DOI QR코드

DOI QR Code

Basic Study for Development of Risk Based Bridge Maintenance Priority Decision Model

위험도기반 교량 유지관리 우선순위 선정 모델 개발을 위한 기초연구

  • Kim, Dongiin (Department of Civil Engineering, Chungnam National University) ;
  • Lee, Minjae (Department of Civil Engineering, Chungnam National University)
  • Received : 2016.12.02
  • Accepted : 2017.03.16
  • Published : 2017.03.31

Abstract

It is expected that the maintenance cost of domestic bridges will increase considerably due to the increase of bridge service time. In response to this situation, the government and relevant ministries are focusing on developing ways to efficiently allocate limited budgets and to rationally select maintenance bridge. In this study, to develop a risk - based bridge maintenance priority decision model, 14 common risk factors causing damage to bridges were extracted and AHP analysis was performed to select 5 important factors. Based on the existing literature review and expert consultation, we derive the evaluation criteria and the impact weights of the selected factors, and based on this, I presented risk based bridge maintenance priority model. Using this model in combination with existing maintenance priority methods will lead to more reasonable bridge maintenance priorities.

국내 교량은 공용 연수의 증가로 인하여 추후 유지관리 비용이 상당히 증가 될 것으로 예상된다. 이에 대응하여 정부와 관련 부처는 한정된 예산을 효율적으로 분배하고, 유지관리 우선순위를 합리적으로 선정할 수 있는 방법 개발에 집중하고 있다. 본 연구는 위험도기반의 유지관리 우선순위 선정 모델을 개발하기 위하여 교량의 파손을 야기하는 일반적인 위험 인자 14개를 선정하고, AHP분석을 수행하여 중요 인자 5개를 선별하였다. 기존 문헌 고찰과 전문가 자문을 통하여 선정된 인자에 대한 평가 기준, 영향도 가중치 등을 도출하였고 이를 활용하여 엑셀시트 기반의 위험도기반 우선순위 선정 기초 모델을 제시하였다. 본 모델을 기존의 유지관리 우선순위 선정 방법과 병행하여 사용한다면 보다 합리적인 교량 유지관리 우선순위를 도출 할 수 있을 것이다.

Keywords

References

  1. Kang, J. M., Lee, D. Y., Park, J. B. and Lee, M. J. (2013). "A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge" Korean Journal of Construction Engineering and Management, KICEM, (13)5, pp. 3-11. https://doi.org/10.6106/KJCEM.2012.13.5.003
  2. Park, S. Y., Oh, E. H., Choi, B. H., and Kim, J. M. (2016). "A Development Direction of Infrastructure Based Disaster Mitigation & Management Intergrated System" Korean Journal of Construction Engineering and Management, KICEM, (17)3, pp. 134-142. https://doi.org/10.6106/KJCEM.2016.17.3.134
  3. Kim, G. H., Kim, D. J., Lim, J. K., Park, M. Y. and Lee, M. J. (2016). "Basic Study on Bridge Asset Management Framework and LOS for Efficient Downtown Bridge Maintenance" Journal of Korea Academia-Industrial cooperation Society, 17(5), pp. 671-679. https://doi.org/10.5762/KAIS.2016.17.5.671
  4. Ministry of Land, Infrastructure and Transport (2016). "2016 Roadworks Manual"
  5. Kwak, K. S., Park, J. H., Chung, M. K. and Woo, H. S. (2006). "Bridge Scour Prioritization and Management System (I)" JOURNAL OF THE KOREAN SOCIETY OF CIVIL ENGINEERS B, 26(2B), pp. 187-195.
  6. Bae, Y. G., and Lee, S. L. (2013). "Ship Collision Risk Assessment and Sensitivity Analysis for Seacrossing Bridges" JOURNAL OF THE KOREAN SOCIETY OF CIVIL ENGINEERS , 33(5), pp. 1753-1763. https://doi.org/10.12652/Ksce.2013.33.5.1753
  7. Korea Expressway Corporation (2013). "Evaluation of the Risk of Bridge Structures against Fire Damage"
  8. Cho, J. S., Gil, H. B., Kim, B. G., Lee, J. H. and Choi, M. J. (2015). "Techniques and Frameworks for Rapid Bridge Replacement after Extreme Events" Korea Expressway Corporation.
  9. Moon, Franklin L., Laning, Jennifer, Lowdermilk, David S., Chase, Steven, Hooks, John and Aktan, A. Emin, (2009). "A Pragmatic, Risk based Approach to Prioritizing Bridges" SPIE, Vol. 7294.
  10. Deco, Alberto and Frangopol, Dan M., (2011). "Risk Assessment of Highway Bridges under Multiple Hazards" Journal of Risk Research, 14, pp. 1057-1089. https://doi.org/10.1080/13669877.2011.571789
  11. Imam, B.M., Chryssanthopoulos, M.K. (2012). "Causes and Consequences of Metallic Bridge Failures" Journal of the International Association for Bridge and Structural Engineering (IABSE) , 22(1). pp. 93-98.