• Title/Summary/Keyword: Process Cost

Search Result 7,681, Processing Time 0.03 seconds

Cost-Oriented QC and Process-Oriented QC; Which is more Desirable Approach?

  • Lee, Sang-Do;Lee, Dong-Choon
    • Journal of Korean Society for Quality Management
    • /
    • v.13 no.2
    • /
    • pp.2-7
    • /
    • 1985
  • This paper introduces two approaches of the cost-oriented QC and the process-oriented QC, and compares them on several aspects. The cost-oriented QC tries to assure the specified quality level by sampling inspection within minimum quality cost, while the process-oriented QC aims at realization of target value of quality specification through process adjustment when a product deviates from the target. But the final purpose of both approaches is on quality assurance for markets and consumers. After all, desirability is a question of quality cost. This paper suggests two of cost functions for decision making criterion.

  • PDF

Contract Awarding Process and its Reasonable Improvement for Defense Acquisition (공공사업 경쟁입찰에서 낙찰자 결정방법분석 및 국방획득사업의 합리적인 사업자결정 방안)

  • Eo, Hajoon;Kim, Sung-Chul
    • Journal of Information Technology Services
    • /
    • v.14 no.2
    • /
    • pp.69-86
    • /
    • 2015
  • The current contract awarding process regulated by laws and ordinances is analyzed and more reasonable processes are suggested. To this end, the principle of economic analysis is described with emphasis on the cost-effectiveness analysis, and the laws and ordinances regulating the process are thoroughly examined. The current contract awarding rule is based on the weighted sum of effectiveness score and cost score. This may not conform to the framework of economic analysis where effectiveness is supposed to be measured as an output and cost measured as an input. An improvement is attempted to the defense acquisition system and it is recognized that the economic analysis and policy consideration should be performed separately. Concept of statistical testing is introduced to see if the results of the cost effectiveness analyses show the significant difference between the alternatives. It is suggested that the contract awarding process can be improved by performing significance test followed by the aggregation of the two analyses. A minor improvement is also suggested on the application of current rules.

Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study (BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구)

  • Won, Jongsung;Ham, Sungil;Jang, Sejun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.

Cost-Efficient and Automatic Large Volume Data Acquisition Method for On-Chip Random Process Variation Measurement

  • Lee, Sooeun;Han, Seungho;Lee, Ikho;Sim, Jae-Yoon;Park, Hong-June;Kim, Byungsub
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.15 no.2
    • /
    • pp.184-193
    • /
    • 2015
  • This paper proposes a cost-efficient and automatic method for large data acquisition from a test chip without expensive equipment to characterize random process variation in an integrated circuit. Our method requires only a test chip, a personal computer, a cheap digital-to-analog converter, a controller and multimeters, and thus large volume measurement can be performed on an office desk at low cost. To demonstrate the proposed method, we designed a test chip with a current model logic driver and an array of 128 current mirrors that mimic the random process variation of the driver's tail current mirror. Using our method, we characterized the random process variation of the driver's voltage due to the random process variation on the driver's tail current mirror from large volume measurement data. The statistical characteristics of the driver's output voltage calculated from the measured data are compared with Monte Carlo simulation. The difference between the measured and the simulated averages and standard deviations are less than 20% showing that we can easily characterize the random process variation at low cost by using our cost-efficient automatic large data acquisition method.

Low-Cost Fabrication of Multimode Optical Waveguides for Optical Interconnects (광 연결을 위한 저가형 멀티모드 광 도파로의 제작)

  • 이병탁;권민석;윤준보;신상영
    • Proceedings of the IEEK Conference
    • /
    • 1999.06a
    • /
    • pp.315-318
    • /
    • 1999
  • As low-cost optical waveguides of optical interconnects, we fabricate multimode optical waveguides using a molding process The core size of a optical waveguide is 47 ${\mu}{\textrm}{m}$ $\times$ 41 ${\mu}{\textrm}{m}$. We use the photoresist AZ9260 as a master, polydimethyl-siloxane (PDMS) as a mold. In transferring process to polymeric material, we employ a modified micro-transfer molding process. All processes are simple and low-cost.

