• Title/Summary/Keyword: Procedure Management

Search Result 3,055, Processing Time 0.035 seconds

An Optimal Design Procedure based on the Safety Integrity Level for Safety-related Systems

  • Kim, Sung Kyu;Kim, Yong Soo
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제12권12호
    • /
    • pp.6079-6097
    • /
    • 2018
  • Safety-related systems (SRSs) has widely used in shipbuilding and power generation to prevent fatal accidents and to protect life and property. Thus, SRS performance is a high priority. The safety integrity level (SIL) is the relative performance level of an SRS with regard to its ability to operate reliably in a safe manner. In this article, we proposed an optimal design procedure to achieve the targeted SIL of SRSs. In addition, a more efficient failure mode and effects diagnostic analysis (FMEDA) process and optimization model were developed to improve cost efficiency. Based on previous IEC 61508 diagnostic analyses that revealed unnecessary costs associated with excessive reliability, the new approach consists of two phases: (i) SIL evaluation by FMEDA, and (ii) solution optimization for achieving the target SIL with minimal cost using integer-programming models. The proposed procedure meets the required safety level and minimizes system costs. A case study involving a gas-detection SRS was conducted to demonstrate the effectiveness of the new procedure.

FUNCTION ORIENTED VE ALTERNATIVES EVALUATION PROCEDURE USING FUNCTION CLASSIFICATION

  • Jong-Hyeob Kim;Chang-Taek Hyun;Taehoon Hong
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1195-1200
    • /
    • 2009
  • Two important concepts in VE are "function" and "cost." Cost can be expressed quantitatively. Unlike cost, the function can only be expressed qualitatively. Thus, to accurately evaluate the performance in VE analysis, it is required that the functional aspect should be considered a qualitative one. This study suggests a procedure of function oriented evaluation which can evaluate function enhancement of a VE proposal more logically and objectively. To conduct this study, problems were induced via case analysis, and solutions were found. In addition, the existing simple evaluation procedures were corrected, and a function enhancement evaluation procedure via function classification was suggested. For function classification, the use of the concepts, which were "intended function" and "additionally obtained function," was suggested. Function oriented evaluation procedure to VE proposals which is suggested in this study is expected to be a great help in treating valuable functions through VE job plan.

  • PDF

THE SELECTION OF COLOR SCHEME FOR 4D CONSTRUCTION MODEL

  • Han-Shuo Chang;Shih-Chung Kang;Po-Han Chen
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.323-330
    • /
    • 2009
  • This paper presents the selection, examination, and user test (SEUT) procedure to determine the ideal color scheme for a 4D model. This systematic procedure can be performed iteratively to obtain the color scheme that would be most appropriate for construction purposes. To verify the proposed procedure, an example case with two iterations is presented. Ten color schemes were examined and 48 users tested during the two iterations, and the result shows that the SEUT procedure is an effective method for determining the ideal color scheme for 4D models.

  • PDF

FMEA에서 공통원인고장이 포함될 경우의 고장원인에 대한 위험평가 절차 (A Risk Evaluation Procedure in FMEA for Failure Causes including Common Cause Failures)

  • 김병남;권혁무;홍성훈;이민구
    • 품질경영학회지
    • /
    • 제46권2호
    • /
    • pp.327-338
    • /
    • 2018
  • Purpose: A risk evaluation procedure is proposed for common failure causes in FMEA(Failure Mode and Effects Analysis). The conventional FMEA does not provide a proper means to compare common failure causes with other failure causes. This research aims to develop a risk evaluation procedure in FMEA where common failure causes and other failure causes exist together. Methods: For each common failure cause, the effect of each combination of its resulting failures is recommended to be reevaluated considering their interactive worsening effect. And the probability that each combination of failures is incurred by the same common cause is also considered. Based on these two factors, the severity of each common cause is determined. Other procedures are similar to the conventional method. Results: The proposed procedure enables to compare and prioritize every failure cause. Thus, the common causes, each of which incurring two or more failures, and other causes, each of which is corresponding to one failure, can be fairly compared. Conclusion: A fair and proper way of comparing the common failure causes and other causes is provided. The procedure is somewhat complicated and requires more works to do. But it is worth to do.

주거시설의 유니버설 디자인을 위한 활동실태조사 및 불편 설계요소 개선 절차 제안 (Investigation of Perceived Discomforts and Suggestion of a Procedure for the Universal Design of Housing)

  • 김충식;이동훈;김희진;정민근
    • 대한인간공학회지
    • /
    • 제29권5호
    • /
    • pp.797-810
    • /
    • 2010
  • This study examined perceived discomforts encountered in residential facilities such as individual houses and apartments, and suggested a procedure for improving the problems in the living residence. The participants consisted of two groups of people: normal and underprivileged people; the underprivileged group was classified into 3 sub-groups: elderly people (over 65 years old), handicapped people and pregnant women. To identify inconvenient places and design factors in the residential housing, a total of 200 subjects (50 for each group) participated in the survey using the 7-point Likert scale. As a result, all the user groups mainly answered a high degree of discomfort due to narrow parking places, doorsills, and height differences between floors. The elderly, the handicapped, and the pregnant women replied that it is uncomfortable to use ramps and utility rooms. In a follow-up study, one-to-one in-depth interviews were conducted with some of the participants to analyze the detailed causes of inconvenient places and design factors. This study also suggested the procedure for solving the problems in various design factors from perspective of universal design, by considering prior studies which focused on a certain user group like the elderly. This procedure was suggested to consider as many user groups as possible at the same time. The results can be used to understand the discomforts of various user groups on residential housing. The procedure can also be used to develop universal design guidelines for the living residence.

