference in laser marking process improvement.

A change Management Model for BPM Documents in e-Business Environments (e-Business를 위한 BPM 문서 변경관리 모델)

  • 배혜림;조재균;정석찬;박기남
    • The Journal of Society for e-Business Studies
    • /
    • v.8 no.3
    • /
    • pp.87-105
    • /
    • 2003
  • Business Process Management (BPM) is an emerging trend of managing business process life cycles and integrating heterogeneous systems . Recently, BPM is considered as an essential element for automation of complex business processes involving many companies, particularly for those in an e-Business environment. In such an environment, it is very important for each business partner to trace history of resources. However, it has been a difficult problem for Workflow Management Systems(WFMSs) to support management of resource changes because of limited storage, complex process structure, and absence of formal change model. In this paper. a new framework is proposed, which can support change management for documents, one of core resources of business process. Under a traditional WFMSs framework, all workflow components belong to either build-time or run-time function, and executions of workflow processes are performed by the two functions . To manage changes of documents while process executing. a new framework with additional component modules are required. A version control method is introduced for the purpose of managing document changes. The proposed method includes five models for document structure, process structure, association between process and document, version management, and efficient version storage. A prototype system is developed to demonstrate the effectiveness of the proposed models.

  • PDF

Development of the ISEP Based on Systems Engineering (시스템엔지니어링을 적용한 ISEP 개발에 관한 연구)

  • Byun, BoSuk;Choi, YoChul;Park, Young T.
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.4
    • /
    • pp.725-735
    • /
    • 2013
  • Purpose: The purpose of this study is to propose an Integrated Safety Evaluation Process (ISEP) that can enhances the safety aspect of the safety-critical system. This process utilizes the advantages of the iterative Systems Engineering process combined with the safety assessment process that is commonly and well defined in many standards and/or guidelines for railway, aerospace, and other safety-critical systems. Methods: The proposed process model is based on the predefined system lifecycle, in each phase of which the appropriate safety assessment activities and the safety data are identified. The interfaces between Systems Engineering process and the safety assessment process are identified before the two processes are integrated. For the integration, the elements at lower level of Systems Engineering process are combined with the relevant elements of safety assessment process. This combined process model is represented as Enhanced Functional Flow Block Diagram (EFFBD) by using CORE(R) that is commercial modelling tool. Results: The proposed model is applied to the lifecycle and management process of the United States aircraft system. The US aircraft systems engineering process are composed of twelve key elements, among which the requirements management, functional analysis, and Synthesis processes are considered for examplenary application of the proposed process. To synchronize the Systems Engineering process and the safety assessment process, the Systems Engineering milestones are utilized, where the US aircraft system has thirteen milestones. Taking into account of the nine steps in the maturity level, the integrated process models are proposed in some phases of lifecycle. The flows of processes are simulated using CORE(R), confirming the flows are timelined without any conflict between the Systems Engineering process and the safety assessment process. Conclusion: ISEP allows the timeline analysis for identifying activity and data flows. Also, the use of CORE(R) is shown to be effective in the management and change of process data, which helps for the ISEP to apply for the development of safety critical system. In this study, only the first few phases of lifecyle are considered, however, the implementation through operation phases can be revised by combining the elements of safety activities regarding those phases.

Economic Order Quantity(EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard Availability (일일 수요량 변동성과 가용야적면적을 고려한 건설 자재의 경제적주문량(EOQ) 산정 프로세스)

  • Yun, Jung-Sook;Yu, Jung-Ho;Kim, Chang-Duck
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.33-42
    • /
    • 2011
  • Part of material and inventory management is one of important factor for business interests. But importance of material and inventory management in domestic construction project has been relatively devalued. The existing study of inventory has been studied with limited individual factor about inventory management. Therefore construction material management needs improvement via an accurate prediction with whole and systematic process viewpoint. and existing theory of material and inventory introduction to construction from manufacturing needs reflecting characteristics about construction project. This paper suggests material management process for economic material management. This paper to make a unit curtain wall of case construction project comparison between total cost of existing material management process and total cost of economic order quantity of proposal material management process To verify usefulness of order point and order quantity determination process.

An Integrated Tool Model for the Management of Process and Artifact Management on CBD (컴포넌트 기반 개발에서의 프로세스 관리와 산출물 관리를 통합하는 도구의 모델)

  • Kim Young-Hee;Chong Ki-Won
    • Journal of Internet Computing and Services
    • /
    • v.5 no.4
    • /
    • pp.11-22
    • /
    • 2004
  • Works that improve the process and notify the improved process, the product and the change of tasks to all users are essential in achieving project. Existent project management tools support the definition and the change of project activities, and configuration management tools support version check, workspace management. build management. etc. It costs too much to buy each tool. as well as, it is burdensome to learn usage for various tools. Therefore the web-based integrated tool is proposed to manage the process and artifacts at a time in this paper. The proposed tool defines component based development process model. and achieves recording of process progression, processing the request of change, reporting the progression of each task, product registering and change, version recording, artifact or form search, etc. using ebXML. Furthermore, the stakeholders get the systematic management and standardization by sharing information that are necessary in process achievement and configuration management in distributed environment using the integrated management tool.

  • PDF

EVMS Application Process based on Project Management Processes (Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스)

  • Baek Sung-Min;Ahn Byung-Ju;Kim Jae-Jun;Kong Gun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System) came to the proper method for integrated cost-schedule control and Government announced EVMS application plan. After that, many studies related adaptability, activation, model, and process reflecting the characteristics of the domestic construction industry are proceeded in construction sites and schools. This thesis is a study of EVMS process. The purpose of this paper is to analyze the problems of previous researches for EVMS Process and to suggest the EVMS application Process based on Project Management Processes of PMBOK. In this kind of view, this thesis suggests the new direction to study EVMS process. And furthermore, this process is suggested for showing a framework of EVMS in Korean construction project are identified.

Business Process Change Design from Decision Model Perspective

  • Han, Hyun-Soo
    • Management Science and Financial Engineering
    • /
    • v.9 no.2
    • /
    • pp.21-45
    • /
    • 2003
  • Various organizational factors effect successful implementation of IT enabled business transformation. Among them, the most critical success factor is deemed to overcoming change management problem. Lots of studies have been made on implementation methodologies and business process formalizations to encourage organizational members to accept new business process changes. However, the logic of process redesign still depends on qualitative problem solving techniques mostly depending on basically human intuition such as brainstorming, cause-and-effect analysis, and so on. In this paper, we develop algorithmic procedure applicable to designing various business process changes such as process automation, business process resequencing, and more radical process integration. The framework is employed from dynamic programming approach in the literature, which is based on the decision making paradigm of organizations to abstract business processes as quantitative decision models. As such, our research can fill the gap of limited development of theory based analytic methodologies for business process design, by providing objective rationale to reach the consensus among the organizational members including senior management.