Browse > Article
http://dx.doi.org/10.14775/ksmpe.2019.18.6.001

Development of Design Alternative Analysis Program Considering RAM Parameter and Cost  

Kim, Han-sol (Department of Mechanical System Engineering, Kumoh National Institute of Technology)
Choi, Seong-Dae (Department of Mechanical System Engineering, Kumoh National Institute of Technology)
Hur, Jang-wook (Department of Mechanical System Engineering, Kumoh National Institute of Technology)
Publication Information
Journal of the Korean Society of Manufacturing Process Engineers / v.18, no.6, 2019 , pp. 1-8 More about this Journal
Abstract
Modern weapon systems are multifunctional, with capabilities for executing complex missions. However, they are required to be highly reliable, which increases their total cost of ownership. Because it is necessary to produce the best results within a limited budget, there is an increasing interest in development, acquisition, and maintenance costs. Consequently, there is a need for tools that calculate the lifecycle costs of weapons systems development to facilitate decision making. In this study, we propose a cost calculation function based on the Markov process simulator-a reliability, availability, and maintainability analysis tool developed by applying the Markov-Monte Carlo method-as an alternative to these requirements to facilitate decision-making in systems development.
Keywords
Condition Monitoring; RAM Parameter; Markov Process; Acquisition Cost; Operation Support Cost; Life Cycle Cost; Cost Estimating; Design alternative;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Jackson, Y., Tabbagh, P., Gibson, P., Seglie, E., "The new Department of Defense (DOD) guide for achieving and assessing RAM," Annual Reliability and Maintainability Symposium, pp. 1-7, 2015.
2 Kang, D. H., Ranjit, S., Chung, Y. J., Kim, W. T., "A Precedent Research on Personal Armor and Anti-stab Wearing System Development", J. Korean Soc. Mech. Technol, Vol. 20, No. 6, pp.879-885, 2018.   DOI
3 Park, C. K., "The Study on Optimum Design of Main Control Valve", J. Korean Soc. Mech. Technol, Vol. 20, No. 2, pp.238-245, 2018.   DOI
4 Cho, S. H., "A Study on Performance Calculation Option for M&V of Power Demand Management Investment Project", J. Korean Soc. Mech. Technol, Vol. 20, No. 5, pp.697-701, 2018.   DOI
5 Kim, K. M., Park, J. C., Yin, J. J., "Optimization of Sheet Metal Forming Process Using Designer's Desirability Functionl", J. Korean Soc. Mech. Technol, Vol. 20, No. 5, pp.556-561, 2018.   DOI
6 Paul, R. A., "DoD towards software services," 10th IEEE International Workshop on Object-Oriented Real-Time Dependable Systems, pp. 3-6, 2005.
7 Sohn, J. M., Chang C. M., Won, Y. D., “A Case Study of RAM Analysis Using Field Data: Focusing on Korean Warship,” The Journal of the Korea Contents Association, Vol. 12, No. 12, pp. 1598-4877, 2012.
8 Jentsch, P. C., Boukhtouta, A., "A Simulation Study Of Military Land Equipment Availability Under Corrective And Preventive Maintenance Regimes," 29th European Conference on Modelling and Simulation, pp. 373-379, 2015.
9 Billinton, R., Wang, P., “Distribution system reliability cost/worth analysis using analytical and sequential simulation techniques,” IEEE Transactions on Power Systems, Vol. 13, No. 4, pp. 1245-1250, 1998.   DOI
10 Song, J. S., Krishnamurthy, V., Kwasinski, A., Sharma, R., “Development of a Markov-Chain-Based Energy Storage Model for Power Supply Availability Assessment of Photovoltaic Generation Plants,” IEEE Transactions on Sustainable Energy, Vol. 4, No. 2, pp. 491-500, 2013.   DOI
11 Kendall, A., Keoleian, G. A., Helfand, G. E., “Integrated Life-Cycle Assessment and Life-Cycle Cost Analysis Model for Concrete Bridge Deck Applications,” Journal of Infrastructure Systems, Vol. 14, No. 3, pp. 214-222, 2008.   DOI
12 Blanchard, B. S., Systems engineering and analysis, Pearson, pp. 747-755, 1990.