• Title/Summary/Keyword: Process Priority

Search Result 1,292, Processing Time 0.029 seconds

A Study on Deciding Priority of Optimal Design Guide for Disassembly Process (분리공정 개선을 위한 설계 가이드 우선순위 결정방법론)

  • Mok, Hak-Soo;Lee, Jae-Sung;Cho, Jong-Rae
    • IE interfaces
    • /
    • v.17 no.4
    • /
    • pp.414-425
    • /
    • 2004
  • This study presents the decision of priority for optimal design guide to improve disassembly process. Disassembly process is divided into recognition, transfer and disassembly of assembly point and recognition, transfer and remove of grasp point. Significant influential factors are derived from analyzing the above process. And those factors are used for making the check list to evaluate the properties of parts in each process. Furthermore, the weight with considering disassembly process is also used to determine weight of each process. On the base of the above sequence, qualitative score of disassemblability of each process that is enabled to compare different disassembly processes can be acquired. Ultimately the score helps to decide the priority of design guide for disassembly process.

Application of Analytic hierarchy Process to decide the priority of undeveloped neighborhood park (도시공원 조성의 우선순위 결정에 있어서 계층분석과정 기법의 적용)

  • 박문호
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.24 no.1
    • /
    • pp.42-54
    • /
    • 1996
  • Many of urban parks which have been designated for urban planning regulation are not well developed because the priority of investment is inferior to that of other public facilities. Park development is an urgent urban policy and it is hard to decide priority among parks. Therefore, it is necessary to evaluate the priority of park development. Thus the Analytic Hierarchy Process has been introduced because it is suitable for achieving objectivity by collecting the professional opinions. The goals of park development are evaluated by AHP method and the priorities among goals are conservation of natural environment, satisfying the residents' residents' needs, population density, regional pollution, land acquisition cost, ratio of greeneries and facilities within park areas. Priority of park development is decided by the standardization of each individual inventory data and considering of the professional opinions. Among the multi-attribute judgement methods, AHP method may be the most widely used. Despite the critical evaluations of the AHP, such as limitation of the nine-point scale and the rank reversal problem, application of AHP to decide the priority of park development is suitable for actual circumstances.

  • PDF

On Optimal Replacement Policies for a Deteriorating System (기능저하 시스템에서의 최적 교체 정책)

  • Ji Hwan Chan
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.4
    • /
    • pp.94-105
    • /
    • 2002
  • In this paper, replacement problems for a deteriorating system are considered. In the system under consideration, the successive lifetimes after repair become shorter and shorter, while the consecutive repair times become longer and longer. More specifically, the lifetimes of the system form a nonhomogeneous Poisson process, whereas the consecutive repair times constitute a stochastically increasing geometric process. Optimal replacement policies for the long-run average cost rate and the steady state availability are considered. Also taking the cost and the availability into consideration at the same time, the properties of optimal policies under the Cost Priority Policy and the Availability Priority Policy are obtained.

A Priority Setting Method of the Design Specifications with regards to Functional Requirements at the stage of Concept Design (개념설계단계에서 요구품질을 고려한 설계사양 중요도 결정방법)

  • Park Ji-Hyung;Lee Joong-Ho;Yeom Ki-Won
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.119-120
    • /
    • 2006
  • Prioritizing the design specifications among many alternatives is necessary at the stage of concept design. Design specifications have trade-offs between cost and performance, and the relationships among them, in the standpoint of various functional requirements, are complex. AHP(Analytic Hierarchy Process) method is one of the most popular ways of solving the priority setting problem. However, it is impossible to monitor the interim findings in the middle of the process, it is hard to predict the difference when changing pairwise comparison conditions, and the operation done by one person makes it hard to share the process simultaneously. This paper shows a new method of priority setting in this kind of decision making problem. This method is designed to support the realtime priority setting among many design specifications with regards to many functional requirements. A new algorithm and visualization methods are introduced, and the usability is verified in an exemplary concept design stage.

  • PDF

Cluster Priority Selection Algorithm for Minimizing Surplus Parts in Ball Bearing Selective Assembly System (볼 베어링 선택조립 시스템에서 잉여부품 최소화를 위한 군집 우선 선택 알고리즘)

  • Shin, Kang-hyeon;Jin, Kyo-hong
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.10a
    • /
    • pp.15-17
    • /
    • 2022
  • In order to minimize surplus parts in ball bearing selective assembly systems, it is necessary to optimize the selection probability by grasping the dimensional distribution of each part. But the use of a complex system causes delays in the production process. In this paper, we propose cluster priority selection algorithm that can quickly and simply determine the selection priority in ball bearing selective assembly system. In addition, we assume the simulated situation with the data collected in the actual ball bearing selective assembly process, and evaluate the incidence of surplus part and runtime by simulating the cluster priority selection algorithm and the exiting algorithm. As a result of the simulation, the cluster priority selection algorithm generated 83.8% less surplus parts, and 39.7% less runtime than the existing algorithm.