  • PDF

A Study for Reliability Target Setting Considering Warranty Cost and Reliability Analysis Result of Process Controller in Nuclear Power Plant (원자력 발전소용 공정 제어기의 보증 비용을 고려한 신뢰도 목표치 설정과 신뢰도 분석 결과에 대한 연구)

  • Kim, Gun Myung
    • Journal of Applied Reliability
    • /
    • v.15 no.3
    • /
    • pp.145-148
    • /
    • 2015
  • The products to meet the requirement of are installed in nuclear power plant and the reliability target should be provided in the requirement. However, it is not easy to set a reliability target using quantitative analysis. The objective of this paper is to propose a method of reliability target setting considered warranty cost for process controller and then compare a reliability target with reliability analysis result.

Determination of Optimal Mean Value and Screening Limit for a Production Process with Logistic Function (로지스틱 함수를 갖는 생산공정에 대한 최적공정평균 및 스크리닝 한계선의 결정)

  • Hong, Sung Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.29 no.3
    • /
    • pp.239-246
    • /
    • 2003
  • Individual items are produced continuously from an industrial process. Each item is checked to determine whether it satisfies a lower screening limit for the quality characteristic which is the weight of an expensive ingredient. If it does, it is sold at a regular price; if it does not, it is reprocessed or sold at a reduced price. The process mean may be adjusted to a higher value in order to reduce the proportion of the nonconforming items. Using a higher process mean, however, may result in a higher production cost. In this paper, the optimal process mean and lower screening limit are determined in situations where the probability that an item functions well is given by a logistic function of the quality characteristic. Profit models are constructed which involve four price/cost components; selling prices, cost from an accepted nonconforming item, and reprocessing and inspection costs. Methods of finding the optimal process mean and lower screening limit are presented and numerical examples are given.

INTEGRATION MODEL OF COST AND SCHEDULE IN STEEL BOX GIRDER BRIDGE PRODUCTION PROCESS

  • Seok Kim;Kyoungmin Kim;Seung-Ho Ha ;Kyong Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1262-1267
    • /
    • 2005
  • It is still difficult to share and utilize the information generated at each phase of a steel box girder production process due to the spatial gap and different level of management information. The physical distance results in the inefficiency of the information transmission, the accidental omission and typos of the relative information, and so on. Various levels of management information make it difficult to embody a new management system. Eventually, these factors incur the loss of cost and schedule and interrupt development of a new management system. This paper analyzes a current process and presents graphical process flow by using IDEF0. Based this analysis, the research for new production process and work breakdown structure (WBS) is conducted. At the end of this paper, the conceptual design of this system is suggested. Through new management system, it is expected that the model proposed in this study will improve the management process in the steel box production, and the improved process will reduce the redundant cost and schedule information, transmission and deposit generated by manual paper.

  • PDF

A Study on Machinability and Cost Evaluation of MQL Milling Process (MQL 밀링가공의 가공성 및 비용 평가에 관한 연구)

  • Lee, Ji-Hyung;Ko, Tae-Jo;Baek, Dae-Gyun
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.26 no.2
    • /
    • pp.26-34
    • /
    • 2009
  • This paper is related to MQL (Minimum Quantity Lubrication) milling process, which is one of the environmentally friendly cuttings. The objective is to compare MQL milling process with conventional cutting fluid systems. To this end, machinability of MQL milling process was investigated, followed by the cost evaluation. Cutting force, surface roughness, tool wear, and cutting temperature were compared with each cutting fluid method. Consequently, total production costs wear evaluated with the mathematical models in terms of machining cost and cutting fluid loss.

The Cost Impact of Incorrect Assumptions in a Supply Chain

  • Kim, Heung-Kyu
    • Management Science and Financial Engineering
    • /
    • v.10 no.2
    • /
    • pp.29-51
    • /
    • 2004
  • In this paper, the cost impact of incorrect assumptions about the demand process in a supply chain in which there are two participants, a retailer and a manufacturer, is considered. When participants in the supply chain do not notice serial correlation in the demand process, they would turn to a simple inventory model based on an i.i.d. demand assumption. A mathematical model that allows us to quantify the cost incurred by each participant in the supply chain, when they implement inventory policies based on correct or incorrect assumptions about the demand process, is developed. This model enables us to identify how much it differs from the optimal costs.