• 제목/요약/키워드: Process Cost

검색결과 7,681건 처리시간 0.033초

Cost analysis on renewable warranty policies subject to imperfect strategies using inter-failure intervals

  • Park, Minjae
    • International Journal of Reliability and Applications
    • /
    • 제14권1호
    • /
    • pp.41-54
    • /
    • 2013
  • In this paper, cost analysis is conducted using inter-failure interval under renewable warranty subject to imperfect repair for multi-component system. One way to model the imperfect repair is to use the quasi-renewal process (Wang and Pham 1996). Two alternative quasi-renewal processes were suggested by Park and Pham (2010) using quasi-renewal process; first is an altered quasi-renewal process with random variable parameter and second is a mixed quasi-renewal process considering replacement service and repair service, simultaneously. In this study, we use the altered and mixed quasi-renewal processes and develop the warranty cost model to obtain the expected value of warranty cost and to help company make important decisions regarding the warranty policy. Numerical examples are used to demonstrate the applicability of the methodology derived in the paper.

  • PDF

Effects of Reactor Type on the Economy of the Ethanol Dehydration Process: Multitubular vs. Adiabatic Reactors

  • Yoo, Kee-Youn
    • Korean Chemical Engineering Research
    • /
    • 제59권3호
    • /
    • pp.467-479
    • /
    • 2021
  • Abstract: A kinetic model was developed for the dehydration of ethanol to ethylene based on two parallel reaction pathways. Kinetic parameters were estimated by fitting experimental data of powder catalysts in a lab-scale test, and the effectiveness factor was determined using data from pellet-type catalysts in bench-scale experiments. The developed model was used to design a multitubular fixed-bed reactor (MTR) and an adiabatic reactor (AR) at a 10 ton per day scale. The two different reactor types resulted in different process configurations: the MTR consumed the ethanol completely and did not produce the reaction intermediate, diethyl ether (DEE), resulting in simple separation trains at the expense of high equipment cost for the reactor, whereas the AR required azeotropic distillation and cryogenic distillation to recycle the unreacted ethanol and to separate the undesired DEE, respectively. Quantitative analysis based on the equipment and annual energy costs showed that, despite high equipment cost of the reactor, the MTR process had the advantages of high productivity and simple separation trains, whereas the use of additional separation trains in the AR process increased both the total equipment cost and the annual energy cost per unit production rate.

설계평가를 위한 제조비용산정 시스템 (Cost Estimation System for Design Evalution)

  • 박홍석;이규봉
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2000년도 추계학술대회 논문집
    • /
    • pp.281-284
    • /
    • 2000
  • For estimation manufacturing cost during the early design stage, desingers have to know compositon of manufacturmg cost. Manufacturing cost is summalion of material cost and processmg cost. To be able to control the manufacturmg cost, it is necessary to estimate the costs adequately and to store the cost data in a generic way. a generic system, which is the basis for the control of the production costs, takes into account geometric information, material information, process information and production planning information Manufacturing cost is summation of material cost and processing cost.

  • PDF

RAM 파라미터와 비용을 고려한 설계대안 분석 프로그램 개발 (Development of Design Alternative Analysis Program Considering RAM Parameter and Cost)

  • 김한솔;최성대;허장욱
    • 한국기계가공학회지
    • /
    • 제18권6호
    • /
    • pp.1-8
    • /
    • 2019
  • Modern weapon systems are multifunctional, with capabilities for executing complex missions. However, they are required to be highly reliable, which increases their total cost of ownership. Because it is necessary to produce the best results within a limited budget, there is an increasing interest in development, acquisition, and maintenance costs. Consequently, there is a need for tools that calculate the lifecycle costs of weapons systems development to facilitate decision making. In this study, we propose a cost calculation function based on the Markov process simulator-a reliability, availability, and maintainability analysis tool developed by applying the Markov-Monte Carlo method-as an alternative to these requirements to facilitate decision-making in systems development.

Design of On-line Process Control with Variable Measurement Interval

  • Park, Changsoon
    • Journal of the Korean Statistical Society
    • /
    • 제29권3호
    • /
    • pp.319-336
    • /
    • 2000
  • A mixed model with a white noise process and an IMA(0,1,1) process is considered as a process model. It is assumed that the process is a white noise in the absence of a special cause and the process changes to an IMA(0,1,1) due to a special cause. One useful scheme in measuring the process level is to use the variable measurement interval (VMI) between measurement times according to the value of the previous chart statistic. The advantage of the VMI scheme is to measure the process level infrequently when in control to save the measurement cost and to measure frequently when out of control to save the off-target cost. This paper considers the VMI scheme in order to detect changes in the process model from a white noise to an IMA(0,1,1). The VMI scheme is shown to be effective compared to the standard fixed measurement interval (FMI) scheme in both statistical and economic contexts.