  • PDF

A Study on the Queueing priority in Communication Network (통신망에 있어서의 큐잉우선도에 관한 연구)

  • 김영동;이재호;송영재
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.10 no.5
    • /
    • pp.218-228
    • /
    • 1985
  • The input messages in communication network are processed according to their priority. If the messages which are had different types of priority are excessively entered to communication network in such prioruty process, and if high priority messages are continuously entered, the messages which are had law priority are experinenced delay beyond their priority. In this case, we proposed average delay compensation method to compensate contonuous delay in low priority messages.

  • PDF

Development of a Cross-impact Hierarchical Model for Deciding Technology Priority (기술우선도 결정을 위한 상호영향 계층분석모형의 개발)

  • 권철신;조근태
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.1
    • /
    • pp.1-17
    • /
    • 2002
  • The objective of this paper is to develop a new priority setting algorithm that considers the cross-impact of the future technology alternatives and that satisfies the final goal of the technology management through multi-hierarchy evaluation criteria. By combining the Analytic Hierarchy Process (AHP) model, which is a well-known priority setting model, and Cross Impact Analysis (CIA) model, which is a technological forecasting method that considers cross-impact among R&D Items, we developed an Integrated Cross-Impact Hierarchical (CIH) model, which sets the priority by considering technological forecasting and technology dependency simultaneously. A step-by-step numerical example of the model developed here is presented as backup of its practicality.

Analysis of the Priority of Evaluation Criteria and Detailed Index for Selecting Street Trees (가로수 선정 평가기준과 세부지표의 중요도 분석)

  • Kim, Min Kyung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.42-53
    • /
    • 2021
  • Street trees improve the cityscape and air quality, reduce heat islands, and create wildlife habitats. Hence, they are essential parts of a city's green infrastructure. Therefore, several trees that are well adapted to the urban environment were planted. However, this caused the problem of simple trees being planted around the world. This study is to select more various street trees. To accomplish this, evaluation criteria and detailed indexes were created. The importance was indicated through the Analytic Hierarchy Process. For commercial roads, the priority of landscape characteristics is 0.2640, and among detailed indicators, the priority of shape is 0.1245. For work roads, the priority of landscape characteristics is 0.2496, and among detailed indicators, the priority of shape is 0.1177. For work roads, the priority of characteristics of civil service is 0.2250, and among detailed indicators, the priority of shape is 0.1177. For general roads, the priority of maintenance characteristics is 0.2479, and among detailed indicators, the priority of shape is 0.1062. For historical and cultural roads, the priority of regional characteristics is 0.3488, and among detailed indicators, the priority of regional characteristics is 0.1643. For ecological roads, the priority of ecosystem characteristics is 0.3488, and among detailed indicators, the priority of the diversity of species is 0.1643. For automotive-only roads, the priority of the ecosystem characteristics is 0.4639, and among detailed indicators, the priority of reducing emissions is 0.1643. This study will provide objective criteria for the selection of street trees.

Priority Setting for Future Core Technologies in Biosystems Engineering using the Analytic Hierarchy Process (AHP를 이용한 기계화분야 미래유망기술의 우선순위 설정)

  • 이종인;김만수;조근태;김재한
    • Journal of Biosystems Engineering
    • /
    • v.29 no.2
    • /
    • pp.187-194
    • /
    • 2004
  • The study focused on setting priority among the future core technologies that were derived by Delphi in agricultural management & information using analytic hierarchy process(AHP). Items for setting priority were decided as ‘technology’, ‘market’, and ‘public concerns’by council. The future core technologies were divided into four parts by importance and R&D level. Technologies which consisted of upper two parts having higher importance were considered in the study. Questionnaires were given to 9 specialists in biosystems engineering. As the results, ‘market’ was decided as a most important item. The most important technologies were ‘Developing technology and system of post harvest processing for higher quality rice’ in group I, and ‘Developing sensor technology to evaluate quality and safety for agricultural products’ in group II.

A Study on the Strategic Priority for Defense Quality Management Factors by using Analytic Hierarchy Process (AHP기법을 활용한 국방품질경영요소의 전략적 우선순위 도출에 관한 연구)

  • Kim, Soon-Yeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.217-224
    • /
    • 2012
  • This study is to review strategic priority for Defense Quality Management Factors of the Defense Agency for Technology and Quality. It is necessary to decide which quality factors are more important and which quality factors are relatively less important. In this study, Analytic Hierarchy Process (AHP) method was used in assigning the factors' weights. The survey of fifty one members participated in Defense R&D Programs showed that the Consistency Ratio was under 0.1 in evaluation items and factors.