Browse > Article
http://dx.doi.org/10.7469/JKSQM.2019.47.3.571

A Risk Metric for Failure Cause in FMEA under Time-Dependent Failure Occurrence and Detection  

Kwon, Hyuck Moo (Department of Systems Management and Engineering, Pukyong National University)
Hong, Sung Hoon (Department of Industrial and Information Systems Engineering, Chonbuk National University)
Lee, Min Koo (Department of Information and Statistics, Chungnam National University)
Publication Information
Abstract
Purpose: To develop a risk metric for failure cause that can help determine the action priority of each failure cause in FMEA considering time sequence of cause- failure- detection. Methods: Assuming a quadratic loss function the unfulfilled mission period, a risk metric is obtained by deriving the failure time distribution. Results: The proposed risk metric has some reasonable properties for evaluating risk accompanied with a failure cause. Conclusion: The study may be applied to determining action priorities among all the failure causes in the FMEA sheet, requiring further studies for general situation of failure process.
Keywords
Failure Mode and Effect Analysis; Action Priority; Failure Cause; Risk Metric;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Srivastava, P., Khanduja, D., and Agrawal, V. P. 2018. "Mitigation of Risk Using Rule Based Fuzzy FMEA Approach," 8th International Conference on Cloud Computing, Data Science & Engineering:26-30.
2 Sun, L., Peng, L., Deng, G. and Chien, K. 2017. "A Novel FMEA Tool Application in Semiconductor Manufacture," Semiconductor Technology International Conference (CSTIC), China:1-4.
3 VDA QMC. 2018. Alignment of VDA and AIAG FMEA Handbooks. http://vda-qmc.de/en/publications/fmea-alignment.
4 Apriliana, A. F., Sarno, R., and Effendi, Y. A. 2018. "Risk Analysis of IT Applications Using FMEA and AHP SAW Method with COBIT 5," International Conference on Information and Communications Technology (ICOIACT):373-378.
5 Kwon, H. M., Hong, S. H., and Lee, M. K. 2013. "An Expected Loss Model for FMEA under Periodic Monitoring of Failure Causes", Journal of the Korean Institute of Industrial Engineers 39(2):143-148.   DOI
6 Fithri, P., Riva, N. A., Susanti, L., and Yuliandra, B. 2018. "Safety Analysis at Weaving Department of PT. X Bogor Using Failure Mode and Effect Analysis (FMEA) and Fault Tree Analysis (FTA)," 5th International Conference on Industrial Engineering and Applications (ICIEA):382-385.
7 Jang, H. A., Lee, M. K., Hong, S. H., and Kwon, H. M. 2016. "Risk Evaluation Based on the Hierarchical Time Delay Model in FMEA", Journal of the Korean Society of Quality Management 44(2):121-138.   DOI
8 Jang, H. A., Yun, W. Y., and Kwon, H. M. 2016. "Risk Evaluation in FMEA when the Failure Severity Depends on the Detection Time", Journal of the Korean Society of Safety 31(4):136-142.   DOI
9 Kwon, H. M., Hong, S. H., Lee, M. K. and Sutrisno, A. 2011. "Risk Evaluation Based on the Time Dependence Expected Loss Model in FMEA", Journal of Korean Society of Safety 26(6):104-110.   DOI
10 Kwon, H. M., Lee, M. K., and Hong, S. H. 2018. "Risk Evaluation of FMEA under a Weibull Time Delay Model," Journal of the Korean Society of Safety 33(32):83-91.
11 Liu, H., Liu, L. and Liu, N. 2013. "Risk Evaluation Approaches in Failure Mode and Effects Analysis: A Literature Review," Expert Systems with Applications 40:828-838.   DOI