1 |
Kim, K-D., Woo, S-B. and Hahn, H-S. (2001). A Study on the Erection Scheduling for Shipbuilding Considering Resource Constraints. IE lnterfaces, 14(3), 218-226
|
2 |
Min. S-G., Lee, M-W., Moon, C-U., Chung. K-H. and Park, J-C (2000), A Genetic Algorithm Application for the Load Balancing of Ship Erection Process. IE Interfaces, 13(2), 225-233
|
3 |
Lee. J-W. and Kim, H-J.(1995), Erect ion Process Planning & Scheduling using Generic Algorithm, Transactions of the Society of Naval Architecture of Korea, 32(1), 9-16
|
4 |
Woo, S-B. (2001), Development of an Integrated Production Planning and Scheduling System for Shipbuilding, Technical Report. Institute for Advanced Engineering
|
5 |
Back, T-H., Chung, K-H. and Park. J-C, (1999), A Study on the Application of Resource Leveling Heuristic for Ship Erection Scheduling, IE Interfaces, 12(3), 354-361
|