  • PDF

이차손실함수를 이용한 유동적인 공정수행척도 (Flexible Process Performance Measures by Quadratic Loss Function)

  • 정영배
    • 산업경영시스템학회지
    • /
    • 제18권36호
    • /
    • pp.275-285
    • /
    • 1995
  • In recent years there has been increasing interest in the issue of process centering in manufacturing process, The traditional process capability indices Cp, Cpk and Cpu are used to provide measure of process performance, but these indices do not represent the issue of process centering. A new measure of the process capability index Cpm is proposed that takes into account the proximity to the target value as well as the process variation when assessing process performance. However, Cpm only considers acceptance cost for deviation from target value within specification limits, do not includes economic consideration for rejected items. This paper proposes flexible process performance measures that considered quadratic loss function caused by quality deviation within specification limits, rejection cost associated with the disposition of rejected items, and inspection cost. In this model disposition of rejected items are considered under perfect corrective procedures and the absence of perfect corrective procedures.

  • PDF

모래여과 공정과 막여과 공정의 운영효율 비교 (Comparison of operational efficiency between sand-filtration process and membrane filtration process)

  • 변광진;장은수
    • 상하수도학회지
    • /
    • 제31권6호
    • /
    • pp.529-537
    • /
    • 2017
  • Membrane filtration process is an advanced water treatment technology that has excellently removes turbidity and microorganisms. However, it is known that it has problems such as low economic efficiency and the operating stability. Therefore, this study was to evaluate on the economical feasibility and operational stability comparison of membrane and sand filtration process in Im-sil drinking water treatment plant. For the economic analysis of each process, the electricity cost and chemical consumption were compared. In the case of electric power consumption, electricity cost is $68.67KRW/m^3$ for sand filtration and $79.98KRW/m^3$ for membrane filtration, respectively. Therefore, membrane filtration process was about 16% higher than sand filtration process of electricity cost. While, the coagulant usage in the membrane filtration process was 43% lower than the sand filtration process. Thus, comparing the operation costs of the two processes, there is no significant difference in the operating cost of the membrane filtration process and the sand filtration process as $85.94KRW/m^3$ and $79.71KRW/m^3$ respectively (the sum of electricity and chemical cost). As a result of operating the membrane filtration process for 3 years including the winter season and the high turbidity period, the filtrated water turbidity was stable to less than 0.025 NTU irrespective of changes in the turbidity of raw water. And the CIP(Clean In Place) cycle turned out to be more than 1 year. Based on the results of this study, the membrane filtration process showed high performance of water quality, and it was also determined to have the economics and operation stability.

다중이상원인하의 경제적 품질비용 정책결정 (Determination of Quality Cost Policy under the Multiple Assignable Causes)

  • 김계완;박지연;윤덕균
    • 한국산업경영시스템학회:학술대회논문집
    • /
    • 한국산업경영시스템학회 2002년도 춘계학술대회
    • /
    • pp.1-8
    • /
    • 2002
  • At present, company has to produce a product that consumer like with a competitive price, a good quality, and a fitting time to supply. Process control and qualify control are very important to supply with a product uniformly and inexpensively In this paper, the characteristic of product quality is monitored by control chart during the machining process and construction of quality control cycle is considered to divide into two types in this case that different assignable causes lead to shifts having different magnitudes. Then we are intended to find a process shift magnitude which has economical quality cost policy and are considered to quality cost functions to find a process shift magnitude. Those costs are categorized into the well-known categories of prevention, appraisal, and internal failure and external failure. This paper ends with numerical examples that demonstrate the usefulness of the model.

  • PDF

객체지향 캐드시스템을 활용한 견적관리 시스템 연구 (A study on Cost~Estimating System based on Object- oriented Cad System)

  • 송춘동
    • 한국디지털건축인테리어학회논문집
    • /
    • 제1권1호
    • /
    • pp.46-50
    • /
    • 2001
  • It is known that to automate the quantity take-off process enables you to increase the productivity best among the construction business field. However, the limitation of 2D(Two-dimension) CAD System prevented a cost-estimating system which makes the great effects on the quantity take-off process from being developed. This study aims that you can automate both the itemized statements and the quantity take-off process by using commercially available object-oriented CAD system. The commercially available CAD system today does not give us entire satisfaction. This study shows the deduction of the old boundaries of the object-oriented CAD system and the solution of those problems. And it also studied about the quantity take-off process and the automated cost-estimating system that can be used in the simple and plain repair-maintenance work such as the execution drawing which doesn't need the complicated drawings.

  • PDF

총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구 (A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process)

  • 김경백;이가연;김상범
    • 한국건설관리학회논문집
    • /
    • 제21권2호
    • /
    • pp.30-38
    • /
    • 2020
  • 국내 공공 건설공사 공사비 수준이 시장 상황을 합리적으로 반영하지 못하고 있는 인식이 산업 전반에 널리 펴져 있는 가운데, 총사업비 관리 프로세스 상의 과도한 공사비 조정이 공사비의 적정성 미확보에 대한 핵심 원인 중 하나로 지목되고 있다. 정부는 건설 프로젝트 총사업비 산정 및 관리 프로세스에서 삭감 위주의 정책을 펼치고 있으며, 산업계에서는 예정가격 대비 낙찰가격의 수준은 매우 낮다는 인식이 일반적이다. 본 연구에서는 총사업비 관리 프로세스를 개선하기 위한 목적으로 총사업비 산정 및 관리 프로세스에 대한 분석을 수행한다. 입·낙찰 방식별 총사업비가 단계별 조정되는 과정을 분석하고, 사업구상 단계 대비 낙찰가격의 수준에 대한 정량적 비교분석 결과를 도출한다.