• Title/Summary/Keyword: Pre-scheduling

Search Result 75, Processing Time 0.02 seconds

Heuristic Algorithms for Resource Leveling in Pre-Erection Scheduling and Erection Scheduling of Shipbuilding (조선 선행탑재 및 탑재 일정계획에서의 부하평준화를 위한 발견적 기법)

  • Woo, Sang-Bok;Ryu, Hyung-Gon;Hahn, Hyung-Sang
    • IE interfaces
    • /
    • v.16 no.3
    • /
    • pp.332-343
    • /
    • 2003
  • This paper deals with pre-erection scheduling and erection scheduling in shipbuilding. Among shipbuilding scheduling, the ship erection scheduling in a dock is one of the most important since the dock is the most critical resource in a shipyard. However, it is more reasonable to consider pre-erection scheduling and erection scheduling as unified because they compete with the common constrained resources such as labor, crane, space, and so on. It is very hard to consider two scheduling problems simultaneously, and hence, we approach them sequentially. At first, we propose space resource leveling heuristics in pre-erection scheduling given erection date. And then, considering the manpower resource determined by pre-erection scheduling, we also propose manpower resource leveling heuristics in erection scheduling. Various experimental results with real world data show that the proposed heuristics have good performance in terms of scheduling quality and time.

Development of the Pre-Dispatch Scheduling Algorithm in the Competitive Electricity Market (경쟁적 전력시장 하에서의 선행급전계획 알고리즘 개발에 관한 연구)

  • Chung, Kooh-Hyung;Kang, Dang-Joo;Kim, Bal-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.2
    • /
    • pp.260-267
    • /
    • 2007
  • Systematic studies on the dispatch scheduling algorithm can enhance the efficiency of electricity market operation. In addition, as the dispatching policies in competitive electricity markets directly affect the market participants' profits, the dispatch scheduling procedure should be reasonable, systematic, and transparent. In this paper, we propose an unconstrained/constrained pre-dispatch scheduling algorithm and develop corresponding programs applicable to wholesale electricity markets.

A Study on Scheduling System for Mold Factory Using Neural Network (신경망을 이용한 금형공장용 일정계획 시스템에 관한 연구)

  • Lee, Hyoung-Kook;Lee, Seok-Hee
    • IE interfaces
    • /
    • v.10 no.3
    • /
    • pp.145-153
    • /
    • 1997
  • This paper deals with constructing a scheduling system for a mold manufacturing factory. The scheduling system is composed of 4 submodules such as pre-processor, neural network training, neural networks and simulation. Pre-processor analyzes the condition of workshop and generates input data to neural networks. Network training module is performed by using the condition of workshop, performance measures, and dispatching rules. Neural networks module presents the most optimized dispatching rule, based on previous training data according to the current condition of workshop. Simulation module predicts the earliest completion date of a mold by forward scheduling with the presented dispatching rules, and suggests a possible issue date of a material by backward tracking. The system developed shows a great potential when applied in real mold factory for automotive parts.

  • PDF

Scheduling on the Pre-assembly Stage of Multiple Fabrication Machines (다중기계로 구성되는 조립전단계에서의 부품생산 일정계획)

  • 윤상흠
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.4
    • /
    • pp.63-71
    • /
    • 2003
  • This paper analyses a deterministic scheduling problem concerned with manufacturing multiple types of components at a pre-assembly stage composed of parallel fabrication machines. Each component part is machined on a fabrication machine specified in advance. The manufactured components are subsequently assembled into products. The completion time of a job(product) is measured by the latest completion time of its all components at the pre-assembly stage. The problem has the objective measure of minimizing the total weighted completion time of a finite number of jobs. Two lower bounds are derived and tested in a branch-and-bound scheme. Also, three constructive heuristic algorithms are developed based on the machine aggregation and greedy strategies. Some empirical evaluation of the performance of the proposed branch-and-bound and heuristic algorithms are also performed.

Development of the Pre-erection Block Arrangement System for Deckhouse (선실 PE장 정반배치 계획수립 시스템 개발)

  • Ha, Seung-Jin;Kim, Ji-On;Choi, Tae-Hoon
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.79-88
    • /
    • 2007
  • In this study, we improved the layout of deckhouse pre-erection area where erects the blocks and developed the pre-erection block arrangement system for the improvement of productivity and effectiveness. The major operating point of the pre-erection area is to fabricate as many as possible that has restrict area and working plate. The developed system has information management module, scheduling module, schedule control module, statistics module, and information integrate module. The heuristic algorithm is issued and evaluated with real data. And genetic algorithm is used for the evaluation of issued it.

