• 제목/요약/키워드: Precast concrete beam

검색결과 211건 처리시간 0.021초

연결 플레이트를 사용한 프리캐스트 콘크리트 모듈러 보의 전단성능 (Shear Behaviour of Precast Concrete Modular Beam Using Connecting Plate)

  • 조창근;노경민;이영학
    • 한국공간구조학회논문집
    • /
    • 제21권4호
    • /
    • pp.65-72
    • /
    • 2021
  • The Precast concrete(PC) modular structures are a method of assembling pre-fabricated unit modules in the construction site. The essential aim of modular structures is to introduce a connection method that can ensure splicing performance and effectively resist shear strength. This study proposed PC module using a connecting plate that can replace splice sleeves and shear keys used in the conventional PC modular structures. To evaluate the splicing performance and shear capacity of the proposed method, the shear test was conducted by fabricating one monolithic reinforced concrete(RC) beam and two PC modular beams with a shear span-to-depth ratio as variables. The experimental results showed that the shear capacity of the PC modular beam was about 89% compared to that of the RC beam, and showed a failure of the RC beam according to the shear span-to-depth ratio. Therefore, it was considered that the connecting plate effectively transferred the stress between each PC module through the joint and ensure integrity. In addition, the applicability of shear strength equation of ACI 318-19 and Zsutty's equation to PC modular beams were evaluated. Results demonstrated that the improved shear strength equations are needed to consider reduction of shear strength in PC modules.

프리캐스트 콘크리트 부재의 현장생산용 증기 양생 방법 개발 연구 (Study on Development of Steam Curing Method for In-situ production of Precast Concrete members)

  • 성수진;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.71-72
    • /
    • 2014
  • Green Frame is a building frame system to construct a column-beam structure using composite precast concrete members. To reduce the cost of producing precast concrete, in-situ production of members is required. However, when the structural members are produced on site, it needs a large space for production. So, "Just-In-Time" production method should be adopted. For Just-In-Time to be realized, the early strength of members should be ensured for them to be transported. Thus, steam curing to secure the early strength is applied in Green Frame. Yet, a large-scale steam curing system is not possible for in-situ production of precast concrete. A smaller steam curing system is needed. In this regard, the study is aimed to develop a new steam curing method applicable to the in-situ production of precast concrete.

  • PDF

Seismic performance assessment of the precast concrete buildings using FEMA P-695 methodology

  • Adibi, Mahdi;Talebkhah, Roozbeh
    • Structural Engineering and Mechanics
    • /
    • 제82권1호
    • /
    • pp.55-67
    • /
    • 2022
  • The precast reinforced concrete frame system is a method for industrialization of construction. However, the seismic performance factor of this structural system is not explicitly clarified in some existing building codes. In this paper, the seismic performance factor for the existing precast concrete building frame systems with cast-in-situ reinforced shear walls were evaluated. Nonlinear behavior of the precast beam-column joints and cast-in-situ reinforced shear walls were considered in the modeling of the structures. The ATC-19's coefficient method was used for calculating the seismic performance factor and the FEMA P-695's approach was adopted for evaluating the accuracy of the computed seismic performance factor. The results showed that the over-strength factor varies from 2 to 2.63 and the seismic performance factor (R factor) varies from 5.1 to 8.95 concerning the height of the structure. Also, it was proved that all of the examined buildings have adequate safety against the collapse at the MCE level of earthquake, so the validity of R factors was confirmed. The obtained incremental dynamic analysis (IDA) results indicated that the minimum adjusted collapse margin ratio (ACMR) of the precast buildings representing the seismic vulnerability of the structures approximately equaled to 2.7, and pass the requirements of FEMA P-695.

