• Title/Summary/Keyword: Priority of risk

Search Result 491, Processing Time 0.033 seconds

Fuzzy FMECA analysis of radioactive gas recovery system in the SPES experimental facility

  • Buffa, P.;Giardina, M.;Prete, G.;De Ruvo, L.
    • Nuclear Engineering and Technology
    • /
    • v.53 no.5
    • /
    • pp.1464-1478
    • /
    • 2021
  • Selective Production of Exotic Species is an innovative plant for advanced nuclear physic studies. A radioactive beam, generated by using an UCx target-ion source system, is ionized, selected and accelerated for experimental objects. Very high vacuum conditions and appropriate safety systems to storage exhaust gases are required to avoid radiological risk for operators and people. In this paper, Failure Mode, Effects, and Criticality Analysis of a preliminary design of high activity gas recovery system is performed by using a modified Fuzzy Risk Priority Number to rank the most critical components in terms of failures and human errors. Comparisons between fuzzy approach and classic application allow to show that Fuzzy Risk Priority Number is able to enhance the focus of risk assessments and to improve the safety of complex and innovative systems such as those under consideration.

Basic Study for Development of Risk Based Bridge Maintenance Priority Decision Model (위험도기반 교량 유지관리 우선순위 선정 모델 개발을 위한 기초연구)

  • Kim, Dongiin;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.108-116
    • /
    • 2017
  • It is expected that the maintenance cost of domestic bridges will increase considerably due to the increase of bridge service time. In response to this situation, the government and relevant ministries are focusing on developing ways to efficiently allocate limited budgets and to rationally select maintenance bridge. In this study, to develop a risk - based bridge maintenance priority decision model, 14 common risk factors causing damage to bridges were extracted and AHP analysis was performed to select 5 important factors. Based on the existing literature review and expert consultation, we derive the evaluation criteria and the impact weights of the selected factors, and based on this, I presented risk based bridge maintenance priority model. Using this model in combination with existing maintenance priority methods will lead to more reasonable bridge maintenance priorities.

Damage Risk Based Approach for Retrofit Prioritization of Bridges (기존 교량구조물의 내진보강을 위한 우선순위 결정방법)

  • 이상우;김상효;마호성
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.09a
    • /
    • pp.295-302
    • /
    • 2003
  • A quantitative approach for the retrofit prioritization of bridges is developed based on the damage risk of seismic vulnerable components. In the developed approach, seismic damage risk is estimated in the probabilistic perspectives with an analytical bridge model, which can consider various phenomena found in the seismic behaviors of girder-type bridges and damage models of various vulnerable components. Based on the total cost due to failure of structural components, weighting factors are proposed. Finally, the ranking index and retrofit priority of bridges are estimated from the overall damage risk and weighting factors of bridges. As a result, the retrofit priority of four PSC girder bridges is evaluated by using the proposed approach. The vulnerable components in need of seismic retrofit are selected accordingly. From simulated results, the validity of the proposed approach is verified by comparison with the existing approach. In addition, the proposed approach is found to be appropriate in evaluating the priority of existing bridges.

  • PDF

Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase - (해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 -)

  • Jang, Woo-Sik;Hong, Hwa-Uk;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.146-154
    • /
    • 2011
  • Korean contractors have been maintained sustainable growth since entering into overseas construction market for the first time in 1960' s. In 2010, Korean contractors ordered 761 billion (USD) from overseas markets. Especially, billion (USD) were earned by Korean contractors in overseas plant construction market which account for more than 80% of the total amount by Korean contractors. Nevertheless, many Korean contractors are suffering from lack of technological competitiveness and construction management skills in the design phase compared with global leading contractors. These conditions have directly effect on the success of projects in terms of cost, duration, and quality. So, this study focused on identifying the risk factors and developing risk priority method for the design phase of LNG plant projects whose market is expanding. Research procedures were conducted by the following three steps. First, total 57 risk factors were identified in design phase through extensive literature reviews and experts survey. Second, the authors developed risk priority method which are more suitable for design phase of LNG plant projects by using three criteria, Probability(P), Impact(I), and Coordination Index(CI). Finally, the suitability of risk priority method and practical applicability were verified through expert survey and interview. Consequently, if korean contractors use the suggested risk factors and priority method based on their own know-how and experiences, then more reasonable and rational risk management will be conducted in the design phase of LNG plant projects.

Development of Korean Food-Chemical Ranking and Scoring System (Food-CRS-Korea) and Its Application to Prioritizing Food Toxic Chemicals Associated with Environmental Pollutants (환경유래 식품오염물질의 우선순위 선정 기법 (Food-CRS-Korea)의 개발과 적용)

  • Yang, Ji-Yeon;Jang, Ji-Young;Kim, Soo-Hwaun;Kim, Yoon-Kwan;Lee, Hyo-Min;Shin, Dong-Chun;Lim, Young-Wook
    • Environmental Analysis Health and Toxicology
    • /
    • v.25 no.1
    • /
    • pp.41-55
    • /
    • 2010
  • The aims of this study were to develop the suitable "system software" in chemical ranking and scoring (CRS) for the food hazardous chemicals associated with environmental emission and to suggest the priority lists of food contamination by environmental-origined pollutants. Study materials were selected with reference to the priority pollutants list for environment and food management from domestic and foreign research and the number of study materials is 103 pollutants (18 heavy metals, 10 PBTs, 10 EDs, and 65 organic compounds). The Food-CRS-Korea system consisted of the environmental fate model via multimedia, transfer environment to food model, and health risk assessment by contaminated food intake. We have established that health risks of excess cancer risks, hazard quotients (HQs) by chronic toxicity and HQs by reproductive toxicity convert to score, respectively. The creditable scoring system was designed to consider uncertainty of quantitative risk assessment based on VOI (Value-Of-Information). The predictability of the Food-CRS-Korea model was evaluated by comparing the presumable values and the measured ones of the environmental media and foodstuffs. The priority lists based on emissions with background-level-correction are 15 pollutants such as arsenic, cadmium, and etc. The priority lists based on environmental monitoring date are 17 pollutants including DEHP, TCDD, and so on. Consequently, we suggested the priority lists of 13 pollutants by considering the several emission and exposure scenarios. According to the Food-CRS-Korea system, arsenics, cadmium, chromes, DEHP, leads, and nickels have high health risk rates and reliable grades.