  • PDF

Prototype of Block Tracing System for Pre-Erection Area using PDA and GPS (PDA 및 GPS를 이용한 옥외 작업장 블록 위치 추적 시스템 개발)

  • Shin, Jong-Gye;Lee, Jang-Hyun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.1 s.145
    • /
    • pp.87-95
    • /
    • 2006
  • There are hundreds of ship blocks which are under the block assembly, painting, and outfitting assembly works in the pre-erection shops of shipyard. Generally, each block is planned to be processed in a pre-erection shop according to the block type by the long-term production-scheduling before six months. However, many blocks can't be processed in the planned time and the planned shop since the before and after block-processing changes or delays the planned sequential works in pre-erection shops. Therefore, it is essential to monitor the current location of each block and work in process to cope with the changed situation of pre-erection shops. Present study integrates PDA, GPS, and CDMA not only to chase the location of each block but also to exchange the pre-erection work order and the work report between the production-scheduling server and the production managers in the pre-erection shops. This study shows a prototype for the block tracing and process monitoring in the pre-erection shops.

A Study on the Erection Scheduling in the Shipbuilding Using Constraint Satisfaction Technique (제약 만족 기법을 이용한 조선 산업에서의 탑재 일정 생성에 관한 연구)

  • Kim, Ki-Dong;Jang, Yong-Sung
    • Journal of Industrial Technology
    • /
    • v.19
    • /
    • pp.91-99
    • /
    • 1999
  • The dock is the most important resource in shipbuilding yard. Among the shipbuilding schedules, the ship erection schedule in a dock is preferentially built. As results of it, the other schedules(machining in plants, block assembly, pre-painting, pre-rigging, painting and etc) are made. In this study, ship erection scheduling is formulated using ILOG Scheduler. This study is to develop a new problem solving method for ship erection to make an effective schedule based on Constraint Satisfaction Technique(CST).

  • PDF

A Scheduling Method of Periodic Data in the Foundation Filedbus and Experimental Evaluation (Foundation Fieldbus에서 주기적 데이터 스케듈링 기법 및 실험적 평가)

  • Song Sung Min;Hong Seung Ho
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.11 no.2
    • /
    • pp.167-174
    • /
    • 2005
  • This paper experimentally validates the efficacy of scheduling method that satisfies the performance requirement of periodic data in the Foundation Fieldbus. The scheduling method allocates periodic data traffic to a bandwidth-limited fieldbus medium. The scheduling method generates schedule list that records schedule starting time and schedule period of each periodic data. This study developed an experimental model of a Foundation Fieldbus network system. Using the experimental model, this study showed that the scheduling method can be easily implemented in a practical Foundation Fieldbus network system. The results obtained from the experimental evaluation showed that the scheduling method restricts the delay of periodic data to a pre-specified bound.

A Study on the Heuristic-Based Yard Crane Scheduling Method Using Truck Arrival Information (트럭 도착 정보를 활용한 휴리스틱 기반 야드 크레인 스케줄링 방법)

  • Hwang, Sung-Bum;Jeong, Suk-Jae;Yoon, Sung-Wook
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.4
    • /
    • pp.45-56
    • /
    • 2019
  • Literatures have considered mathematical model that change the job order of shipper for improving the operation time of yard crane. However, on the real site, it is impossible to change the job order decided according to the shipper's arrival order. Therefore, operation managers have been utilized the relatively simple strategy that job control is better but the process time of yard crane is longer due to the growth of yard crane's interference time and empty drive time. This study proposed a new yard-crane scheduling approach that decided the job order before the shipper's truck arrived the yard terminal. We utilize the Container Pre-Information Notice estimating the arrival time of truck. We developed the container terminal simulation model for validation of the effect of proposed scheduling approach. The results show that the proposed scheduling reduced the interference delay time and empty moving time of yard crane and shipper's truck delay time.

A Development of Dispatch Schedule Program for TWBP Using Object Oriented Technique (객체지향기법을 이용한 도매전력시장에서의 급전계획 프로그램 개발)

  • Kim Gwang Won
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.3
    • /
    • pp.152-157
    • /
    • 2005
  • An objected-oriented programming(OOP) technique is introduced to dispatch schedules for TWBP. Some dispatch schedules such as constrained (pre)dispatch, unconstrained (pre)dispatch, and nominal self-dispatch schedule need to be peformed to make power market work. These dispatch schedules are similar but have some differences in required constraints, needed data, and scheduling time. Therefore, it makes the scheduling program simple to introduce the OOP technique to this problem: to have each instance of the OOP perform its own dispatch scheduling. The developed program adopts linear programming(LP) as an optimization tool and could consider some crucial constraints such as power balance, generation power limits, generation ramp-rates, power limitations of transmission lines, and power system security.