반복하중을 받는 하이브리드 프리캐스트 보-기둥 접합부의 성능평가 (Structural Capacity Evaluation of Hybrid Precast Concrete Beam-Column Connections Subjected to Cyclic Loading)

  • 최현기;유창희;최윤철;최창식
    • 콘크리트학회논문집
    • /
    • 제22권3호
    • /
    • pp.325-333
    • /
    • 2010
  • 이 연구에서는 시공성과 경제성이 향상되고 중진 지역에서 사용할 수 있는 새로운 프리캐스트 콘크리트 보-기둥 접합부 상세를 복합구조로 개발하고 실험을 통하여 이를 검증하였다. 이 상세는 기둥 속에 매립된 각형강관과 보U형 단부를 갖는 보 단부에 매립된 플레이트를 볼트로 결합시킬 수 있는 구조로 되어있다. 하이브리드 스틸-콘크리트 접합합부에 앞서 콘크리트가 조기에 파괴되는 것을 막기 위하여 접합부 부분에 ECC(engineered cementitious composite)를 사용하였다. 개발된 접합부 상세에 대한 성능을 검증하기 위하여 보-기둥 접합부 실험체를 계획하여 이에 대한 내진성능 실험을 실시하였다. 내부 접합부에 있어서는 접합부 횡보강근 유무와 현장타성 범위를 변수로 3개의 실험체를 제작하였다. 실험은 기둥에 일정 축력을 가한 상태에서 PC기둥 단부에 액츄에이터를 설치하여 변위제어로써 반복가력 하여 실시하였다. 실험에서 얻은 자료를 접합부 내력, 강성, 에너지 소산능력 등에 대하여 분석하였으며, 그 결과 이 연구에서 제시한 새로운 보-기둥 접합부 상세는 강재와 콘크리트 그리고 ECC 사이에서의 다른 부착 특성 때문에 구조거동에서 차이점이 관찰되었으며, 기준 실험체를 제외한 두 실험체의 경우 ECC 및 철골연결재에 의해 소성힌지를 유도할 수 있는 것으로 나타났다. 그리고 프리캐스트 접합부는 높은 일체성과 모멘트 저항 능력을 보이며 중진 지역에서 사용가능함을 보였다.

보강상세에 따른 프리캐스트 HPFRCC 커플링 보의 내진성능 (Effect of Reinforcement Details on the Seismic Performance of Precast HPFRCC Coupling Beams)

  • 김선우;윤현도;박완신;전에스더
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2005년도 추계 학술발표회 제17권2호
    • /
    • pp.81-84
    • /
    • 2005
  • In order to effectively resist seismic loads, coupling beams must be sufficiently stiff, strong and posses a stable load-deflection hysteretic response. This paper reports experimental data on the seismic performance of precast HPFRCC coupling beams with variable details. Precast HPFRCC coupling beam was tested to evaluate their failure modes. shear behavior, micro crack pattern and energy dissipation. Based on the experimental results, precast coupling beam with diagonal and rhombic details offer greater performance and ductility than coupling beam with normal detail.

  • PDF

A study on rotational behaviour of a new industrialised building system connection

  • Moghadasi, Mostafa;Marsono, Abdul Kadir;Mohammadyan-Yasouj, Seyed Esmaeil
    • Steel and Composite Structures
    • /
    • 제25권2호
    • /
    • pp.245-255
    • /
    • 2017
  • The performance of an Industrialised Building System (IBS) consists of prefabricated reinforced concrete components, is greatly affected by the behaviour of the connection between beam and columns. The structural characteristics parameters of a beam-to-column connection like rotational stiffness, strength and ductility can be explained by load-rotation relationship of a full scale H-subframe under gravitational load. Furthermore, the connection's degree of rigidity directly influences the behaviour of the whole frame. In this research, rotational behaviour of a patented innovative beam-to-column connection with unique benefits like easy installation, no wet work, no welding work at assembly site, using a hybrid behaviour of steel and concrete, easy replacement ability, and compatibility with architecture was investigated. The proposed IBS beam-to-column connection includes precast concrete components with embedded steel end connectors. Two full-scale H-subframes constructed with a new IBS and conventional cast in-situ reinforced concrete system beam-to-column connections were tested under incremental static loading. In this paper, load-rotation relationship and ratio of the rigidity of IBS beam-to-column connection are studied and compared with conventional monolithic reinforced concrete connection. It is concluded that this new IBS beam-to-column connection benefits from more rotational ductility than the conventional reinforced concrete connection. Furthermore, the semi-rigid IBS connection rigidity ratio is about 44% of a full rigid connection.