원자력시설 해체 규제요건과 기술기준 연계를 통한 요구관리 (Requirement Management through Connection between Regulatory Requirements and Technical Criteria for Dismantling of Nuclear Installations)

  • 박희성;박종선;홍윤정;김정국;홍대석
    • 시스템엔지니어링학술지
    • /
    • 제14권1호
    • /
    • pp.63-71
    • /
    • 2018
  • This paper discusses decommissioning procedure requirements management using requirement engineering to systematically manage the technical requirements and criteria that are required in decontamination and decommissioning activities, and the regulatory requirements that should be complied with in a decommissioning strategy for research reactors and nuclear power plants. A schema was designed to establish the traceability and change management related to the linkage between the regulatory requirements and technical criteria after classifying the procedures into four groups during the full life-cycle of the decommissioning. The results confirmed that the designed schema was successfully traced in accordance with the regulatory requirements and technical criteria required by various fields in terms of decontamination and decommissioning activities. In addition, the changes before and after the revision of the Nuclear Safety Act were also determined. The dismantling procedure requirement management system secured through this study is expected to be a useful tool in the integrated management of radioactive waste, as well as in the dismantling of research reactor and nuclear facilities.

원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리 (Document Management for Jordan Research and Training Reactor Project by ANSIM)

  • 박국남;최민호;권용세
    • 산업경영시스템학회지
    • /
    • 제39권2호
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구 (A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium)

  • 인치성;정순길;김태삼;김근우;도상익
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.73-80
    • /
    • 2001
  • 일반적으로 건설사업관리는 발주자를 위한 방식과 시공자를 위한 방식으로 구분되고 있으나 현재 국내에서는 사업관리 기능을 포함한 감리를 중심으로 대부분의 프로젝트가 진행되고 있는 실정이다. 이로 인하여 사업참여자간의 업무관리가 복잡하고 감리자 및 건설사업관리자가 효율적인 사업관리업무를 수행하는데 어려움이 있다. 따라서 전문화되고 체계적인 사업관리절차를 포함한 통합사업관리시스템의 활용이 어느 때보다 절실히 요구된다. 본 연구에서는 전주월드컵경기장의 CM사례를 통해 현행 CM업무의 현장적용상의 문제점을 분석한 후 통합사업관리시스템과 CM의 발전방향을 구체적으로 제시하는 동시에 현장 CM에 대한 개념구축, CM업무 수행 지침서 작성 등의 현장 건설사업관리업무의 향후 발전방향을 제시하고자 한다.

  • PDF

공역의 구조적 변경에 따른 위험평가 절차 연구 (A study on Risk Assessment Procedure for the Structural changes of Navigable Airspaces)

  • 김도현;김웅이
    • 한국항공운항학회지
    • /
    • 제20권1호
    • /
    • pp.13-18
    • /
    • 2012
  • 'Navigable airspace' means an airspace at and above the minimum safe flight level, including airspace or flight procedures needed for safe takeoff and landing. Airspace may be established as needed and may be abolished, and in some cases may be limited to airspace management. These are absolutely based on risk assessment. Safety is the state in which the risk of harm to persons or of property damage is reduced to, and maintained at or below, an acceptable level through a continuing process of hazard identification and risk management. 'Risk' is the assessed potential for adverse consequences resulting from a hazard and 'Risk assessment' involves consideration of both the frequency and the severity of any adverse consequence. This paper proposed 'risk assessment procedure' for the structural changes of Navigable Airspaces through literature reviews relevant to manuals on airspace management and risk management.

SPC 차트를 이용한 포트폴리오 관리 (Portfolio Management Using Statistical Process Control Chart)

  • 김동섭;류홍서
    • 산업공학
    • /
    • 제20권2호
    • /
    • pp.94-102
    • /
    • 2007
  • Portfolio management deals with decision making on 'when' and 'how' to revise an existing portfolio. In this paper, we show that a classical statistical process control (SPC) chart for normal data, a wellestablished tool in quality engineering, can effectively be used for signaling times for revising a portfolio. Noting that the day-to-day performance of a portfolio may be auto-correlated, we use the exponentially weighted moving average center-line chart to develop an automatic portfolio management procedure. The portfolio management procedure is extensively tested on historical data of equities traded in the Korea Exchange (KRX), the American Stock Exchange (AMEX), and the New York Stock Exchange (NYSE). In comparison with the performances of the KOSPI, XAX, and NYA indices during the same time periods, results from these experiments show that SPC chart-based portfolio revision presents itself a convenient and reliable method for optimally managing portfolios.