CRPN (Customer-oriented Risk Priority Number): RPN Evaluation Method Based on Customer Opinion through SNS Opinion Mining (CRPN(Customer-oriented Risk Priority Number): SNS 오피니언 마이닝을 활용한 고객 의견 기반의 RPN 평가 기법)

  • Yoo, In-Hyeok;Kang, Won-Kyung;Choi, Kyu-Nam;Park, Ji-Yun;Lee, Geon-Ju;Kang, Sung-Woo
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.1
    • /
    • pp.97-108
    • /
    • 2019
  • Purpose: The purpose of this study is to propose a new Risk Priority Number(RPN) evaluation method which analyzes value of product functions by mining customer opinions in Social Network Service(SNS). Methods: A traditional RPN is measured by three evaluation standards (Severity, Occurrence, Detection) which are analyzed by manufacturing engineers and researchers. On the other hand, these standards are analyzed by customers' viewpoints through SNS opinion mining in this research. In order to extract customer feedbacks from textual data sets, the methodology in this paper implies natural language processing, hereby collecting product related data sets and analyzing the opinions automatically. An emotional polarity of an opinion indicates severity, while the number of negative opinion shows occurrence, and the entire number of customer opinion refers to detection. Results: The results of this study are as follows; As a result of the CRPN evaluation, it is confirmed that the features evaluated as risky are highly likely to be improved in the next series. Therefore, CRPN is an effective risk assessment model that reflects customer feedback. Conclusion: Reflecting customer feedback is a useful tool for risk assessment of the product as well as for developing new products and improving existing products.

A Risk Metric for Failure Cause in FMEA under Time-Dependent Failure Occurrence and Detection (FMEA에서 고장발생 및 탐지시간을 고려한 고장원인의 위험평가 척도)

  • Kwon, Hyuck Moo;Hong, Sung Hoon;Lee, Min Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.3
    • /
    • pp.571-582
    • /
    • 2019
  • Purpose: To develop a risk metric for failure cause that can help determine the action priority of each failure cause in FMEA considering time sequence of cause- failure- detection. Methods: Assuming a quadratic loss function the unfulfilled mission period, a risk metric is obtained by deriving the failure time distribution. Results: The proposed risk metric has some reasonable properties for evaluating risk accompanied with a failure cause. Conclusion: The study may be applied to determining action priorities among all the failure causes in the FMEA sheet, requiring further studies for general situation of failure process.

A Study on Risk Management Plan for Container Terminals - with Safety Accidents - (컨테이너터미널의 리스크 관리 방안 연구 - 안전사고를 중심으로 -)

  • Yeun, Dong-Ha;Choi, Yong-Seok;Kim, Sun-Gu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.10a
    • /
    • pp.163-164
    • /
    • 2015
  • This paper analyze a pattern and a cause of safety accident occupied in work filed of container terminals, calculate risk index considering accident frequency and severity, and then provide the relative risk assessment. Based on this, this paper provides the priority of risk reducing method in container terminals, proposes the risk management plan.

  • PDF

Decision of Maintenance Priority Order for Substation Facility through Structural Importance and Fault Analysis (변전설비의 구조적 중요도와 고장 분석을 통한 유지보수 우선순위 선정)

  • Lee, Sung-Hun;Lee, Yun-Seong;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.4
    • /
    • pp.23-30
    • /
    • 2013
  • Reliability Centered Maintenance(RCM) is one of most widely used methods in the modern power system to schedule a maintenance cycle and determine the priority of inspection. A precedence study for the new structure of rearranged system should be performed due to introduction of additional installation. This paper proposes a new method to evaluate the priority of maintenance and inspection of the power system facilities. In order to calculate that risk index, it is required that the reliability block diagram should be analyzed for the power system. Additionally, a fault cause analysis is also performed through the event-tree analysis.

Comparison among with Nursing Records, Nursing Intervention Priority Perceived by Nurse and Nursing Intervention Frequency of General Surgery Department (일반외과 간호기록에서의 중재, 지각한 간호중재의 중요도 및 수행 빈도)

  • Choi, Eun-Hee;Seo, Ji-Yeong
    • Korean Journal of Adult Nursing
    • /
    • v.21 no.3
    • /
    • pp.349-354
    • /
    • 2009
  • Purpose: The purpose of this study was to determine core nursing intervention in nursing records and to compare perceived nursing intervention priority and nursing intervention frequency of general surgery department. Methods: Subjects were 70 nurses who work in the general surgery department. Data was collected using a nursing intervention classification and analyzed by frequency and mean. Results: The most frequent nursing interventions of nursing records were orderly risk management, coping assistance, tissue perfusion management, skin/wound management and nutrition support. Important nursing interventions were tissue perfusion management, respiratory management, electrolyte acid-base management, elimination, peri-operative care. The most frequent nursing interventions were drug management, peri-operative care, risk management, tissue perfusion management, patient education. Conclusion: This study found that nursing records were different from intervention priority and nursing frequency. So further study is needed for finding focused intervention of specific subjects and differences with priority of nursing and frequency of nursing.

  • PDF