부착된 프리스트레스 넓은 보-기둥 외부접합부의 유한요소해석 (FE Analysis of Exterior Wide Beam-Column Connections with Bonded Tendon Stress)

  • 이문성;최윤철;임재형;문정호;최창식
    • 한국전산구조공학회논문집
    • /
    • 제21권4호
    • /
    • pp.307-315
    • /
    • 2008
  • PPS(Post-tensioned Precast concrete System)공법은 U자형 PC로 제작된 넓은 보와 PC또는 현장 타설 콘크리트로 제작한 기둥으로 구성되며, PC보와 기둥의 일체성 확보를 위하여 프리스트레스를 도입하였다. 본 연구에서는 포스트텐션을 도입한 넓은 보-기둥 접합부의 구조적 특성을 규명하고, 다양한 변수해석이 가능하기 위한 자료를 제공하고자 유한요소해석 프로그램인 ANSYS을 사용하여 비선형 해석을 수행하였다 콘크리트에 대한 해석요소는 8개의 절점을 가지며 각 절점이 3개의 자유도(X, Y, Z축에 대한 병진 변위)를 갖는 Solid 65요소를 사용하였다. Solid 65요소에서 전단전달계수(Shear-Transfer factor)는 실험값에 근사적으로 해석값을 맞추기 위한 영향 계수값으로 균열이 발생하는 위치에 대한 전단강도의 감소를 반영한다. 그 결과, 본 실험체에 대한 해석에서는 열려진 전단전달계수 0.125와 닫혀진 전달계수 0.85에 기초하여 해석한 결과 닫혀진 전단전달계수는 0.85에서 열려진 전단전달계수에서는 0.2일때 가장 실험값에 근사한 해석치를 보였다.

휨과 비틀림을 동시에 받는 PSC 역티형보와 직사각형보의 거동 비교 (Comparison on Flexural and Torsional Behaviors of Inverted Tee and Rectangular Precast Pretensioned Concrete Beams)

  • 설동재;유승룡
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2003년도 가을 학술발표회 논문집
    • /
    • pp.190-193
    • /
    • 2003
  • Flexural-torsional behaviors of the typical architectural precast beam sections - inverted tee and rectangular - were compared. The inverted-tee beams were designed with a parking live load - 500kgf/$\textrm{m}^2$ and a market-1,200kgf/$\textrm{m}^2$ according to the currently used typical shape in the domestic market building site. The rectangular beams were also designed as the same bottom dimension and area, and reinforced for similar strength as in the cases of inverted tee beams. Two rectangular and two inverted precast pretensioned concrete beams were tested and analyzed

  • PDF

Behavior of simple precast high-strength concrete beams connected in the maximum bending moment zone using steel extended endplate connections

  • Magdy I. Salama;Jong Wan Hu;Ahmed Almaadawy;Ahmed Hamoda;Basem O. Rageh;Galal Elsamak
    • Steel and Composite Structures
    • /
    • 제50권6호
    • /
    • pp.627-641
    • /
    • 2024
  • This paper presents an experimental and numerical study to investigate the behavior of the precast segmental concrete beams (PSCBs) utilizing high-strength concrete (HSC) connected in the zone of the maximum bending moment using steel extended endplate connections (EECs). The experimental study consisted of five beams as follows: The first beam was the control beam for comparison, which was an unconnected one-piece beam made of HSC. The other four other beams consisted of two identical pieces of precast concrete. An important point to be noted is that at the end of each piece, a steel plate was used with a thickness of 10 mm. Moreover, this steel plate was welded to the lower and upper reinforcing bars of the beam. Furthermore, the steel plate was made to connect the two pieces using the technique of EECs. Several variables were taken in these four beams, whether from the shape of the connection or enhancing the behavior of the connection using the post-tensioning technique. EECs without stiffeners were used for some of the tested beams. The behavior of these connections was improved using stiffeners and shear bolts. To get accurate results, a comparison was made between the behaviors of the five beams. Another important point to be noted is that Abaqus and SAP2000 programs were used to investigate the behavior of PSCBs and to ensure the accuracy of the modeling process which showed a good agreement with the experimental results. Additionally, the simplified modeling using SAP2000 was able to model the nonlinear behavior of PSCBs connected using steel EECs. It was found that the steel pre-tensioned bolted EECs, reinforced with steel stiffeners and shear anchors, could be used to connect the precast HSC segmental beams via the internal pre-stressing technique.